As the complexity in construction projects increased, simply managing the obtained float values and critical path(s) by the CPM method usually results in more difficult schedule control and, consequently, in incorrect decision making due to non-realistic float values. This study thoroughly reviewed various float types in the literature and professional project management systems, and discussed five managerial essentials and three proactive strategies on mitigating challenging float-related problems based on the perspective of managing schedules by controlling floats. With some comments and suggestions, the outcomes of this study not only improve the knowledge level on schedule management but also provide a better understanding of float management to improve the quality of schedule management.


Author(s):  
Samiullah Sohu ◽  
Ashfaque A. Jhatial ◽  
Qadir B. Jamali ◽  
Abdul H. Buller ◽  
Imtiaz A. Bhatti

Construction projects facing cost overrun is a common problem in developing countries, including Pakistan. This research paper identifies the major cost overrun factors faced by construction projects in Pakistan and also provides recommendations to reduce the cost overrun. To main objectives of this research is to identify the critical cost overrun factors and its controlling measures. To attain objectives, the first in-depth literature review was conducted, which helped to identify 33 common cost overrun factors. Secondly, a structured questionnaire was established among stakeholders of the construction sector to share feedback about the critical cost overrun factors. Results showed that stakeholders of construction projects (consultant, contractor, and client) have a different perception of cost overrun. After identification of major cost overrun factors, interviews were carried among mostly experienced stakeholders for mitigation and control measures. This research delivers a better understanding of major cost overrun factors. Also, it provides recommendations to stakeholders of construction projects as well as other professionals of Pakistan to control cost overrun.


2021 ◽  
Vol 2021 ◽  
pp. 1-9
Author(s):  
Zhou Lu

The increasing complexity and enormity of construction projects, as well as the fact that the actual operation of construction schedule management still mainly relies on traditional manual management methods, have led to low efficiency of construction schedule management and caused many construction projects to have cost overruns and legal disputes due to schedule delays. Existing 3D reconstruction algorithms often lead to significant voids, distortions, or blurred parts in the reconstructed 3D models, while the machine learning-based 3D reconstruction algorithms are often only to reconstruct simple separated objects and represent them as 3D boxes. A novel architecture of semisupervised 3D reconstruction algorithm is proposed. The algorithm iteratively improves the quality of the original 3D reconstruction model by training a generative adversarial network model to a converged state. Only the prior observed 2D images are required as weakly supervised samples, without any dependence on prior knowledge of the 3D structure shape or reference observations. Experimental results show that this algorithmic framework has significant advantages over the current state-of-the-art 3D reconstruction methods on the standard 3D reconstruction test set.


Author(s):  
Y. Arockia Suganthi ◽  
Chitra K. ◽  
J. Magelin Mary

Dengue fever is a painful mosquito-borne infection caused by different types of virus in various localities of the world. There is no particular medicine or vaccine to treat person suffering from dengue fever. Dengue viruses are transmitted by the bite of female Aedes (Ae) mosquitoes. Dengue fever viruses are mainly transmitted by Aedes which can be active in tropical or subtropical climates. Aedes Aegypti is the key step to avoid infection transmission to save millions of people in all over the world. This paper provides a standard guideline in the planning of dengue prevention and control measures. At the same time gives the priorities including clinical management and hospitalized dengue patients have to address essentially.


2020 ◽  
Vol 38 (7A) ◽  
pp. 1069-1076
Author(s):  
Layth T. Ali ◽  
Raid S. Abid Ali ◽  
Zeyad S. M. Khaled

Cost overrun in construction projects is a common phenomenon in Iraq. This might occur due to diversity of factors. This study aims to identify the factors influencing construction projects cost that are potentially controllable by main contractors. A field study through a questionnaire survey was directed to a sample of related Iraqi professional engineers from general contracting companies at both public and private sectors. Their opinions on the impact and frequency of each factor were investigated. The questionnaire offered (59) factors classified in (8) categories namely; legislations, financial and economic, design, contractual, site management, material, labor and equipment. The factors were ranked according to the highest Relative Importance Index (RII). The study revealed (10) major factors that are potentially controllable by main contractors namely; labor productivity, sub-contractors and suppliers performance, equipment productivity, site organization and distribution of equipment, experience and training of project managers, scheduling and control techniques, planning for materials supply, planning for equipment supply, materials delivery and planning for skilled labor recruitment. Recommendations to aid contractors and owners in early identification of these factors are also included in this study.


