scholarly journals Causes of Multi Years Contract Project Delay

Author(s):  
Faslan Syam Sajiah

Delay in construction projects is considered one of the most common problems, causing a multitude of negative effects on the project and its participating parties. Delays can cause losses to the economy, cost overruns, disputes, arbitration, abandonment, and poor quality of finished project. This paper aims to identify the main causes of delay in multi years infrastructure projects in Indonesia. Based on secondary data from documents for Proposals and Completion of Extension of Multi-Year Contract Approval in the FY 2018 and 2019 which are processed at the Ministry of Finance, 19 factors that caused the delay were identified. The importance indexes measured and ranked the level of importance of the delay factors. The main five causes of time delays included land acquisition problem, design change, failed tender, inadequate site investigation, and shortage of construction materials. Majority of the cause is attributed to Ministry/Institution as project owner. The results can help project owners, contractors, and consultants in understanding the reasons for the delay, so that each party, especially the Ministry/Agency as the project owner, can eliminate or minimize these causes.

2019 ◽  
Vol 8 (2) ◽  
pp. 4-9
Author(s):  
Abdurezak Mohammed Kuhil ◽  
Neway Seifu

The time overrun in construction projects has become one of the most common problems in the industry that cause multitude of negative effects on the projects and its stakeholders. This study focused on assessing the main causes of delay in public building construction projects in Addis Ababa Administration mainly undertaken by grade one contractors. In these projects, 42 delay causing events in the Addis Ababa public building construction projects were identified and categorized in to five main category groups, and the most important and critical causes of public building construction delay causing factors were evaluated and ranked based on the RRI(Ranking and computation of relative importance index)values from the data collected in a questionnaire survey of three groups of respondents- clients, consultant and contractors in the construction industry. The survey findings revealed the top ten factors that cause construction delays in the public building construction projects in Addis Ababa are: (1) Difficulty in project financing (poor financial system); (2) Poor Project management system;(3) Delay in issuance of designs and working drawings; (4) Shortage of availability of imported construction materials and goods on market; (5) Design errors and complexity of designs;(6)Delay in progress payments for completed works; (7) Late start & resource mobilization to site; (8) Financing problems; (9) Inaccurate Site investigation Report;(10) Price Inflation. Furthermore, the ranking of the factors tested the agreement among the respondents and finally agreement test reveal that there appears a positivecorrelation between the groups in noticing and ranking the set of delay causes. The study recommended in general and particularly to all the parties for mitigating factors causing time overrun.


Author(s):  
Nur Nabihah Abd Razak ◽  
Intan Rohani Endut ◽  
Siti Akmar Abu Samah ◽  
Ahmad Ruslan Mohd Ridzuan ◽  
Sabihah Saaidin

Quality has been the main issue in construction projects. In handling it, the quality control techniques during construction process are required to thoroughly carry out in order to avoid any mistakes which lead to bigger problem such as poor quality of project outcomes. The implementation of quality control techniques during site inspection is able to discard all possible negative effects towards construction projects. There are three quality control techniques that have been used during site inspection known as Project Quality Plan (PQP), Inspection Test Plan (ITP) and Checklist. In order to implement these techniques, there are some matters that need to be identified and overcome. Therefore, this study has been carried out to identify the challenges in implementation of quality control techniques during site inspection. To achieve the objective, the survey questionnaire was distributed among G5, G6 and G7 contractors’ in Malaysia. A total of 82 useable questionnaires were received and analysed using factor analysis. The challenges were clumped and categorized into respective groups. The seven groups were renamed, namely: (1) attitude, (2) documents, (3) operations, (4) management, (5) workers, (6) information and (7) methods. This study helps to improve the quality control techniques especially during site inspection among Malaysian contractors.


Author(s):  
Peter Dodzi Kwasi Agbaxode ◽  
Sitsabo Dlamini ◽  
Ehsan Saghatforoush

A meta-synthesis approach was used to identify, synthesize, and categorize appropriately factors in the literature that contribute to design documentation quality. The categories include factors on quality attributes, quality indicators, and quality-influencing factors. Findings indicate that the quality of design documentation in practice is unsatisfactory, therefore, there is a need for collaboration between the owner, designers, and end-users to improve design documentation quality. The results offer pragmatic data on design documentation quality in the construction industry between the years 1992 and 2019. However, further research on the significant impacts of poor-quality design documentation on construction projects is recommended.


2021 ◽  
Vol 14 ◽  
pp. 1-9
Author(s):  
Jeffrey Boon Hui Yap ◽  
Shi Min Tan

Construction practitioners recognise that rework is undesirable due to the detrimental effects. While rework literature has examined rework causation factors in construction projects, the problem continues to plague the industry resulting in poor delivery performance. To better understand this phenomenon and given the scarcity of Malaysian-based rework study, a questionnaire survey involving 130 Malaysian construction practitioners (consultants, contractors and clients) were undertaken to obtain feedback about nature, implications, causes and solutions for rework. Data were analysed using descriptive statistical techniques to prioritise the variables studied. From the analyses, rework is a causal factor for delays and cost overruns, higher wastage and productivity inhibitor. The findings revealed the leading causes of rework are poor quality management, improper planning, lack of communication, design changes and poor subcontractor management. Some practical rework minimisation approaches are also suggested to better manage and prevent rework towards enhanced project performance.


