Numerical Simulation on the Stress and Strain of Lining Structure with Double Shield Tunneling Construction

2012 ◽  
Vol 605-607 ◽  
pp. 2425-2429
Author(s):  
Feng Wang ◽  
Tie Jun Cui

This paper takes the Section 201 of shield construction engineering in Dalian Metro Line 2 as an example to analyze the deformation law of surrounding soil and the tunnel lining structure stress during shield tunnel construction. The shield tunnel construction is simulated dynamically by ADINA and the shield tunnel structure model of the concrete lining is established. This model is a three-dimension nonlinear finite element calculation model concerned with the grouting soil and original state soil. Taking the soil lithology in the upper layer and interact influences, we analyzed the dynamic process of shield construction, soil grouting and lining supporting and the stress distribution in difference reinforced concrete supporting segments and the ground settlement characteristics. Through numerical analysis method to study the deformation law of soil surrounding tunnel and the stress in tunnel lining, we get the results to compare with the results of Peck formula under the same condition. After generating the conclusions, we can provide several suggestions for shield tunneling construction, lining segment design and control of the ground surface settlement during the construction.

2011 ◽  
Vol 413 ◽  
pp. 289-294
Author(s):  
Li Jian Liu ◽  
Lei Yu Zhang ◽  
Jiao Xia Lan ◽  
Mei Li Wang

The field socket gas pipeline is taken to make the loading experiment in order to study the deformation and force state of the pipelines and the limit value of the deformation curvature of the pipeline.The monitoring data from the shield tunnel construction are analyzed, the effect of shield tunneling on the deformation of ground surface and buried pipelines is studied, and the rationality of the deformation monitoring value of gas pipelines in the Shenyang area is discussed.


2018 ◽  
Vol 773 ◽  
pp. 265-270
Author(s):  
Bing Sun ◽  
Wei Xu ◽  
Han Li

Numerous cases on tunnel fires emphasized the importance of fire protection of tunnel lining and indicated that fire may cause severe damages to tunnel lining in term of concrete spalling, reduction of physical-mechanical characteristics and load bearing capacity. Hybrid Fiber Reinforced Concrete (HFRC) as a new type of composite building materials has excellent physical and mechanical properties. Compared with ordinary concrete, HFRC’s tensile strength, flexural strength, abrasion resistance, impact resistance, corrosion resistance, fatigue resistance, toughness and cracking resistance, antiknock properties can be increased. Due to the problems existed in the traditional shield tunnel concrete lining segment, the research of new kind of lining segment becomes an important field of the shield tunneling research. The research of hybrid fiber reinforced concrete segment is lacking in application example in China, still in starting stage. The probability for the application of the fiber reinforced concrete segment and some other related questions are discussed in the paper, and it will promote the research and the application of new lining segment in our country.


2021 ◽  
Vol 2021 ◽  
pp. 1-14
Author(s):  
Shuancheng Gu ◽  
Guanlin Sun ◽  
Peili Su

Subway tunnels are mostly located in strata with an uneven pressure. This uneven pressure is usually manifested by lateral pressure coefficients less than 1. To adapt to the unevenness of the stratum load, in this study, we propose a new shield tunnel lining structure—outer circle and inner ellipse shield tunnel lining structure—whose outer contour remains circular and the inner contour shape of the structure is designed according to the load conditions. We used the stiffness step discounting method to obtain the calculation coefficients used in the force method formulas and established the calculation model of the outer circle and inner ellipse shield tunnel linings. The force method was then used to determine the force distribution characteristics of the outer circle and inner ellipse shield tunnel lining structure. During the verification, it was sufficient to analyze whether the waist structure rigidity met the safety conditions. This simplifies the design elements. The internal space area of our proposed design is expanded by 0.86 m2 compared to the internal space area of the equal stiffness shield tunnel lining design.


2011 ◽  
Vol 71-78 ◽  
pp. 32-36 ◽  
Author(s):  
Xin Jiang Wei ◽  
Jie Hong ◽  
Gang Wei

Considering the interaction of building-soil-tunnel, the grillage beams foundation frame building vertical crossed by Double-O-Tube (DOT) shield tunnel was simulated by 3D MIDAS/ GTS software, and the impact of construction on the building was analyzed. The results show that: the ground settlement trough caused by DOT shield tunnel can be fitted by peck formula; during the passage of the shield tunneling through the building, the settlement of the building increased and settlement trough was wilder; the settlement was stable and had a little rebound when shield machine already passed the building; with the increase of driving distance, the first principal stress P1 increased and then was stable; with the increase of L, the shape of foundation settlement curve changed, and the maximum differential settlement between columns increased but was small.


2013 ◽  
Vol 671-674 ◽  
pp. 1081-1086 ◽  
Author(s):  
Fei Fei Wang ◽  
Hui Ren Bai ◽  
Jing Jing Li

In order to study the Dalian Metro section 202(Cujin Road station-Chunguang Street station, which is shallowly buried and covered with plain fill)’s ground surface settlement, the monitoring measuring station was built during the construction. After 3 months’ measuring by precision level,the data shows that the maximum point is in the center line of the tunnel of the upper part. The settlement is about 25.66-31.82mm. This paper put forward the concept of the distance span ratio β, β effective value range was - 4 <β< 4,Surface subsidence is closely related with β, Severe surface subsidence stage is -2 <β< 2, Occupy whole deformation is 67.5-77.6%,settlement rate about 0.84-0.93mm/d, so should strengthen the monitoring frequency, Suggest increases site tour. Field test results and the ground surface settlement calculation model winkle are identical with each other; the monitoring results have important guiding significance and reference for Dalian subway and the similar shallow depth excavation tunnel construction.


