ANALYSIS OF DESIGN SOLUTION FOR THE INSTALLATION OF PILE FOUNDATIONS DURING THE REPAIR OF THE ROAD SECTION

2019 ◽  
Vol 4 (3) ◽  
Author(s):  
Artem Gandelsman ◽  
Igor Gandelsman
2017 ◽  
Vol 14 (1) ◽  
pp. 53
Author(s):  
Arwan Apriyono ◽  
Sumiyanto Sumiyanto ◽  
Nanang Gunawan Wariyatno

Gunung Tugel is an area that located Patikraja Region, Southern Banyumas. Thetopography of the area is mostly mountainous with a slope that varies from flat to steep. Thiscondition makes to many areas of this region potentially landslide. In 2015, a landslideoccurred in Jalan Gunung Tugel. The Landslide occurred along 70 meters on the half of theroad and causing traffic Patikraja-Purwokerto disturbed. To repair the damage of the road andavoid further landslides, necessary to analyze slope stability. This study is to analyze landslidereinforcement that occurred at Gunung Tugel and divides into 3 step. The first step is fieldinvestigation to determine the condition of the location and dimensions of landslides. Thesecond step is to know the soil parameters and analyzes data were obtained from the field. Andthe final step is analyzed of the landslide reinforcement by using data obtained from thepreceding step. In this research, will be applied three variations of reinforcement i.e. retainingwall, pile foundation and combine both of pile foundations and retaining wall. Slope stabilityanalysis was conducted using limit equilibrium method. Based on the analysis conducted onthe three variations reinforcement, combine both of pile foundations and retaining wall morerecommended. Application of and combine both of pile foundations and retaining wall is themost realistic option in consideration of ease of implementation at the field. From thecalculations have been done, in order to achieve stable conditions need retaining wall withdimensions of 2 meters high with 2,5 meters of width. DPT is supported by two piles of eachcross-section with 0.3 meters of diameter along 10 meters with 1-meter in space. Abstrak: Gunung Tugel adalah salah satu daerah yang terletak di Kecamatan PatikrajaKabupaten Banyumas bagian selatan. Kondisi topografi daerah tersebut sebagian besar berupapegunungan dengan kemiringan yang bervariasi dari landai sampai curam. Hal inimenyebabkan banyak daerah di wilayah Gunung Tugel yang berpotensi terjadi bencana tanahlongsor. Pada tahun 2015, peristiwa longsor kembali terjadi di ruas Jalan Gunung Tugel.Kelongsoran yang terjadi sepanjang 70 meter pada separuh badan jalan tersebut menyebabkanarus lalu lintas patikraja-purwokerto menjadi terganggu. Untuk memperbaiki kerusakan jalandan mencegah kelongsoran kembali, diperlukan analisis perkuatan tanah terhadap lerengtersebut. Studi analisis penanggulangan kelongsoran jalan yang terjadi di Gunung Tugel inidilakukan dengan tiga tahapan. Tahapan pertama adalah investigasi lapangan untukmengetahui kondisi lokasi dan dimensi longsor serta mengambil sampel tanah di lapangan.Tahap kedua adalah melakukan pengujian parameter tanah dan analisis data yang diperolehdari lapangan. Tahapan yang terakhir adalah analisis penanggulangan longsor denganmenggunakan data yang diperoleh dari tahapan sebelumnya. Pada penelitan ini, akanditerapkan tiga variasi perkuatan lereng yaitu dinding penahan tanah (DPT), turap dan DPTyang dikombinasikan dengan pondasi tiang. Analisis stabilitas lereng dilakukan dengan metodekeseimbangan batas. Berdasarkan hasil analisis yang dilakukan terhadap ketiga variasiperkuatan, DPT dengan kombinasi tiang pancang lebih direkomendasikan. Penerapan DPTyang dikombinasikan dengan minipile merupakan pilihan yang paling realistis denganpertimbangan tingkat kemudahan pelaksanaan di lapangan. Dari perhitungan yang telahdilakukan, untuk mencapai kondisi stabil diperlukan DPT dengan dimensi tinggi 2 meterdengan lebar bawah 2,5 meter. DPT tersebut ditopang oleh dua tiang tiap penampangmelintang dengan diameter 0,3 meter sepanjang 10 meter dengan jarak antar tiang 1 meter.kata kunci: tanah longsor, perkuatan tanah, metode keseimbangan batas


1942 ◽  
Vol 79 (4) ◽  
pp. 241-252 ◽  
Author(s):  
C. A. Matley ◽  
Frank Raw

The rocks exposed along the road between Linstead and Guy's Hill, Jamaica, were described by Dr. C. T. Trechmann in this magazine in 1936 (pp. 259–260). The chief object of his account was to prove that the igneous rocks there were intrusions later than the associated Cretaceous and Tertiary limestones, which, according to him, had been metamorphosed into hornfelses, some of which, he stated later (1937, p. 561), he knew to have an “igneous” appearance under the microscope, “which tends to support my contention that in Jamaica we have sedimentaries altered in situ into rocks that would ordinarily be classified as igneous.” Dissent from his descriptions and interpretations was expressed by C. A. M. (Matley, 1937, pp. 501–3), the criticisms being mainly based on an examination of Trechmann's own microscope slides by F. R. A visit to Jamaica by C. A. M. in 1939 allowed him to study this road and to collect a suite of rocks for petrological examination. The results show that Trechmann's interpretation cannot be sustained. There is no granodiorite or other plutonic rock present, no metamorphism hornfelsing the sedimentary rocks, and no igneous intrusions into the Tertiary limestones.


