scholarly journals The impact of a project organisational culture and team rewarding on project performance

2012 ◽  
Vol 17 (1) ◽  
pp. 40-67 ◽  
Author(s):  
Aljaž Stare
2021 ◽  
Vol 13 (13) ◽  
pp. 7380
Author(s):  
Hong Liu ◽  
Zhihua Liu ◽  
Yongzeng Lai ◽  
Lin Li

This study conducted a comprehensive and systematic investigation of the influencing factors for collaborative innovation project (CIP) performance. First, a theoretical framework model was constructed, and then a structural equation model (SEM) was used for an empirical analysis of 199 CIPs. Furthermore, we divided the factors into tangible and intangible categories and considered the impact mechanism of nine typical factors on project performance. The results are as follows: (1) All nine factors had a significant positive impact on the performance of collaborative innovation projects, among which benefit distribution and collaborative innovation capability were the most important. (2) Benefit distribution, resource dependence, organizational climate, and collaborative innovation affected project performance, both directly and indirectly. (3) Effective communication, leadership support, knowledge sharing, and collaborative innovation ability only had a direct influence, while the incentive mechanism played only an indirect role. Finally, three suggestions were put forward on the idea of high-quality, sustainable development.


2021 ◽  
Vol 21 (1) ◽  
Author(s):  
Elizabeth Sutton ◽  
Julian Bion ◽  
Russell Mannion ◽  
Janet Willars ◽  
Elizabeth Shaw ◽  
...  

Abstract Background National standards are commonly used as an improvement strategy in healthcare, but organisations may respond in diverse and sometimes negative ways to external quality demands. This paper describes how a sample of NHS hospital trusts in England responded to the introduction of national standards for 7-day services (7DS), from an organisational behaviour perspective. Methods We conducted 43 semi-structured interviews with executive/director level and clinical staff, in eight NHS trusts that varied in size, location, and levels of specialist staffing at weekends. We explored approaches to implementing standards locally, and the impact of organisational culture and local context on organisational response. Results Senior staff in the majority of trusts described a focus on hitting targets and achieving compliance with the standards. Compliance-based responses were associated with a hierarchical organisational culture and focus on external performance. In a minority of trusts senior staff described mobilising commitment-based strategies. In these trusts senior staff reframed the external standards in terms of organisational values, and used co-operative strategies for achieving change. Trusts that took a commitment-based approach tended to be described as having a developmental organisational culture and a history of higher performance across the board. Audit data on 7DS showed improvement against standards for most trusts, but commitment-focused trusts were less likely to demonstrate improvements on the 7DS audit. The ability of trusts to respond to external standards was limited when they were under pressure due to a history of overall poor performance or resource limitations. Conclusions National standards and audit for service-level improvement generate different types of response in different local settings. Approaches to driving improvement nationally need to be accompanied by resources and tailored support for improvement, taking into account local context and organisational culture.


2018 ◽  
Vol 24 (01) ◽  
pp. 2050001
Author(s):  
ROLAND HELM ◽  
MARTIN KLOYER ◽  
CHRISTIN AUST

Manufacturing firms that collaborate with external R&D partners are inevitably confronted with the danger of R&D suppliers deliberately with holding knowledge. Empirical analyses on a set of 104 supplier firms provide results concerning the impact of “soft” determinants of knowledge sharing that have not been investigated to date. In particular, they show that intrinsic motivation and organisational culture are more important than better examined “hard” determinants such as behaviour monitoring and the collaboration perspective. Additionally, we detect a theoretically surprising effect of knowledge sharing on the supplier firm’s success.


Innovar ◽  
2015 ◽  
Vol 25 (56) ◽  
pp. 53-67 ◽  
Author(s):  
Maricela I. Montes-Guerra ◽  
Aida R. De-Miguel ◽  
M. Amaya Pérez-Ezcurdia ◽  
Faustino N. Gimena ◽  
H. Mauricio Díez-Silva

This article analyzes the adoption of project management practices in development cooperation NGOs and their influence on project performance. This paper illustrates the impact in the implementation of methodologies, techniques and tools on outcomes, measured by success criteria of several projects recently implemented. Information from the project managers of the organizations was collected, and complemented by a literature review. We analyzed the correlation among the variables that determine the adoption of a project, and the criteria that determine its success. The positive effect of project management adoption in the performance of cooperation projects is demonstrated, in spite of the low use of methodologies, techniques and tools within the sector. The article shows the importance of project management in cooperation and aid projects, with the purpose of increasing researchers' awareness about the field as applicable knowledge and about the benefits of its use in the sector. The paper shows that project management can improve project efficiency and accountability in other sectors.