1986 ◽  
Vol 18 (9) ◽  
pp. 197-205
Author(s):  
Lj Jeftié ◽  
L. J. Saliba

Increasing concern over the deterioration of the Mediterranean sea as a result of increasing pollution by untreated sewage and industrial wastes, agricultural pesticides and fertilizers and oil discharges, led to a series of meetings between 1970 and 1974, and finally to the UNEP-sponsored Mediterranean Action Plan, adopted by governments of the region in 1975 and ongoing since that time. The legal component of the Plan includes a framework Convention and four protocols; the environmental assessment component (the MED POL programme) consists of national pollution monitoring programmes, and research projects conducted by Mediterranean institutions; the environmental management component consists of the Blue Plan (a prospective study combining socio-economic development with environmental preservation) and the Priority Actions Programme (a series of sub-region sectoral projects in defined areas). The Plan has been financed by Mediterranean States since 1979, and is managed by UNEP with the cooperation of other competent UN Agencies. During the last ten years, activities undertaken have improved knowledge of the state of pollution of the Mediterranean sea, and facilitated joint regional action in the form of preventive and control measures.


2020 ◽  
Author(s):  
Qiangsheng Huang

BACKGROUND As of the end of February 2020, 2019-nCoV is currently well controlled in China. However, the virus is now spreading globally. OBJECTIVE This study aimed to evaluate the effectiveness of outbreak prevention and control measures in a region. METHODS A model is built for find the best fit for two sets of data (the number of daily new diagnosed, and the risk value of incoming immigration population). The parameters (offset and time window) in the model can be used as the evaluation of effectiveness of outbreak prevention and control. RESULTS Through study, it is found that the parameter offset and time window in the model can accurately reflect the prevention effectiveness. Some related data and public news confirm this result. And this method has advantages over the method using R0 in two aspects. CONCLUSIONS If the epidemic situation is well controlled, the virus is not terrible. Now the daily new diagnosed patients in most regions of China is quickly reduced to zero or close to zero. Chinese can do a good job in the face of huge epidemic pressure. Therefore, if other countries can do well in prevention and control, the epidemic in those places can also pass quickly.


2020 ◽  
Author(s):  
Yushi Mo ◽  
Yan Luo ◽  
Hong Li ◽  
Dewei Xiao ◽  
Shuqing Liu ◽  
...  

BACKGROUND In face of the sudden epidemic of COVID-19, strict prevention and control measures had been urgently carried out all over China. Because of the long-term home quarantine, all kinds of people were affected by it. OBJECTIVE In order to understand the mental health of children during the pandemic of COVID-19, this study investigated the prevalence and characteristics of emotional and behavioral problems of children aged 1-11 in Guizhou. METHODS Based on the online survey platform, the survey link was pushed through Wechat in April 2020. Electronic questionnaires were used to investigate children's demographic characteristics, emotional or behavioral problems. RESULTS A total of 3505 valid questionnaires were received from 9 prefectures and cities in Guizhou Province. 39.67% of the children in the 1-2-year-old group had emotional problems. 17.63% of the children agd 3-5 years had behavioral or emotional problems. And 23.57% of the children agd 6-11 years havd behavioral problems. CONCLUSIONS During the home quarantine period of prevention and control of COVID-19, even young children were adversely affected. The prevalence of emotional and behavioral problems in children was high, which was mainly manifested as anxiety, difficulty in concentration and sleep problems.