Determination of the Optimal Number of Suppliers Considering the Risk: Emersun Company as a Case Study

2012 ◽  
Vol 433-440 ◽  
pp. 5873-5880 ◽  
Author(s):  
Nasim Mirahmadi ◽  
Esmaeel Saberi ◽  
Ebrahim Teimoury

Determining the number of suppliers chosen for cooperation in a supply chain is one of the most important problems in the supply chain management area. Regarding the fact that simultaneously decreasing the risk and cost is one of the most important objectives of every organization, besides the cost, the risk has also been introduced in the recent researches, as one of the most important criteria. In this paper, the decision tree approach is used for determining the optimal number of suppliers considering the supply risk and it has been tried to develop an applied method through expanding the cost criteria. The proposed model in this paper, therefore, contains any kind of cost ingredients such as cost of suppliers development, cost of suppliers management, cost of missing discount in volume due to increase in number of suppliers in supply base, and loss cost due to supply postponement from suppliers. This approach is implemented in Emersun Company.

Author(s):  
Yavuz OZDEMIR ◽  
Huseyin BASLIGIL ◽  
Kemal Gokhan NALBANT

The fleet assignment problem which causes great increasing in costs is necessary for a solution of “right fleet to the right flight” for airline companies. In this paper, a fleet assignment model is set up using the data of the biggest Turkish airline company, Turkish Airlines. The aim of this model is to assign most appropriate fleet type to flights while minimizing the cost and determine optimal number of aircraft grounded overnight at each airport. We set up a model with constraints and determination of all airline operations and solve our problem using integer linear programming. Finally, we get an optimum solution which minimizes the total cost while assigning the fleet type to the flight leg. Using optimization software, the solution to this problem generates a minimum daily cost of fleet assignment and it aims to assign most appropriate fleet type to flights while minimizing the cost and determine optimal number of aircraft grounded overnight at each airport.


2018 ◽  
Vol 17 (05) ◽  
pp. 1429-1467 ◽  
Author(s):  
Mohammad Amirkhan ◽  
Hosein Didehkhani ◽  
Kaveh Khalili-Damghani ◽  
Ashkan Hafezalkotob

The issue of efficiency analysis of network and multi-stage systems, as one of the most interesting fields in data envelopment analysis (DEA), has attracted much attention in recent years. A pure serial three-stage (PSTS) process is a specific kind of network in which all the outputs of the first stage are used as the only inputs in the second stage and in addition, all the outputs of the second stage are applied as the only inputs in the third stage. In this paper, a new three-stage DEA model is developed using the concept of three-player Nash bargaining game for PSTS processes. In this model, all of the stages cooperate together to improve the overall efficiency of main decision-making unit (DMU). In contrast to the centralized DEA models, the proposed model of this study provides a unique and fair decomposition of the overall efficiency among all three stages and eliminates probable confusion of centralized models for decomposing the overall efficiency score. Some theoretical aspects of proposed model, including convexity and compactness of feasible region, are discussed. Since the proposed bargaining model is a nonlinear mathematical programming, a heuristic linearization approach is also provided. A numerical example and a real-life case study in supply chain are provided to check the efficacy and applicability of the proposed model. The results of proposed model on both numerical example and real case study are compared with those of existing centralized DEA models in the literature. The comparison reveals the efficacy and suitability of proposed model while the pitfalls of centralized DEA model are also resolved. A comprehensive sensitivity analysis is also conducted on the breakdown point associated with each stage.


2021 ◽  
Vol 1 (9) ◽  
pp. 79-84
Author(s):  
NGUYEN THI THU HUONG ◽  
◽  
O. N. LARIN ◽  
◽  

The article describes the factors associated with the planning of logistics support for the disposal of household electronic waste. Identifying these factors plays an important role in coordinating to ensure the cost-effectiveness of the costs of recycling e-waste at all stages of the supply chain from the source of waste to where it is accumulated and then recycled. The article describes the importance of such processes as: the development of a method for determining the volume of household electronic waste generated in the administrative-territorial district, the creation of a network of waste collection points, the determination of the amount and throughput of waste collection points, the need to organize garbage collection from the place of collection at the lowest cost. The study was conducted on the basis of an analysis of official statistics from the five most populous cities in Vietnam and thirty regions of Hanoi.