2019 ◽  
Vol 3 (1) ◽  
pp. 2-28 ◽  
Author(s):  
Garrett Lane Cohee ◽  
Jeff Barrows ◽  
Rob Handfield

Purpose Each year, the US defense industry outsources nearly $400 bn of domestic goods and services through competitive bids. These procurement activities are quite often complex and specialized in nature because of a highly regulated federal acquisition contracting environment. Ongoing calls to improve supplier management and drive innovation in the defense industry offers an opportunity to adopt Early Supplier Integration (ESI) initiatives that have proven successful in the private sector. This paper identifies critical ESI activities and acquisition practices that the defense industry should adopt to ensure enhanced effectiveness in new product development. Design/methodology/approach Leveraging a conceptual ESI model derived from the research, an in-depth case study of 12 product development projects from a major defense contractor was performed. In the context of project performance, critical ESI activities and moderating effects were assessed. Findings Three key ESI activities have the greatest impact on aggregate project performance: system design involvement, design adjustment opportunities and design for manufacturability/assembly/testability involvement. Use of formal supplier agreements also significantly impacts project performance during the development phase. In addition, project complexity and product team maturity were identified as environment moderators; higher complexity projects tended to negatively moderate the impact of ESI upon performance, and higher team maturity levels tended to positively moderate the impact of ESI upon performance. Originality/value The results provide a sound framework for empirical validation through future quantitative studies and defense industry analyses. In addition, insights and recommendations for interpretation and adaptation of federal acquisition regulations to allow increased utilization of ESI within the defense industry are substantiated.


Author(s):  
Chi Maher

This chapter explores the influence of organisational culture on managerial internal career needs in small third sector social enterprises. Every organisation develops and maintains a unique culture, which provides guidelines and boundaries for the career management of members of the organisation. The research methodology was designed to allow the collection of data from three case study organisations and 24 operational managers working in these organisations. The qualitative findings of the study add to, and help to explain the inter-play between individual manager's internal career needs and organisational culture. Most importantly the findings suggest that when individual manager's internal career needs are closely supported by organisational culture, it increases their desire to stay with the organisation. The findings make an important contribution in the field of organisational career management.


2019 ◽  
Vol 5 (1) ◽  
pp. 13-19
Author(s):  
Fitri Nur Kharina ◽  
Kusno Adi Sambowo

Construction projects in all regions continues to be developed for the creation of facilities that can be utilized by the community. One of them is the construction of apartments which are now being intensively carried out to meet residential needs for the community. Making a construction project plan always refers to estimates that exist at the time development plan is made, therefore problems can arise if there is a discrepancy between the plans that have been made and the actual reality. So the impact that often occurs is the delay in the time of project implementation which can also be accompanied by an increase in the cost of implementing the project. In the construction project of Cinere Terrace Suites Apartemen & Citywalk, Jakarta there was a delay resulting in a late payment of monthly bill progress by the owner. Based on the above reasons, this research was conducted to find out how the project performance was seen from the cost and time period of the review period. how is the estimated cost and time to complete the overall project work. The method used in the analysis of this study is the Earned Value Method. Based on the results of the analysis carried out for 29 weeks the project performance on schedule has been delayed and cost shows a positive value. For the estimated completion time of the project there is an increase in time whose duration increases from the planned 98 weeks or 685 days to 109,624 weeks or 768 days. While the estimated cost of completing the project from the results of the analysis obtained a value of Rp. 270,147,448,569.16 smaller than the planned cost of Rp. 315,272,727,272.73. With the difference VAC of Rp. 45,125,278,703.57 this shows that there are benefits obtained by the contractor.


Sign in / Sign up

Export Citation Format

Share Document