2013 ◽  
Vol 734-737 ◽  
pp. 502-506
Author(s):  
Meng Lin Xu ◽  
De Shen Zhao

The shield tunneling will be bound to disturb surrounding strata, induced stress redistribution in soil, soil deformation and surface subsidence. We analyzed characteristics of soil disturbance by shield tunneling with numerical simulation. To provide technical support for the future urban shield tunnel construction. It shows practically significant in studying shield tunnel construction.


2020 ◽  
Vol 2020 ◽  
pp. 1-12
Author(s):  
Hao Ding ◽  
Xinghong Jiang ◽  
Ke Li ◽  
Hongyan Guo ◽  
Wenfeng Li

Tunnel lining crack is the most common disease and also the manifestation of other diseases, which widely exists in plain concrete lining structure. Proper evaluation and classification of engineering conditions directly relate to operation safety. Particle flow code (PFC) calculation software is applied in this study, and the simulation reliability is verified by using the laboratory axial compression test and 1 : 10 model experiment to calibrate the calculation parameters. Parameter analysis is carried out focusing on the load parameters, structural parameters, dimension, and direction which affect the crack diseases. Based on that, an evaluation index system represented by tunnel buried depth (H), crack position (P), crack length (L), crack width (W), crack depth (D), and crack direction (A) is put forward. The training data of the back propagation (BP) neural network which takes load-bearing safety and crack stability as the evaluation criteria are obtained. An expert system is introduced into the BP neural network for correction of prediction results, realizing classified dynamic optimization of complex engineering conditions. The results of this study can be used to judge the safety state of cracked lining structure and provide guidance to the prevention and control of crack diseases, which is significant to ensure the safety of tunnel operation.


2010 ◽  
Vol 168-170 ◽  
pp. 357-364
Author(s):  
Ji Feng Liu ◽  
Bo Liu ◽  
Hui Zhi Zhang

to evaluate the influence of soil-water coupled and shield tunnel construction induced around soil disturbance damage on ground surface settlement, the process of shield tunnel construction induced around soil disturbance is analyzed, the FLAC3D numerical simulation are carried out, and a newly-modified tunnelling-induced ground settlement calculation method based on disturbance degree of around soil and soil-water coupled is presented, and these methods are applied in case of Beijing Metro 10thLine. It is indicated that considering the influence of the shield tunnelling-induced around soil disturbance damage, and soil-water coupled induced soil properties weakening and the excess pore water pressure dissipating induced soil consolidation to the ground surface settlement are necessary, the calculating result of the newly-modified surface settlement prediction method, and the result FLAC3D numerical simulation all agree well with in-site observed data of Beijing Metro 10th Line.


2014 ◽  
Vol 580-583 ◽  
pp. 987-990
Author(s):  
Feng Jun Liu ◽  
Jun Fang Chen

In order to survey the time-varying effect on shield tunnel lining structure, rigidity reduce in the Homogeneous Ring Design Theory is introduced. There are three methods to evaluate the rigidity reduction caused by the aging effect. The first is the bending rigidity analysis method, which considers that the bending rigidity changes with the time-dependent stress and strain. The second is the method named the equivalent moment of inertia; the last is aging coefficient method. With the Homogeneous Ring Design Theory, the internal forces and displacement of the shield tunnel segment lining can be calculated. Based on the preliminary results, using the 1st method, the reduced rigidity and the long-time displacement at different instants of time can be calculated. It is found that the concrete shrinkage and creep effect can’t be ignored in the segment design. The survey is beneficial to monitor the deformation of tunnel lining, and the maintenance of the segments. It will make the tunnel work steadily and safely during the using period.


2014 ◽  
Vol 2014 ◽  
pp. 1-9 ◽  
Author(s):  
L. Ran ◽  
X. W. Ye ◽  
G. Ming ◽  
X. B. Dong

Shield tunneling construction of metro infrastructure will continuously disturb the soils. The ground surface will be subjected to uplift or subsidence due to the deep excavation and the extrusion and consolidation of the soils. Implementation of the simultaneous monitoring with the shield tunnel construction will provide an effective reference in controlling the shield driving, while how to design and implement a safe, economic, and effective structural monitoring system for metro infrastructure is of great importance and necessity. This paper presents the general architecture of the shield construction of metro tunnels as well as the procedure of the artificial ground freezing construction of the metro-tunnel cross-passages. The design principles for metro infrastructure monitoring of the shield tunnel intervals in the Hangzhou Metro Line 1 are introduced. The detailed monitoring items and the specified alarming indices for construction monitoring of the shield tunneling are addressed, and the measured settlement variations at different monitoring locations are also presented.


Sign in / Sign up

Export Citation Format

Share Document