scholarly journals Review of High Relative Humidity in Catheter Laboratory of a Private Hospital and a Low Energy Consuming Solution

2021 ◽  
Vol 3 (2) ◽  
pp. 7-13
Author(s):  
Jaya Prathab T. Arumugam ◽  
Kamran Shavarebi

The Relative Humidity in a Catheter Laboratory is desirous to be controlled within a range of 30 to 65% RH. A maximum Relative Humidity (RH) fluctuation of up to 70% is tolerated. A case study is presented whereby a high RH of up to 80% RH has been recorded in the examination room of a Catheter Laboratory (CathLab) in a local Hospital. The conditioned air to the CathLab is supplied through an existing dedicated Chilled Water Air Handling Unit. Two (2) solutions were considered and the technical and commercial comparisons carried out. The first option is an inline dehumidifier system and the second option is to install a portable standalone dehumidifier inside the CathLab examination room. Solutions to address the high Relative Humidity have to be carefully considered as the introduction of in-line dehumidifiers contribute to higher energy consumption. The latter was selected based on commercial reasons. Three (3) weeks of RH monitoring via the building’s Integrated Building Management System (IBMS) was carried out. The readings measured show a drastic reduction in RH to a mean of about 60% RH which meets the end user’s requirement. The cost for the second option was also found to be much lower at about 10% of the first option.

2021 ◽  
Vol 1 (138) ◽  
pp. 51-66
Author(s):  
Moshabab M Alhader ◽  
Mohammed S Hafez

This study examined the effect of some climatic variables and their role in growing citrus fruits in northern Saudi Arabia, which showed that low temperatures accompanied by calm winds and high relative humidity as well as creeping air masses are among the most important factors that contribute to the worsening of frost. This study also dealt with hourly frost waves - a case study - based on the study of climatic data of the study area stations for one day of frost waves that occurred in the study area for the year 2008.


2021 ◽  
Vol 321 ◽  
pp. 04018
Author(s):  
Marek Borowski ◽  
Klaudia Zwolińska ◽  
Marcin Czerwiński

Ventilation plays an important role in providing comfortable conditions for users and is also one of the most energy-consuming systems in the building. Due to successive regulations aimed at reducing the energy load of buildings towards zero-energy buildings, energy recovery systems in air handling units have become an indispensable element. The high effectiveness of the entire system guarantees a reduction in energy demand. At very low or very high external temperatures, appropriate comfort conditions are provided by additional heaters or coolers. The subject of the paper is a ventilation system in a hotel located in southern Poland. The building is a faithful reconstruction of the historical saltworks adapted for the needs of the hotel. The air handling unit equipped with a rotary exchanger supplies air to hotel rooms located on two floors. The analysis includes the effectiveness of the air-handling unit operation under various external conditions, as well as the temperature changes during heat exchange. The results show the actual operation of the air-handling unit, which is particularly important in terms of reducing the energy consumption of the hotel.


2021 ◽  
Vol 2042 (1) ◽  
pp. 012126
Author(s):  
Ghadeer Derbas ◽  
Karsten Voss

Abstract This study presents key findings of observed datasets in a nearly zero-energy office building for over 66 working days from June to mid-September in 2019, Luxembourg. Measurements of indoor and outdoor environmental parameters as well as user-shade override adjustments were extracted from the KNX-based building management system (BMS) in 47 office rooms located in three typical floor levels. Relative frequency and “rate of change” of blind use were analysed in terms of window orientation, occupancy level, and the time of the day. Logistic regression and data mining techniques were used to identify potentially useful and understandable occupant behaviour patterns and reveal the main triggers behind blind adjustments. The well-designed automation system together with the inner glare protection formed the base of very low user-shade interactions. A mean of 0.184 manual blind adjustments per day per office. Eight regression sub-models were developed and all were incapable of predicting user-shade lowering and raising events. Alternatively, two user profiles were mined based on 20 rules gained from clustering analysis: user (ß) was representing the passive user, and user (μ) the medium user. Overall, we conclude that the automated shading system in this building is satisfactory, user-friendly, and a robust control system.


