scholarly journals AN OPTIMAL METHOD FOR SCHEDULING CONSTRUCTION PROJECTS INCLUDING REPETITIVE ACTIVITIES IN MANY UNITS

2009 ◽  
Vol 12 (18) ◽  
pp. 46-51
Author(s):  
Long Duc Luong

This paper presents an optimal method for scheduling construction projects including many repetitive activities in many similar units (e.g., high-rise bridges...). The objective of scheduling is to minimize the project duration. This method considers many types of activities with different characteristics (activities must be performed continuously to insure the continuity in their performances, or activities can allow interruptions in their performances) to generate a satisfactory schedule for project managers. This method uses a new scheduling algorithm to find the optimal start and finish times of activities, so that the project duration is minimized. A well-known example is used as an illustration to show advantages of this method to other methods.

Author(s):  
Ehab Soliman ◽  
◽  
Khaled Alrasheed ◽  

Project cash flow and contractor S-curve are tools that can be used to measure, control and anticipate project progress. Few studies dedicated to evaluate and judge the behaviour of the original S-curve. This study aims to evaluate the similarities and changes of construction projects S curves between different project types. More than 40 S-curves were collected from the state of Kuwait for different types of construction projects. The list of collected curves divided into six groups based on the type of client, no of buildings and number of floors. Statistical analysis used to compare the curves inside each group of projects. Statistical analysis using test of normality, T-paired test then Standard Euclidean Distance were applied to evaluate the similarity and changes between groups. This study revealed that there is a level of similarity of S-curves for high rise buildings and there is no similarity of S-curves for one or multi-building projects. The maximum gap between S-curves for one and high rise building laying in the middle part of project duration, while the maximum gap between S-curves for multi-building project laying in 70% to 80% of project duration. This study revealed that the variance of S-curve behaviour indicating there is no common attitude for all types of construction project types. This study can help construction stakeholders to anticipate their expected expenses and help in project cash flow management.


2020 ◽  
Vol 38 (7A) ◽  
pp. 1069-1076
Author(s):  
Layth T. Ali ◽  
Raid S. Abid Ali ◽  
Zeyad S. M. Khaled

Cost overrun in construction projects is a common phenomenon in Iraq. This might occur due to diversity of factors. This study aims to identify the factors influencing construction projects cost that are potentially controllable by main contractors. A field study through a questionnaire survey was directed to a sample of related Iraqi professional engineers from general contracting companies at both public and private sectors. Their opinions on the impact and frequency of each factor were investigated. The questionnaire offered (59) factors classified in (8) categories namely; legislations, financial and economic, design, contractual, site management, material, labor and equipment. The factors were ranked according to the highest Relative Importance Index (RII). The study revealed (10) major factors that are potentially controllable by main contractors namely; labor productivity, sub-contractors and suppliers performance, equipment productivity, site organization and distribution of equipment, experience and training of project managers, scheduling and control techniques, planning for materials supply, planning for equipment supply, materials delivery and planning for skilled labor recruitment. Recommendations to aid contractors and owners in early identification of these factors are also included in this study.


2021 ◽  
Vol 11 (9) ◽  
pp. 4122
Author(s):  
Young-Jun Park ◽  
Chang-Yong Yi

Construction quality is one of the primary management objectives relating to duration and cost for construction projects. Project managers struggle with minimizing duration and cost while maximizing quality for construction projects. In construction projects, duration and cost have management priorities. On the other hand, quality is considered a matter of achievement only when it reaches a certain level. Although the importance of quality control in construction management has been constantly discussed, it has still been sacrificed under the goal of shortening construction duration and reducing costs. This study presents a method for estimating the quantitative quality performance of construction operations in which the level of detail is breaking into the work task level for intuitive quality performance evaluation. For this purpose, quality weights of resources that have a proportional quality importance weight and quality performance indexes of resources are utilized for estimating the quantitative quality performance of construction operations. Quality performance estimation and the resource allocation optimization system is presented and validated using a construction simulation model.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benviolent Chigara ◽  
Tirivavi Moyo