Author(s):  
Олег Закирович Халимов

В статье проанализированы трудности в процессе строительства автомобильной дороги от Братского моста через Енисей в сторону Абакана, связанные с отсутствием учета на стадии проектирования осложнившихся гидрогеологических условий, влияющих на опускание моста и дороги. Оползневые процессы, созданные искусственно при сооружении выемки дна автомобильной дороги от Братского моста более 40 лет развиваются на участке дороги Абакан-Подсинее перед железным и автодорожным мостом через Енисей. Как и в первом случае на стадии проектирования не выполнены гидро-геологические исследования. The article analyzes the difficulties in the process of construction of the highway from the Bratsk bridge over the Yenisei river to Abakan, associated with not taking into account the complicated hydrogeological conditions at the design stage, associated with the lowering of the bridge and road. Landslide processes created artificially during the construction of the dredging of the road bottom from the Bratsk bridge have been developing for more than 40 years on the Abakan-Podsinee road section in front of the railway and road bridge over the Yenisei. As in the first case, hydrogeological studies were not performed at the design stage.


2015 ◽  
Vol 9 (2) ◽  
pp. 114
Author(s):  
Supiyono, Dwi Ratnaningsih, Rudy Ariyanto

Progress of a country in line with the progress of traffic (transport). Fluency in traffic is determined by the smoothness of traffic on the road. Problems often arise on the highway is congestion at the intersection. Neither was signalized intersections and signalized intersections. Problems at the intersection is less accuracy green flame at the intersection with the number of vehicles in a segment. A road with high traffic volume vehicle green flame low while other road traffic volume small green flame length. So in a long queue roads, while other roads are deserted while still green flame.     This study aims to minimize the occurrence of conflic at the intersection of green flame. Research will make iterations in the intersection, where a road section which will be nominated densely green flame, the flame of the green according to the volume of traffic on these roads. Each road will be a green flame in accordance with the volume of traffic, without having to change any program there is a change in traffic volume.The degree of saturation of the calculation obtained by ....Keywords: roads, hight traffic, progressive intersection, degree saturation


2021 ◽  
pp. 355-355
Author(s):  
Davor Vujanovic ◽  
Sladjana Jankovic ◽  
Marko Stokic ◽  
Stefan Zdravkovic

In this paper, research is done in the influence of different terrain and traffic conditions on road sections on the driver?s driving performances, i.e. on the car energy efficiency and CO2 emission. A methodology aimed at determining to which extent unfavorable traffic and/or terrain conditions on a road section contribute to the driver?s worse driving performances, and also to determine when the driver?s aggressive driving style is responsible for greater fuel consumption and greater CO2 emission is proposed. In order to apply the proposed methodology, a research study was carried out in a cargo transportation company and 12 drives who drove the same vehicle on five different road sections were selected. As many as 284 014 of the instances of the data about the defined parameters of the road section and the driver?s driving style were collected, based on which and with the help of machine learning a prediction of the scores for the road section and the scores for the driver?s driving style was performed. The obtained results have shown that the proposed methodology is a useful tool for managers enabling them to simply and quickly determine potential room for increasing the energy efficiency of the vehicle fleet and decreasing CO2 emission.


2019 ◽  
Vol 2 (1) ◽  
pp. 75
Author(s):  
Philipus Resato Nahak ◽  
Yosef Cahyo ◽  
Sigit Winarto

