scholarly journals Contextual Communicative Competence in Multinational Infrastructure Projects

Buildings ◽  
2021 ◽  
Vol 11 (9) ◽  
pp. 403
Author(s):  
Anna-Therése Järvenpää ◽  
Tina Karrbom Gustavsson

Communication is dynamic, social, challenging, and a key quality factor for construction projects. This is especially the case in multinational and inter-organizational infrastructure projects where factors like culture and language differ among the involved actors. As infrastructure projects usually extend over longer periods of time, collaborative relationships need to be established in which the actors can develop, for example, mutual understanding, learning, and efficient working routines. By building on empirical data from contemporary infrastructure projects, we explore how international contractors and a large public client communicate in multinational infrastructure projects (i.e., what the challenges are and what competences are needed). The analysis is based on the linguistic framework of communicative competence, and we contribute to the development of collaborative models in construction project management by suggesting the concept of contextual communicative competence.

2021 ◽  
Vol 13 (11) ◽  
pp. 6376
Author(s):  
Junseo Bae ◽  
Sang-Guk Yum ◽  
Ji-Myong Kim

Given the highly visible nature, transportation infrastructure construction projects are often exposed to numerous unexpected events, compared to other types of construction projects. Despite the importance of predicting financial losses caused by risk, it is still difficult to determine which risk factors are generally critical and when these risks tend to occur, without benchmarkable references. Most of existing methods are prediction-focused, project type-specific, while ignoring the timing aspect of risk. This study filled these knowledge gaps by developing a neural network-driven machine-learning classification model that can categorize causes of financial losses depending on insurance claim payout proportions and risk occurrence timing, drawing on 625 transportation infrastructure construction projects including bridges, roads, and tunnels. The developed network model showed acceptable classification accuracy of 74.1%, 69.4%, and 71.8% in training, cross-validation, and test sets, respectively. This study is the first of its kind by providing benchmarkable classification references of economic damage trends in transportation infrastructure projects. The proposed holistic approach will help construction practitioners consider the uncertainty of project management and the potential impact of natural hazards proactively, with the risk occurrence timing trends. This study will also assist insurance companies with developing sustainable financial management plans for transportation infrastructure projects.


2015 ◽  
Vol 1 (1) ◽  
pp. 16
Author(s):  
Irena Papa

Communicative language teaching has become a familiar part of the landscape of language teaching in the last three or four decades. Teachers who perceive the objectives of teaching foreign languages associated with learning intercultural competence will be more inclined to make the process of teaching foreign languages more intercultural than teachers who perceive objectives as related to the acquisition of communicative competence. In this paper the relationship between culture and language is going to be explored by focusing on their role and impact in the process of learning languages and education.


2021 ◽  
Vol 236 ◽  
pp. 05002
Author(s):  
Longbo Zhang ◽  
Hao Liu

BIM technology can participate in the entire process of building construction projects, using a three-dimensional way to restore all links involved in the process of building production. This intuitive and clear presentation method helps architects correct and quickly repair existing loopholes in a timely manner, ensure the smooth development of construction projects, improve efficiency and reduce losses due to project delays.


2020 ◽  
Vol 13 (6) ◽  
pp. 119
Author(s):  
Johnson Matu ◽  
Dorothy Ndunge Kyalo ◽  
John Mbugua ◽  
Angeline Sabina Mulwa

This paper examines the influence of stakeholder participation in project execution on completion of road projects implemented by Kenya Urban Roads Authority. Descriptive research survey design was used for collection of both quantitative and qualitative data. Analysis was performed using correlation and regression analysis. The results were r = 0.796, R2 = 0.634, F (4, 209) = 90.503 and p<0.000<0.05. The findings revealed that stakeholder participation in project execution showed a strong, positive and statistically significant relationship with completion of urban road transport infrastructure projects and accounted for 63.4% of total variation in such projects. The study recommends government agencies should endeavour should work together during project implementation to ensure that service lines and acquisition of land is done ahead of time to avoid delay in completion. This will aim at ensuring quality work is achieved by both the client and the consultant through a collaborative stakeholder engagement. In conclusion, the findings of this study will shape the future of road construction and stakeholder engagement in road construction projects.


