scholarly journals Transient Simulation of Geothermal Combined Heat and Power Generation for a Resilient Energetic and Economic Evaluation

Energies ◽  
2019 ◽  
Vol 12 (5) ◽  
pp. 894 ◽  
Author(s):  
Tim Eller ◽  
Florian Heberle ◽  
Dieter Brüggemann

Geothermal power plants based on the organic Rankine cycle (ORC) are used to convert the thermal power of brine into electricity. The efficiency and profitability of these power plants can be increased by an additional heat supply. The purpose of this study is to evaluate different combined heat and power (CHP) concepts for geothermal applications by thermodynamic and economic considerations. Therefore, a dynamic simulation model of a double-stage ORC is developed to perform annual return simulations. The transient ORC model is validated in a wide range by operational data of an existing power plant in the German Molasse Basin. A district heating system is considered and the corresponding heat load profiles are derived from a real geothermal driven heating network. For CHP, parallel and combined configurations are considered. The validation of the transient model is satisfying with a correlation coefficient of 0.99 between the simulation and real power plant data. The results show that additional heat extraction leads to a higher exergetic efficiency and a higher profitability. The exergetic efficiency and the profitability are increased by up to 7.9% and 16.1%, respectively. The combined concept shows a slightly better performance than the parallel configuration. The efficiency can be increased by up to 1.3%. In economic terms, for CHP the annual return can be increased by at least 2,500,000 €. In principle, the dynamic model shows reliable results for high power gradients. This enables an investigation of geothermal ORC models for the reserve market in future works.

2020 ◽  
Vol 209 ◽  
pp. 03023
Author(s):  
Mikhail Sinkevich ◽  
Anatoliy Kosoy ◽  
Oleg Popel

Nowadays, alternative thermodynamic cycles are actively studied. They allow to remove CO2, formed as a result of fuel combustion, from a cycle without significant energy costs. Calculations have shown that such cycles may meet or exceed the most advanced power plants in terms of heat efficiency. The Allam cycle is recognized as one of the best alternative cycles for the production of electricity. Nevertheless, a cycle of compressorless combined cycle gas turbine (CCGT) unit is seemed more promising for cogeneration of electricity and heat. A comparative analysis of the thermal efficiency of these two cycles was performed. Particular attention was paid to ensuring equal conditions for comparison. The cycle of compressorless CCGT unit was as close as possible to the Allam cycle due to the choice of parameters. The processes, in which the difference remained, were analysed. Thereafter, an analysis of how close the parameters, adopted for comparison, to optimal for the compressorless CCGT unit cycle was made. This analysis showed that these two cycles are quite close only for the production of electricity. The Allam cycle has some superiority but not indisputable. However, if cogeneration of electricity and heat is considered, the thermal efficiency of the cycle of compressorless CCGT unit will be significantly higher. Since it allows to independently regulate a number of parameters, on which the electric power, the ratio of electric and thermal power, the temperature of a working fluid at the turbine inlet depend. Thus, the optimal parameters of the thermodynamic cycle can be obtained in a wide range of operating modes of the unit with different ratios of thermal and eclectic powers. Therefore, the compressorless CCGT unit can significantly surpass the best steam turbine and combined cycle gas turbine plants in district heating system in terms of thermal efficiency.


2019 ◽  
Vol 112 ◽  
pp. 02005
Author(s):  
Oleksii Epik ◽  
Vitalii Zubenko

The article contains the first considerations of the problematic of Ukrainian grid balancing issues raised by a rapid increase of RES share in total electricity supply. The provision of balancing electricity with accent on biomass combined heat and power plants (CHP) usage is considered. Three technical concepts are proposed for engaging of existing and planned biomass CHP into balancing operation primary operating in baseload regimes, namely – greenfield biomass thermal power plant (TPP) and CHP working primary in baseload regimes and provide balancing electricity when needed (with and without steam accumulation). It is shown that there are no principle technical limitations for biomass CHP/TPP usage for grid balancing. The levelized cost of electricity (LCOE) of balancing electricity for proposed concepts are calculated and compared with the reference technology proposed by the national grid operator (gas-piston engines and/or gas turbine). According to the calculations performed the LCOE (EUR/MWh) of balancing electricity could be 77-88 EUR/MWh for biomass CHP primary operating in baseload and 216 EUR/MWh for greenfield biomass TPP against 206 EUR/MWh for gas-piston/gas-turbine for applied assumptions, prices and tariffs.