Information ◽  
2021 ◽  
Vol 12 (12) ◽  
pp. 496
Author(s):  
Omar Hussain ◽  
Emad Felemban ◽  
Faizan Ur Rehman

Hajj, the fifth pillar of Islam, is held annually in the month of Dhul Al-Hijjah, the twelfth month, in the Islamic calendar. Pilgrims travel to Makkah and its neighbouring areas—Mina, Muzdalifah, and Arafat. Annually, about 2.5 million pilgrims perform spatiotemporally restricted rituals in these holy places that they must execute to fulfil the pilgrimage. These restrictions make the task of transportation in Hajj a big challenge. The shuttle bus service is an essential form of transport during Hajj due to its easy availability at all stages and ability to transport large numbers. The current shuttle service suffers from operational problems; this can be deduced from the service delays and customer dissatisfaction with the service. This study provides a system to help in planning the operation of the service for one of the Hajj Establishments to improve performance by determining the optimal number of buses and cycles required for each office in the Establishment. We will also present a case study in which the proposed model was applied to the non-Arab Africa Establishment shuttle service. At the same time, we will include the mechanism for extracting the information required in the tested model from the considerably large GPS data of 20,000+ buses in Hajj 2018.


2011 ◽  
Vol 299-300 ◽  
pp. 1252-1255
Author(s):  
Hui Jin ◽  
Chun Ling Liu ◽  
Xing Yu Wang

Supplier evaluation and selection is one of the most important components of supply chain, which influence the long term commitments and performance of the plant. Supplier selection is a complex multi-criteria problem which includes both qualitative and quantitative factors. In order to select the best suppliers it is essential to make a trade off between these tangible and intangible factors some of which may conflict. In this paper, an AHP-based supplier selection model is formulated and then applied to a real case study for a polyamide fiber plant in China. The use of the proposed model indicates that it can be applied to improve and assist decision making to resolve the supplier selection problem in choosing the optimal supplier combination.


Author(s):  
Partha Chakraborty

Collaboration is defined as the actions for individuals and teams to work together for a common goal. There are several bottlenecks to an efficient and effective collaborative model of clinical trial including: the lack of a centralized, consistent, globally accessible platform to manage and store essential study related documentation; inconsistent or incomplete work assignments; inefficient notification of key events requiring follow-on action; and incomplete, missing, expired, or redundant documentation and training activities and need to maintain multiple credential to access various system, Removing these barriers is an important part of establishing an environment that fosters collaboration among all constituencies involved in managing clinical trial keeping them connected, informed, and on task by providing access to everyone at any time, from anywhere.The case study below introduces need of an integrated clinical collaboration platform, addressing key functionality of such an platform and describes the architecture & design consideration to industrialize such a platform. The intended audience of this case study is the architects & designers of similar systems. The clinical trial activity for a drug in research is approximately 70% of the overall drug development cost. It is estimated that 4% of the cost of a trial is in 'rework' involving communication, regulatory issues, patient enrollment, document review and replacement of patients. The integrated clinical collaboration platform has potential to eliminate significant amount of cost of re-work, which is in order of $3.5M per trial.


2016 ◽  
Vol 23 (6) ◽  
pp. 1398-1422 ◽  
Author(s):  
Luís Miguel D. F. Ferreira ◽  
Cristóvão Silva ◽  
Susana Garrido Azevedo

Purpose – Companies need to excel in many areas to achieve a competitive advantage. This, together with pressure imposed by regulators and customers regarding sustainability concerns, leads companies to address sustainability in an integrated fashion across all management processes. The purpose of this paper is to suggest a model for the assessment of the environmental performance of a supply chain, based on four perspectives used in the balanced scorecard. Performance indicators are proposed based on the literature, as well as on the ISO 14031 and GRI standards, and were validated by a panel of experts. Design/methodology/approach – Based on a literature review on models for environmental performance management a novel model to assess the environmental performance of the supply chains (Env_BSC_4_SCPM) is proposed. Data collected from the first tier suppliers of an automotive industry case study are used to test the proposed model. Findings – The model developed was tested in a case study company, showing it ability to benchmark the company first tiers suppliers and products. The model is also useful as a decision support tool to define actions to be taken in order to improve the global environment performance of the supply chain. Research limitations/implications – The proposed model was developed to evaluate the environmental performance of supply chains. Nevertheless, the case study only takes account of the first tier suppliers, due to difficulties associated to data collecting for the other elements in the supply chain. Widening the frontiers, the next phase may include the application of this model to second, third and lower tier suppliers, as well as the final customer. Improvements in the model could also include the construction of a composite index to measure the environmental supply chain performance. Practical implications – The paper provides a model that can be used by practitioners to evaluate the environmental performance of their supply chain and to decide on actions to be taken to improve it. Originality/value – As stated by several authors, there has been limited research conducted in the field of environmental evaluation of supply chains. This paper proposes a novel model for the environmental performance of the supply chain and tests it using industrial empirical data.