2022 ◽  
pp. 135910452110618
Author(s):  
Konstantina Vasilopoulou ◽  
Angeliki Skoutari ◽  
Konstantinos Siomos ◽  
Nikolaos Christodoulou

Background: The diagnosis of a childhood malignancy and the following period are very stressful for the little patient and the whole family. Depression, anxiety, and poor quality of life (QoL) are some of the negative effects of pediatric cancer to the children and their parents. Family therapeutic interventions aim to improve mental health and QoL of these children. Methods: A systematic search of the electronic database PubMed was conducted for articles that studied the effect of family therapeutic interventions on mental health and QoL of children with cancer. Results: A total of 634 articles were evaluated, of which 10 articles met the inclusion criteria. A percentage of 70% of the studies, representing seven different types of interventions, seemed to be beneficial for the participant’s mental health and QoL. The remaining three studies did not significantly improve mental health and QoL. Conclusion: The results of our review indicate that family psychosocial interventions are beneficial for children with cancer. These children and their families are a growing population requiring more patient-centered, time flexible interventions which may enhance family bonding and patients’ positive emotions.


Author(s):  
Vanissorn Vimonsatit ◽  
Alex Chai Mui Foo

This paper presents findings of an investigation into benefits of using Building Information Modelling (BIM) in construction projects. The research methodology includes a review of BIM development and achievement in construction industry, questionnaire survey, interview, and content analysis of secondary data. Data was collected and analyzed to identify the various benefits reflected from BIM implementation in addressing common problems experienced by the construction industry. The review and survey results indicate that a high frequency of occurrence of time and cost overruns occur in construction projects. Contributing factors were mainly rework, poor planning, documents delivery and approval, constructability issues, resources and weather condition. While some of the factors were unpreventable, BIM could be used as a tool to eliminate problems causing time and cost overruns. Various project benefits have been reflected through the content analysis of project case studies. It was found that time was the most positively influenced by the use of BIM followed by coordination, procurement, communication, cost and change of scope of the project, and lastly, risk.


2019 ◽  
Vol 65 (3) ◽  
pp. 61-74
Author(s):  
R. Trach ◽  
K. Pawluk ◽  
M. Lendo-Siwicka

AbstractThe collapse of the Soviet Union was the cause of a significant decline in many economies of the newly created countries. However, many of them, including the Ukrainian economy, are slowly recovering. One of the largest branches of the economy in this country is construction, which, despite political turmoil, is constantly growing, especially in the private real estate development sector. Despite the fact that the construction market is constantly developing, it is limited by the costs of rework and alterations resulting from many reasons. The key negative effects of modifications to the results of the project are exceeding the budget and time of project implementation, dissatisfaction with the project team, violation of contractual requirements and lowering the quality of the final product. Therefore, the purpose of this article was to determine the reasons for the emergence of rework in the in Ukraine by analyzing the results of surveys conducted among construction enterprises.


2020 ◽  
Vol 5 (9) ◽  
pp. 1049-1053
Author(s):  
Onyekachukwu G. Odenigbo ◽  
Koleola T Odusami ◽  
Kevin C. Okolie ◽  
Vincent C. Okafor

Delay in payment to contactors and other relevant parties have caused serious problem on the successful execution of construction projects in the country. It causes several problems to the contractor and other participants. The aim of this study is to determine the causes of delayed payments in the construction industry. The objective of this study is to identify the causes of delayed payment. In order to obtain valid data for the study, questionnaires were designed and distributed to a randomly selected sample of one hundred individuals among contractors, subcontractors, consultant and clients in the Nigerian construction industry. In total, eighty five completed questionnaires were returned and then analysed statistically. The total mean score was used to determine the ranking of the results of the study. Client’s disagreeing on the valuation of work done, slow processing of variation orders and poor quality of works were the major causes of delayed payment identified in the study. It was recommended that the stakeholders should work as a team in the execution of project to avoid bottlenecks usually encountered in agreeing contractors‟ payment. In conclusion, if the necessary action can be enforced, the problem of delayed payment can be reduced drastically.


2021 ◽  
Vol 13 ◽  
Author(s):  
Ogunode Niyi Jacob ◽  
Ahaotu Godwin Ndubuisi ◽  
Obi-Ezenekwe Unoaku Constance

This paper centers its discussion on“the effects ofinsecurity on school administration in the Nigerian educational institutions”. Secondary data were used to support the points raised in the article. The data were sourced from print materials and online publications by recognized institutions and individual authors. This paper identified unemployment, poverty, illiteracy, marginalization, political factors, international influence, and communal crisisas the bane of insecurity in the Nigeria. This paper also identified loss of manpower in educational institutions, poor quality of education, destructions of infrastructural facilities, brain-drain, closure of educational institutions, discouragement of educational pursuit by children, internal displacement of learners,reduction of private investment in education and inadequate funding of education as the impact of insecurity on school administration in Nigeria. In order to address the challenges of insecurity on school administration in Nigeria, the paper recommends among other things:That government should ensure that, the political will to fight all forms of insecurity in the country through the application of best strategies are honestly and sincerely put in place.


2019 ◽  
Vol 14 (2) ◽  
pp. 289-291
Author(s):  
Mohammad Heidari ◽  
Neda Eskandary ◽  
Seyedeh Samaneh Miresmaeeli

ABSTRACTIn November 2017, a disruptive earthquake occurred in Western Iran. After the major earthquake in Kermanshah, most affordable buildings such as a hospital in Islamabad and a dozen schools were destroyed. According to experts, a dangerous location (construction on the fault), poor quality of concrete, inappropriate connection of the facade to the structure, the use of undesirable construction materials, and low quality of non-structural components are considered as the main reasons for these damages. Regarding the role of government in the developing countries, construction policies should be modified and new policies should be implemented to enhance the structural and non-structural resilience in the buildings.