2021 ◽  
Vol 2090 (1) ◽  
pp. 012012
Author(s):  
E K Arakelyan ◽  
A V Andryushin ◽  
S V Mezin ◽  
A A Kosoy

Abstract The features of the mathematical model of multi-criteria optimization of the distribution of current thermal and electrical loads at a combined heat and power plant with a mixed composition of equipment based on traditional heating units and a heating CCGT are considered. The previously proposed mathematical apparatus for solving the problem of multi-criteria optimization at a thermal power plant is analyzed. It is shown that with a mixed composition of equipment, along with the criteria of efficiency and environmental friendliness, it is also necessary to take into account the factors of reliability and mobility (maneuverability). The substantiation of the choice of reliability and mobility criteria for optimizing the operation modes of a thermal power plant is given. Approaches to solving the multi-criteria task are considered. The description of the features of the algorithm for solving the optimization problem is given in relation to thermal power plants with a mixed composition of equipment, including heating turbines of the T type and PGU.


2012 ◽  
Vol 58 (4) ◽  
pp. 351-356
Author(s):  
Mincho B. Hadjiski ◽  
Lyubka A. Doukovska ◽  
Stefan L. Kojnov

Abstract Present paper considers nonlinear trend analysis for diagnostics and predictive maintenance. The subject is a device from Maritsa East 2 thermal power plant a mill fan. The choice of the given power plant is not occasional. This is the largest thermal power plant on the Balkan Peninsula. Mill fans are main part of the fuel preparation in the coal fired power plants. The possibility to predict eventual damages or wear out without switching off the device is significant for providing faultless and reliable work avoiding the losses caused by planned maintenance. This paper addresses the needs of the Maritsa East 2 Complex aiming to improve the ecological parameters of the electro energy production process.


Author(s):  
Ye. G. Polenok ◽  
S. A. Mun ◽  
L. A. Gordeeva ◽  
A. A. Glushkov ◽  
M. V. Kostyanko ◽  
...  

Introduction.Coal dust and coal fi ring products contain large amounts of carcinogenic chemicals (specifically benz[a]pyrene) that are different in influence on workers of coal mines and thermal power plants. Specific immune reactions to benz[a]pyrene therefore in these categories of workers can have specific features.Objective.To reveal features of antibodies specifi c to benz[a]pyrene formation in workers of coal mines and thermal power plants.Materials and methods.The study covered A and G class antibodies against benz[a]pyrene (IgA-Bp and IgG-Bp) in serum of 705 males: 213 donors of Kemerovo blood transfusion center (group 1, reference); 293 miners(group 2) and 199 thermal power plant workers (group 3). Benz[a]pyrene conjugate with bovine serum albumin as an adsorbed antigen was subjected to immune-enzyme assay.Results.IgA-Bp levels in the miners (Me = 2.7) did not differ from those in the reference group (Me = 2.9), but in the thermal power plant workers (Me = 3.7) were reliably higher than those in healthy men and in the miners (p<0.0001). Levels of IgG-Bp in the miners (Me = 5.0) appeared to be lower than those in the reference group (Me = 6.4; (p = 0.05). IgG-Bb level in the thermal power plantworkers (Me = 7.4) exceeded the parameters in the healthy donors and the miners (p<0.0001). Non-industrial factors (age and smoking) appeared tohave no influence on specific immune reactions against benz[a]pyrene in the miners and the thermal power plant workers.Conclusions.Specific immune reactions against benz[a]pyrene in the miners and the thermal power plant workers are characterized by peculiarities: the miners demonstrate lower levels of class A serum antibodies to benz[a]pyrene; the thermal power plant workers present increased serum levels of class G antibodies to benz[a]pyrene. These peculiarities result from only the occupational features, but do not depend on such factors as age, smoking and length of service at hazardous production. It is expedient to study specific immune reactions to benz[a]pyrene in workers of coal mines and thermal power plants, to evaluate individual oncologic risk and if malignancies occur.


Materials ◽  
2021 ◽  
Vol 14 (5) ◽  
pp. 1267
Author(s):  
David Längauer ◽  
Vladimír Čablík ◽  
Slavomír Hredzák ◽  
Anton Zubrik ◽  
Marek Matik ◽  
...  