Purpose The purpose of this study was to investigate the perceptions of construction professionals relative to factors that affect the delivery of optimum health and safety (H&S) on construction projects during the COVID-19 pandemic. Design/methodology/approach The study adopted a quantitative design which entailed the distribution of a web-based questionnaire among construction professionals, namely, architects, construction/project managers, engineers, H&S managers and quantity surveyors working for contractors and construction consultants in Zimbabwe. The data were analysed with descriptive and inferential statistics. Factor analysis was used to reveal interrelated significant sets of factors affecting the delivery of optimum H&S. Findings Factor analysis revealed nine components/factors: change and innovation-related, monitoring and enforcement-related, production-related, access to information and health service-related, on-site facilities and welfare-related, risk assessment and mitigation-related, job security and funding-related, cost-related and COVID-19 risk perception-related factors as the significant factors affecting the delivery of optimum H&S during the COVID-19 pandemic in Zimbabwe. Research limitations/implications The results highlighted the need for social dialogue among construction stakeholders to support initiatives that will enhance the delivery of H&S on construction projects. Construction stakeholders may find the results useful in highlighting the areas that need improvement to protect workers’ H&S during the pandemic. However, the small sample limits the generalisability of the results to construction sectors in other regions. Originality/value The study investigated factors affecting the delivery of optimum H&S during the COVID-19 to inform interventions to enhance H&S.


2018 ◽  
Vol 1 (1) ◽  
Author(s):  
Zhenli Yang

With the continuous development of urban construction projects in HebeiProvince, the rise and development of high-rise buildings and undergroundengineering, the design and research of foundation pit support structure has become more and more important. The design of the foundation pit support structure directly affects the settlement and position changes of the building itself and the surrounding stratum. In this paper, the characteristics of foundation pit support are analyzed, and the related theories of finite element analysis method are introduced. Combined with the actual situation of Hebei Province, the finite element analysis method is used to simulate the construction method of foundation pile anchor support structure system. The design was analyzed and studied.


2021 ◽  
Vol 56 (3) ◽  
pp. 473-484
Author(s):  
Zulkifli Lubis

The biggest threat that results in the project not being successful is failure to build a stakeholder project. Based on research on construction projects in developing countries, the lack of communication among workers due to cultural uniformity and the uniqueness of their respective regions can become work constraints that can affect implementation performance and productivity, namely, there is a 69.61% decrease in time performance. The main objective of this research is to analyze the role of communication management in improving the performance of construction project managers in developing countries, particularly the role of construction managers in implementing a construction project. This research uses a qualitative approach and a case study method. Sampling using purposive sampling. Forum Group Discussion to see how the opinions of construction project managers in Indonesia view the importance of communication management in the success of construction projects. The study results explain that the need for Public Relations Infrastructure management plays a role in ensuring various policies and communication to the public. This is a reflection of the effective function of public relations in the implementation of infrastructure development. In carrying out the construction, the construction project manager must pay attention to communication dynamics to support the success of infrastructure development projects. Contractors and other parties involved in infrastructure development must raise awareness of the essence of effective communication in fostering trust in the public concerned with infrastructure development.


2021 ◽  
Vol 13 (23) ◽  
pp. 13085
Author(s):  
Jan Kowalski ◽  
Mieczysław Połoński ◽  
Marzena Lendo-Siwicka ◽  
Roman Trach ◽  
Grzegorz Wrzesiński

Exceeding the approved budget is often an integral part of the implementation of construction projects, especially those where unforeseen threats may occur. Therefore, each construction investment should contain elements of risk forecasting, mainly in terms of the cost of its implementation. Only a small number of institutions apply effective cost control methods, taking into account the specifics of a given industry. Especially small construction companies that participate in the structure of the implementation of large construction projects as subcontractors. The article presents a method by which it is possible to determine, with certain probability, the final cost of railway construction investments carried out in Poland. The method was based on a reliable database of risk factors published in sources. In this article, the main presumptions of the original method are presented, which take into account the impact of potential, previously recognized, risks specific to railway investments, and enable project managers to relate them to the conditions where the implementation of a specific object is planned. The authors assumed that such a relatively simple method, supported by a suitable computational program, would encourage teams that plan to implement railway projects to use it and increase the credibility of their schedules.


2015 ◽  
Vol 764-765 ◽  
pp. 895-899
Author(s):  
Shiow Luan Wang ◽  
Thi Hoa Vu

Construction projects are becoming ever more complex and time driven, especially as the amount of project data and active project participants’ increase. For achieving a project success, project management not only must to meet time, cost, quality objectives, but also satisfies the project stakeholders needs related to the project management process. Project managers were difficult to effectively seizing, collecting and handling information which are generated from different systems. The elements of information presentation in web-based was contributed an important role to project management success. The purpose of this study is to provide a background to denote the enhancing project management via information presentation based on effective information technology/information systems which are emphasized in web-based.