Discussion on Guaranteeing the Construction Quality of Concrete Engineering in the Construction Process of Gas Station

2021 ◽  
2021 ◽  
Vol 5 (2) ◽  
Author(s):  
Yisong Yin ◽  
Xiaolong Ruan

If the indoor drainage pipe is blocked and the drainage is not smooth, sewage and pollutants will enter the room and endanger human health. If the pipeline is blocked as a result, a certain intensity of water pressure may be brought, which may cause pipeline leakage. In this article, we will analyze and explain the quality problems that often occur during the construction process due to the blockage of the internal drainage pipe, and propose appropriate methods and solutions to improve the quality of the project.


2012 ◽  
Vol 226-228 ◽  
pp. 1386-1389
Author(s):  
Wen Tao Rong

Construction quality is one of the main reasons which lead to the failure of cement deep mixing pile. In order to ensure the construction quality of cement deep mixing pile and control its construction process, the influence of four construction parameters such as slurry conveying capacity, drilling and hoisting speed, agitation shaft rotation speed and remixing times on pile quality are analyzed. At last key reasons to ensure the construction quality of cement deep mixing pile are pointed out. Pile quality and construction efficiency should be considered when construction parameters being optimized. The research results provide reference for construction of cement deep mixing piles in the future.


2021 ◽  
Vol 276 ◽  
pp. 02021
Author(s):  
Xiang Gao

With the continuous development of the construction engineering industry, geotechnical engineering construction has attracted more and more attention from the society. In the construction process of geotechnical engineering, scientific and reasonable engineering investigation is the key to ensuring construction quality and improving engineering safety. Based on this, this article analyzes the application of measurement technology in the process of geotechnical engineering investigation. It is hoped that through this analysis, the application effect of measurement technology in geotechnical engineering survey can be effectively improved, and the quality of geotechnical engineering survey can be improved, so as to promote the overall construction quality and safety of geotechnical engineering.


Author(s):  
Xiong Zhou

With the increase in the number and scale of tunnel projects in China in recent years, the comprehensive management for quality inspection and monitoring measurement in the tunnel construction process is receiving more and more attention. Based on this, this paper analyzes the comprehensive management of quality inspection and monitoring during tunnel construction to ensure the quality of tunnel construction.


2014 ◽  
Vol 1056 ◽  
pp. 142-145
Author(s):  
Lei Liu

The civil engineering construction is a very complicated production activities. In the whole construction process need to consume a large amount of manpower, consume a large amount of materials, use a lot of equipment, also need to deal with complex technical problems a lot. So this is for the civil engineering construction project management have strict requirements. This paper from the quality control, schedule control, cost control three aspects of the civil engineering construction project management analysis. Quality control Construction quality is the foundation of project management work, is the basic requirement of the construction of the project. Have important influence on the quality of the whole construction quality of engineering quality control. Because the civil engineering construction comprises a plurality of procedures, quality control is usually divided in time for the preparation of construction quality control, the quality control of construction process and quality control of completion and acceptance of three stages. Preparation of construction quality control of the main content is: each enterprise carefully check to participate in the project entity construction qualification, including professional subcontracting subcontracting, materialsand material suppliers; according to the basic principles of quality management, review project quality plan, quality requirements, implementationplan, including examination, treatment and other sectors to establish quality control preliminary scheme;, once appear quality problem, can quickly take thepreliminary scheme, guarantee the quality of the whole project. Figure 1 Quality process control before, during and after the event.


2021 ◽  
Vol 2021 ◽  
pp. 1-14
Author(s):  
Qihao Yu ◽  
Xiu-Ling Ren ◽  
Pan Yue ◽  
Gui-Ke Zhang ◽  
Jun-Feng Wang ◽  
...  

Winter construction in seasonally frozen soil areas is inevitable. The variation of ambient temperature causes the freeze-thaw of the filling soils and its impact is significant, and whether the countermeasures can be effectively established and adopted is particularly important for the management and control of the construction quality of the project. This paper conducts systematic research based on the winter construction process of the dam core wall of the Lianghekou Hydropower Station, which is the third highest earth-core rockfill dam in the world under construction. The results show that for the construction site in the seasonally frozen soil area, there is a development process of the short-term frozen soils for the filling soils under the environment with low temperature in winter. The soil underwent a high-frequency freeze-thaw process wherein it was frozen at night and completely thawed during the day. During the freezing process, a large number of thin-layered segregated ice developed inside the soil to form a thin-layered or integral cryostructure, which will have an adverse effect on the engineering properties and the quality of the filling soils. And, the field tests demonstrate that the filling compaction degree of the frozen soils is difficult to meet the designed requirements. In order to effectively cope with the adverse effect of the freeze-thaw on the construction quality during the construction process, based on the analysis of the freeze-thaw characteristics of soils and its influence, and the energy exchange process of soils on-site, the principles and methods for establishing the freeze prevention system during the winter construction process are established, and a comprehensive monitoring system suitable for on-site is established in this paper. This research will provide an important reference for the scientific management and efficiency improvement of the winter construction process of the dams in cold regions.


2019 ◽  
Vol 2 (5) ◽  
Author(s):  
Tong Wang

The compaction quality of the subgrade is directly related to the service life of the road. Effective control of the subgrade construction process is the key to ensuring the compaction quality of the subgrade. Therefore, real-time, comprehensive, rapid and accurate prediction of construction compaction quality through informatization detection method is an important guarantee for speeding up construction progress and ensuring subgrade compaction quality. Based on the function of the system, this paper puts forward the principle of system development and the development mode used in system development, and displays the development system in real-time to achieve the whole process control of subgrade construction quality.


2015 ◽  
Author(s):  
W. David Joiner ◽  
Charles J. Cook

Propulsion shaft alignment is a necessary and crucial step in the ship construction process, with manning and schedule constraints requiring accurate results as efficiently as possible. There are two methods for measuring the bearing loading along the shaft line: strain gages and load cells. The legacy method for using strain gages required a lot of man power and the legacy method for using load cells was dependent on the quality of machinist made available. Strain gages are the transducers of choice for measurement; however the data acquisition, especially for ships with long shafting systems, can require many strain gage positions and personnel to conduct tests. Load cells are used to validate the accuracy of the strain gage method and to calculate the shaft runout at each bearing location.


2011 ◽  
Vol 374-377 ◽  
pp. 1904-1907
Author(s):  
Yu Hua Li ◽  
Hai Xiang Li ◽  
Yu Xing Liu ◽  
Jing Yun Chen

Chip seal is most frequently used as preventive maintenance (PM) treatments on asphalt pavement. However, it’s difficult to make the performance test of chip seal in laboratory. In this paper, the specimen molding method of chip seal is established in laboratory. Firstly, considering the structure and technique condition of the original pavement, a cushion layer of asphalt concrete (AC) is used as under layer of the specimen. Secondly, the construction process of chip seal is simulated in laboratory, which includes spraying emulsified asphalt and/or glass fiber, spreading aggregate, initial rolling and conservation, post-stage rolling and conservation in interval for some time. Lastly, visual inspection and sand patch test are used to evaluate the quality of the specimen. Research results show that the method of specimen molding and test in laboratory could relatively accurately simulate, evaluate and forecast the performance of the chip seal.


Sign in / Sign up

Export Citation Format

Share Document