Large amounts of coal combustion products (as solid products of thermal power plants) with different chemical and physical properties cause serious environmental problems. Even though coal fly ash is a coal combustion product, it has a wide range of applications (e.g., in construction, metallurgy, chemical production, reclamation etc.). One of its potential uses is in zeolitization to obtain a higher added value of the product. The aim of this paper is to produce a material with sufficient textural properties used, for example, for environmental purposes (an adsorbent) and/or storage material. In practice, the coal fly ash (No. 1 and No. 2) from Czech power plants was firstly characterized in detail (X-ray diffraction (XRD), X-ray fluorescence (XRF), scanning electron microscopy with energy dispersive X-ray analysis (SEM-EDX), particle size measurement, and textural analysis), and then it was hydrothermally treated to synthetize zeolites. Different concentrations of NaOH, LiCl, Al2O3, and aqueous glass; different temperature effects (90–120 °C); and different process lengths (6–48 h) were studied. Furthermore, most of the experiments were supplemented with a crystallization phase that was run for 16 h at 50 °C. After qualitative product analysis (SEM-EDX, XRD, and textural analytics), quantitative XRD evaluation with an internal standard was used for zeolitization process evaluation. Sodalite (SOD), phillipsite (PHI), chabazite (CHA), faujasite-Na (FAU-Na), and faujasite-Ca (FAU-Ca) were obtained as the zeolite phases. The content of these zeolite phases ranged from 2.09 to 43.79%. The best conditions for the zeolite phase formation were as follows: 4 M NaOH, 4 mL 10% LiCl, liquid/solid ratio of 30:1, silica/alumina ratio change from 2:1 to 1:1, temperature of 120 °C, process time of 24 h, and a crystallization phase for 16 h at 50 °C.


2011 ◽  
Vol 383-390 ◽  
pp. 4130-4133
Author(s):  
Song Feng Tian ◽  
Wei Wang ◽  
Yun Feng Tian ◽  
Shuang Bai Liu

There are many kinds of energy loss indicators in power plant, and there are some relevance among the various indicators. So extraction of the key indicators plays an important role between in energy loss analysis of power plants and optimal management of thermal power plants. Based on the characteristics of these indicators, the idea of rough sets was applied to the energy loss analysis of thermal power plants, then we proposed a new algorithm -- use fuzzy C means algorithm (FCM) to discrete cluster the energy loss indicators of thermal power plant, and then analysis simplified the results with algorithm Johnson. Real experiments (Chaozhou 1,2 and Ningde 3,4 assembling units which of the same type in the SIS system under the THA working condition)’ results had proved high accuracy and valuable of the algorithm.


Author(s):  
Kajori Parial ◽  
S. Mukherjee ◽  
A. R. Ghosh ◽  
D. Sengupta

Coal combustion in thermal power plants releases ash. Ash is reported to cause different adverse health hazards in humans and other organisms. Owing to the presence of radionuclides, it is also considered as a potential radiation hazard. In this study, based on the surface radiation measurements and relevant ancillary data, expected radiation risk zones were identified with regard to the human population residing near the Thermal Power Plant. With population density as the risk determining criteria, about 20% of the study area was at &lsquo;High&rsquo; risk and another 20% of the study area was at &lsquo;Low&rsquo; risk zone. The remaining 60% was under medium risk zone. Based on the findings remedial measures which may be adopted have been suggested.


Akustika ◽  
2021 ◽  
pp. 133-137
Author(s):  
Vladimir Tupov ◽  
Vitaliy Skvortsov

The power equipment of thermal power plants is a source of noise to the surrounding area. One of the sources of noise for the surrounding area are gas distribution points (GDP) of thermal power plants (TPP) and district thermal power plants (RTS). Noise from gas distribution points may exceed sanitary standards at the border of the sanitary protection zone. The article shows that the radiated noise from gas distribution points depends on the power of the thermal power plant (natural gas consumption) and the type of valves. Three types of valves used in gas distribution points are considered. Formulas are obtained for calculating the width of the sanitary protection zone for gas distribution points for thermal stations, depending on the consumption of natural gas (electric power of the thermal power plant) and the type of valve. It is shown that, depending on the valve used, the noise level at the border of the sanitary protection zone can either meet sanitary standards or exceed them. This allows at the design stage to select the required type of valve or to determine mitigation measures from hydraulic fracturing.


Author(s):  
Suchismita Satapathy

All companies are dependent on their raw material providers. The same applies in the case of thermal power plants. The major raw material for a thermal power plant is the coal. There are a lot of companies which in turn provide this coal to the thermal power plant. Some of these companies are international; some are local, whereas the others are localized. The thermal power plants look into all the aspects of the coal providing company, before settling down for a deal. Some people are specifically assigned to the task of managing the supply chain. The main motive is to optimize the whole process and achieve higher efficiency. There are a lot of things which a thermal power plant looks into before finalizing a deal, such as the price, quality of goods, etc. Thus, it is very important for the raw material providers to understand each and every aspect of the demands of the thermal power plant. A combination of three methods—Delphi, SWARA, and modified SWARA—has been applied to a list of factors, which has later been ranked according to the weight and other relevant calculations.


Sign in / Sign up

Export Citation Format

Share Document