Author(s):  
Gladys Lechini ◽  
Maria Noel Dussort ◽  
Agustina Marchetti

Abstract China’s intention to go global has been clear since Xi Jinping assumed power, displaying its grand strategy. Infrastructure projects supporting physical connectivity reveal China’s policies to expand its actions beyond the regional environment and consolidate its power projection. The Going Out policy has been the tool to back up Chinese investments in infrastructure, and African countries have offered a good opportunity to show what can be done in an almost bare terrain. Nigeria and Kenya are good examples to empirically demonstrate China’s intentions, as they have railway remodelling or construction projects underway.


2019 ◽  
Vol 19 (1) ◽  
Author(s):  
Tharun Dolla ◽  
Boeing Laishram

Prequalification (PQ) is a significant process in the selection of private sector for the delivery of civil infrastructure projects.  But, the extant literature, for the most part, focused on PQ of construction projects.  The need for setting proper PQ, i.e., criteria and corresponding limits in public-private partnership (PPP) infrastructure projects, especially municipal solid waste (MSW) projects is still a lacuna in the body of knowledge of Indian PPPs.  To this end, this paper identified PQ criteria using content analysis of the sample of MSW projects. These identified criteria were subjected to regression modeling. These results were compared with the results of well-matured highway sector to draw comparison with MSW projects.  The practical implications are that urban local bodies (ULBs) are but less competent and less uniform in the rationale of setting the PQ criteria and limits.  This paper suggests that lowering the technical and financial PQ limits considering the market orientation will help in bringing more competitive bidders into the bidding.   Since MSW is in a very nascent stage of application of PPP, the study results could lay directions for future project procurement to discern right limits for right project sizes.


Mathematics ◽  
2019 ◽  
Vol 7 (12) ◽  
pp. 1149 ◽  
Author(s):  
Tingting He ◽  
Guiwu Wei ◽  
Jianping Lu ◽  
Cun Wei ◽  
Rui Lin

Since the reform and opening up, Chinese economic and social development has undergone great changes, and the people’s living standards have improved markedly. For the national economy, the engineering construction is not only a carrier for specific economic tasks, but also a driving force for rapid and sustained economic development. With the continuous expansion of the scale of construction projects, safety management problems of construction projects are constantly exposed. How to effectively avoid accidents has become an important issue to be solved urgently in the construction industry. This paper mainly evaluates human factors in the process of construction project management, such as workers’ proficiency, workers’ safety awareness, technical workers’ quality, and workers’ emergency capacity, with the purpose of helping China’s construction projects proceed smoothly. In this research, we provide a multiple attribute group decision-making (MAGDM) technique based on Pythagorean 2-tuple linguistic numbers (P2TLNs) and the VIseKriterijumska Optimizacija I KOmpromisno Resenje (VIKOR) method for evaluating the human factors of construction projects. P2TLNs are used to represent the performance assessments of decision makers. Relying on a P2TLWA operator, P2TLWG operator, and the essential VIKOR method, a general framework is established. An application is presented to test the validity of the new method, and a comparative analysis with two algorithms and the P2TL-TODIM method is illustrated with detail.


2019 ◽  
Vol 50 (2) ◽  
pp. 226-242 ◽  
Author(s):  
José I. Ortiz ◽  
Eugenio Pellicer ◽  
Keith R. Molenaar

This research describes the managerial approaches that contractors follow to determine different types of contingencies in construction project management. Two large Spanish general contractors were selected for an in-depth analysis. Interviews and surveys were conducted with six additional companies to explore the external validity of the findings. Managers constrain time and cost buffers through project objectives, applying heuristics to determine inventory buffers. The management of capacity buffers is entrusted to subcontractors. The contractors take advantage of scope and quality buffers to meet project objectives but rarely share these buffers with the owner, unless the owner is an internal client.


2011 ◽  
Vol 243-249 ◽  
pp. 6362-6368
Author(s):  
Yan Zhang ◽  
Chang Jiang Liu

In the field of engineering and construction, unqualified construction quality, time delays, cost more than expected phenomena to occur. Because of these characteristics such as its large-scale construction projects, long cycle, the production of single and complex, there is greater risk than the production of general products, the risk increases the difficulty of construction project management, operating costs and the possibility of potential losses, therefore, risk management emerged and become an increasingly important integral part of project management. In this paper, fuzzy analytic hierarchy be used to construction project risk assessment, and to order the sort of each risk in order to prevent significant risks. On an actual project - the new stadium construction in Weifang City risk management case study, the reduction of risk of project failure is expected, but also the project is hoped for other industries to provide some reference for risk management.