2020 ◽  
Vol 4 (02) ◽  
pp. 34-45
Author(s):  
Naufal Dzikri Afifi ◽  
Ika Arum Puspita ◽  
Mohammad Deni Akbar

Shift to The Front II Komplek Sukamukti Banjaran Project is one of the projects implemented by one of the companies engaged in telecommunications. In its implementation, each project including Shift to The Front II Komplek Sukamukti Banjaran has a time limit specified in the contract. Project scheduling is an important role in predicting both the cost and time in a project. Every project should be able to complete the project before or just in the time specified in the contract. Delay in a project can be anticipated by accelerating the duration of completion by using the crashing method with the application of linear programming. Linear programming will help iteration in the calculation of crashing because if linear programming not used, iteration will be repeated. The objective function in this scheduling is to minimize the cost. This study aims to find a trade-off between the costs and the minimum time expected to complete this project. The acceleration of the duration of this study was carried out using the addition of 4 hours of overtime work, 3 hours of overtime work, 2 hours of overtime work, and 1 hour of overtime work. The normal time for this project is 35 days with a service fee of Rp. 52,335,690. From the results of the crashing analysis, the alternative chosen is to add 1 hour of overtime to 34 days with a total service cost of Rp. 52,375,492. This acceleration will affect the entire project because there are 33 different locations worked on Shift to The Front II and if all these locations can be accelerated then the duration of completion of the entire project will be effective


2016 ◽  
Vol 10 (2) ◽  
pp. 162-171
Author(s):  
Hafid Hafid ◽  
Tatang Sutisna

The design and manufacturing of the rotary table with the specification Ø 170 mm (6 inches) for CNC machine 4 axis has been done. The objective of manufacturing a rotary table is to increase the efficiency of CNC machine Hardford 4 axis to be above 80% in line machining center CV. IM’s workshop. The engineering methods was taken, consist of: working preparation, manufacturing of working drawing, engineering process, the manufacturing and testing. The prototype has been tested and operated, the resulting of increasing productivity of which were as follows: the process of assembling was increased to be 3 time ( before 1 time) and processing time for a specific case reduced from 5 hours to 3 hours, number of operators for the case of assembling the rotary reduced to 1 person (before 4 persons), safety and security become to be better. The results show increased efficiency of CNC machine Hardford, from under 50% to be above 80%. Based on the economical analysis obtained by the cost of good sold (C.G.S) of the rotary table is IDR 34.060.000. The results presented in this paper is expected to be case study for developing a business of the metal and engineering SMEs domestic to the effort of improving efficiency, quality, productivity and competitiveness in global market.ABSTRAKPerancangan dan pembuatan alat bantu meja putar (rotary table) dengan spesifikasi teknis Ø 170 mm (6 inci) untuk mesin CNC 4 axis telah dilakukan. Tujuan pembuatan rotary table adalah untuk meningkatkan efisiensi mesin CNC Hardford 4 axis di atas 80% pada line machining center Bengkel CV. IM. Metode rancang bangun yang dilakukan, meliputi: persiapan kerja, pembuatan gambar kerja, proses engineering, pembuatan dan uji coba. Prototip tersebut telah diuji coba dan dioperasikan dengan hasil peningkatan produktivitas sebagai berikut: proses pengerjaan bongkar pasang meningkat menjadi 3 kali (sebelumnya 1 kali) dan waktu pengerjaan untuk kasus tertentu berkurang dari 5 jam menjadi 3 jam, jumlah operator untuk kasus bongkar pasang rotary berkurang menjadi 1 orang (sebelumnya 4 orang), keselamatan kerja dan keamanan menjadi lebih baik. Hasil peningkatan berupa efisiensi mesin CNC Hardford 4 axis dari sebelumnya di bawah 50% menjadi di atas 80%. Berdasarkan hasil perhitungan analisis ekonomi diperoleh harga pokok produksi (HPP) alat bantu meja putar adalah sebesar Rp. 34.060.000. Bahasan ini diharapkan menjadi contoh kasus bagi pengembangan usaha IKM logam dan mesin dalam negeri untuk meningkatkan efisiensi, mutu, produktivitas dan keunggulan daya saing di pasar global.Kata kunci: alat bantu meja putar, mesin CNC, harga pokok produksi


Sign in / Sign up

Export Citation Format

Share Document