Research on the Preventive Measures of Sports Injury Based on Causality Diagram and Analytic Hierarchy Process

2013 ◽  
Vol 380-384 ◽  
pp. 1838-1842
Author(s):  
Zu Xu Zhou

Because of the frequent occurrence of injury accident in the sports curriculum, the security of physical education cannot be ignored. So, this paper analyzes the factors of injury accident in physical education teaching process and proposes prevention measures. The establishment of security system in physical education is an urgent problem. This paper studies the causes and countermeasures of sports injury accidents based on two methods: causality diagram and analytic hierarchy process. The first section introduces the principles of causality diagram and hierarchical analysis in detail. The second part of the article establishes mathematical model of the analysis method. The part three of the text investigates and analyzes the accident status and prevention measures of 100 primary schools and universities in Heilongjiang province in the form of literature researches and questionnaires. It also proposes weight coefficients and causality diagrams of Sports Injury Accidents using causal analysis theory. It converts causal diagram into a hierarchical model using the analytic hierarchy process AHP.

Author(s):  
G. Marimuthu ◽  
G. Ramesh

Decisions usually involve the getting the best solution, selecting the suitable experiments, most appropriate judgments, taking the quality results etc., using some techniques.  Every decision making can be considered as the choice from the set of alternatives based on a set of criteria.  The fuzzy analytic hierarchy process is a multi-criteria decision making and is dealing with decision making problems through pairwise comparisons mode [10].  The weight vectors from this comparison model are obtained by using extent analysis method.  This paper concern with an alternate method of finding the weight vectors from the original fuzzy AHP decision model (moderate fuzzy AHP model), that has the same rank as obtained in original fuzzy AHP and ideal fuzzy AHP decision models.


2013 ◽  
Vol 321-324 ◽  
pp. 2367-2370
Author(s):  
Xiao Nan Zhang ◽  
Si Lang Du ◽  
Jun Feng Yang ◽  
Wei Cao

It is found that the traditional BDA methods are not appropriate the system target BDA. A new method of the system target BDA is proposed in this paper. Firstly, based on Hierarchy Analysis Method (AHP), the system target function index system is set up. Secondly, the step of system target function damage assessment method is analyzed and proposed based on Fuzzy Analytic Hierarchy Process (FAHP). Finally, an example of air base damage assessment is given to verify the validity and availability of the proposed method.


2016 ◽  
Vol 2016 ◽  
pp. 1-11 ◽  
Author(s):  
Zhenshu Wang ◽  
Xiaohui Jiang ◽  
Shaorun Bian ◽  
Yangyang Ma ◽  
Bowen Fan

Establishing an accurate load model is a critical problem in power system modeling. That has significant meaning in power system digital simulation and dynamic security analysis. The synthesis load model (SLM) considers the impact of power distribution network and compensation capacitor, while randomness of power load is more precisely described by traction power system load model (TPSLM). On the basis of these two load models, a load modeling method that combines synthesis load with traction power load is proposed in this paper. This method uses analytic hierarchy process (AHP) to interact with two load models. Weight coefficients of two models can be calculated after formulating criteria and judgment matrixes and then establishing a synthesis model by weight coefficients. The effectiveness of the proposed method was examined through simulation. The results show that accurate load modeling based on AHP can effectively improve the accuracy of load model and prove the validity of this method.


2020 ◽  
Vol 1 (1) ◽  
pp. 18
Author(s):  
George Winaktu ◽  
Lalu Mulyadi ◽  
Edi Hargono DP

Sidoarjo Regency is one of the megapolitan Gerbang Kertosusilo. The planted area during the rainy season and dry season reaches 30,000 ha. The area of paddy fields continues to decline, namely 26,334 ha (2002), 22,460 ha (2010), and an estimated 13,544 ha (2009–2029). Sidoarjo Regency Irrigation Service as executor of irrigation management is of course inseparable from construction project activities. In the implementation of the construction of new irrigation networks as well as in rehabilitation and maintenance, it is necessary to implement project management. Before the project is implemented, it must first be submitted through proposals from the village level. In following up the proposal the writer used the Analytic Hierarchy Process (AHP) analysis method. With four aspects that affect the determination of the proposal: The results of the analysis obtained the weight of each criterion as follows: Service Area (ha) 0.3179, Cost 0.3159, Benefits 0.3217, and Network Conditions 0.0445. The results of the above analysis obtained priority ranking from the first to the last sequence as follows: Plengsengan Gedangrowo Channel, Normalization of Reform Channels, Installation of floodgates, Plengsengan ChannelsDs. Suwaluh, Rehabilitation of Ketawang Canal Kec. Sukodono, Rehabilitation of Candi Subdistrict Channel, Plengsengan Channel Ds. Suwaluh, Plengsengan Channels Purboyo II Ds. Popoh, Plengsengan Irrigation Channels Dsn. Kesimbuk, Plengsengan Channel Mangetan Kanal.


Author(s):  
N. F. Bogachenko ◽  
D. N. Lavrov

To determine the weight coefficients of the efficiency function of the employment service, the analytic hierarchy process and interval arithmetic were used. This made it possible to take into account the opinions of various experts without losing the consistency of the matrices of pairwise comparisons.


Sign in / Sign up

Export Citation Format

Share Document