Aerial Steel Platform Overall Lifting Process and Stress Calculation
2014 ◽
Vol 681
◽
pp. 222-228
Keyword(s):
High-rise super large aerial platform project construction has been a greater danger, How to ensure the quality of components assembled and the safety of the construction project is worthy of study. Through finite element analysis on construction conditions of steel structures, ensures the hydraulic synchronous lifting and construction technology of high-altitude hoisting and assembly, greatly reduced the difficulty of installation, quality, safety, cost, schedule is guaranteed.
2015 ◽
Vol 2015
◽
pp. 1-12
◽
Keyword(s):
2019 ◽
Vol 0
(5)
◽
pp. 37-40
2021 ◽
Vol 1137
(1)
◽
pp. 012018
Keyword(s):
1993 ◽
Vol 453
(0)
◽
pp. 65-75
Keyword(s):
2013 ◽
Vol 7
(4)
◽
pp. 76-84
2013 ◽
Vol 419
◽
pp. 203-208
1983 ◽
Vol 10
(2)
◽
pp. 287-294
◽
2014 ◽
Vol 680
◽
pp. 249-253