The increase in traffic volume will cause a decrease in service due to decreased road capacity due to an increase in side constraints and due to the increase in traffic volume itself, which will ultimately cause the level of road saturation to increase. The situation occurred in the Umasukaer road section of the Malacca Regency. Therefore it is necessary to address improvements in the quality of the road in order to meet the feasibility of transportation facilities by taking into account the existing technical requirements. The results of planning found that through the 2015 LHR survey data with a prediction of an increase in traffic density of 6% per year, the LHR was obtained with a planned age of 7 years = 2540.7 vehicles/day/department and a 20-year plan life LHR = 5419.1 ked/day / major. The results of a gradual construction planning pavement study can be concluded that the planning model that has been designed is effective in strengthening road construction in accordance with existing technical requirements and efficient in terms of financing. The final results of gradual construction pavement thickness results are: Ashburton thickness (MS 744) = 8 cm, Ashburton (MS 744) = 13 cm, broken stone (CBR 100) = 20 cm, Sirtu (CBR 50) = 10 cm and CBR subgrade 5%. Pertambahan volume lalu lintas akan menyebabkan penurunan layanan diakibatkan menurunnya kapasitas jalan karena adanya peningkatan hambatan samping maupun karena beratambahnya volume lalu lintas itu sendiri yang pada akhirnya akan meyebabkan tingkat kejenuhan jalan meningkat. Keadaan tersebut terjadi ruas jalan Umasukaer Kabupaten Malaka, oleh karena itu perlu adanya penanganan perbaikan kualitas jalan agar memenuhi segi kelayakan sarana transportasi dengan memperhatikan syarat-syarat teknik yang ada. Hasil perencanaan didapatkan bahwa melalui data survey LHR tahun 2015 dengan prediksi peningkatan kepadatan lalu lintas sebesar 6% pertahun maka didapatkan LHR dengan umur rencana 7 tahun = 2540,7 kend/hr/jurusan dan LHR umur rencana 20 tahun = 5419,1 ked/hr/jurusan. Hasil studi perencanaan perkerasan konstruksi bertahap dapat diambil kesimpulan bahwa model perencaaan yang telah dirancang efektif dalam memperkerasa konstruksi jalan sesuai dengan syarat teknis yang ada serta efisien dalam hal pembiayaan. Hasil akhir tebal perkerasan konstruksi bertahap diperoleh hasil: Ketebalan Asbuton (MS 744) = 8 cm, Asbuton (MS 744) = 13 cm, batu pecah (CBR 100) = 20 cm, Sirtu (CBR 50) = 10 cm dan CBR tanah dasar 5%.


Author(s):  
Anastasiya N. Zhukova ◽  
◽  
Marina S. Shapovalova ◽  

Computerized traffic modeling makes it possible to find out the modification needs to assess the traffic flow on the roads and detect likely problem areas in order to take timely measures to eliminate them. Competent preparation of a road network formation plan based on the acquired information makes it possible to reduce the load on the road transport line, avoid traffic jams, and also reduce the average time spent by drivers on the roads. The macroscopic and microscopic models of the cars flow were analyzed by authors to implement the computer model. The article considered the model of the cellular automata by Nagel–Schreckenberg, with the author’s addition that takes into account the presence of the road sections inaccessible for driving in. The need to modify the lane change algorithm was implemented: the condition of the need to change the lane when car is meeting an inaccessible road section was added. And also the “polite” drivers algorithm for bypassing inaccessible areas with a high density of the traffic flows was proposed. Such a model is realized on Python programming language. An analysis of vehicles behavior with different traffic density and location of inaccessible road sections for two- and three-lane roads was carried out based on that model modification.


2015 ◽  
Vol 801 ◽  
pp. 102-106
Author(s):  
Anca Maria Moscovici

The control of roads traffic, of noise, of all other problems which occur on national road sections are much more manageable through Geographic Information Systems. The possibility of changing parameters in real time from a database, allows rapid information on problems encountered and efficient solutions at a more sustained rate.This paper presents a proposed solution to improve the Geographic Information System by adding noise data, by carrying out a case study on the road section Sag - Voiteg that connects Timisoara (Romania) and Belgrade (Serbia). The existing GIS system was established in 2012 according to the legislation in force at the time. As Year 2017 will mark the next stage of issuing the noise maps according to the rules set by CNOSSOS-EU, the measurements done for this study will follow these new methods. CNOSSOS-EU accurately describes the objectives and methodology requirements, establishes clear criteria for road traffic and sound propagation.The advantage of uniformity standards and methods of control in all EU Member States allows comparative studies on pollution, the number of people affected, etc.


Materials ◽  
2020 ◽  
Vol 13 (14) ◽  
pp. 3058
Author(s):  
Julia Rosales ◽  
Francisco Agrela ◽  
José Ramón Marcobal ◽  
José Luis Diaz-López ◽  
Gloria M. Cuenca-Moyano ◽  
...  

Stabilization is a traditional strategy used to improve soils with the main objective of ensuring that this base is compliant with the technical specifications required for the subsequent development of different infrastructures. This study proposes the use of commercial nanomaterials, based on a solution of silicates, to improve the technical characteristics and bearing capacity of the expansive soil. A physical–chemical property study was carried out on the additive nanomaterial. Subsequently, different mixtures of expansive soil, selected soil and artificial gravel with quicklime and commercial nanomaterials were developed to evaluate the improvement obtained by the use of nanomaterials in the technical characteristics of the soil. Compressive strength and the Californian Bearing Ratio index were considerably increased. A full-scale study was carried out in which the nanomaterial product was applied to two different sections of stabilized road compared to a control section. The results obtained showed that the use of nanomaterial led to the possibility of reducing the control section by 30 cm, thus achieving less use of quicklime and a mechanical means for preparing the road section. The use of commercial nanomaterial improved the behavior of the stabilized sub-base layer. Through life cycle assessment, this study has shown that the use of nanomaterials reduces the environmental impact associated with soil stabilization.