2019 ◽  
Vol 20 (1-2) ◽  
pp. 340-343
Author(s):  
Zbigniew Stempnakowski ◽  
Piotr Nikończuk

The paper presents a proposal of economic aspects application in the process of optimizing the construction of heat recovery unit. The proposed model includes the cost of heat exchanger installation and the predicted economic benefits during the operation of the device. The predicted benefits include an increase of energy efficiency resulting from the number of modules of heat recovery unit, decrease unit efficiency during operation, the cost of heat production, average temperatures in the geographical location and working time. A case study was carried out on the example of a spray booth.


2021 ◽  
Vol 9 (4) ◽  
pp. 561
Author(s):  
Meliani Indah Sari ◽  
Dyah Aring Hepiana Lestari ◽  
Wuryaningsih Dwi Sayekti

This study aims to analyze the process production of sausage noodle roll, the income and production costs, the marketing action and determine the position based on the life cycle of sausage noodle roll as well learn the role of supporting service for sausage noodle roll in CV Cucurutuku Ceria. This research method is a case study. The determination of consumer samples is taken by Convenience Sampling. Analysis of the data used in this research is descriptive qualitative and quantitative analysis. The data of this study was collected in May 2019 until June 2019. The results showed that the value R/C>1, that means sausage noodle roll business was profitable. Calculation of the cost of production on sausage rolls noodles amounted to Rp1,046.53. The BEP unit calculation has been achieved for a long time, in the amount of 42,791 units from the BEP calculation of 604 units. The noodle rolls sausage has also obtained a profit from the selling price of Rp ,000.00 per pcs from the calculation of the BEP price of Rp1,238.58 per pcs. The marketing mix that has been utilized by CV Cucurutuku Ceria is collaboration with e-commerce companies namely gofood and grabfood to facilitate consumers in the ordering process and CV Cucurutuku Ceria has utilized social media as promotional activities for sausage noodle roll product. In the product life cycle, sausage noodle roll are in a stage of decline. CV Cucurutuku Ceria has not fully utilized the government policies regarding the protection and empowerment of Micro, Small and Medium Enterprises.Keywords: cost, noodle, position, and sausage


2020 ◽  
Vol 10 (2) ◽  
pp. 97-123 ◽  
Author(s):  
Amin Mahmoudi ◽  
Mehdi Abbasi ◽  
Xiaopeng Deng ◽  
Muhammad Ikram ◽  
Salman Yeganeh

PurposeSelecting a suitable contract to outsource construction projects is an ongoing concern for project managers and organizational directors. This study aims to propose a comprehensive model to manage the risks of outsourced construction project contracts.Design/methodology/approachTo employ the proposed model, firstly, the types of contracts and risks in the organization should be identified, then, to prioritize the contracts, the identified risks are considered as criteria. After receiving the experts' opinions, the best–worst method (BWM) integrated with grey relation analysis (GRA) method was used to prioritize the contracts. BWM and GRA are multi-criteria decision-making methods with different approaches and applications. In the current study, BWM has been employed to calculate the weights of criteria because it has better performance than other methods such as the analytic hierarchy process (AHP). After calculating the weights of criteria, the GRA method has been utilized for ranking the alternatives.FindingsAccording to the results obtained from the case study, the cost plus award fee contract is the most suitable alternative for outsourcing construction projects. The proposed methodology can be practically applied through different types of the projects such as construction or “engineering, procurement and construction”.Originality/valueTo the best of our knowledge, this is the first time a conceptual model has been proposed to select an appropriate contract for construction projects. Also, for the first time, the BWM integrated with GRA method has been used to prioritize project contracts based on the potential risks. The proposed model can contribute to project managers for selecting a suitable contract with the least risk in construction projects.