scholarly journals VALUE FOR MONEY IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS IN THE FIELD OF STREET LIGHTING IN THE REPUBLIC OF SERBIA

2020 ◽  
Vol 20 (2) ◽  
Author(s):  
Dejan Milenković ◽  
Vladimir Đurić

Public administration reform, better known as the New Public Management - NPM, which began in the mid-1970s, had a key impact on the development of modern public administration. The NPM emphasizes the economic values of public administration, to the detriment of its other values. Public Private Partnership- PPP is one of the basic elements of NPM doctrine. PPP is a partnership between the public and private sector that aims to provide a service traditionally provided by the public sector. An integral part of every PPP is the Value for Money methodology. The “Value for money”- VfM method emerged in this process of public administration reform, first in the UK. The document of the British Government Private Finance Initiative (PFI) from the year 1992, presented the basis for the creation of a new so-called “Venture”, which at that time was called a joint venture, and which is today known as PPP. PPP is a relatively new institute that has existed in the Republic of Serbia since 2011. In this paper, we will deal with the application of the VfM methodology in PPP projects related to street lighting in the Republic of Serbia, and try to give answer about social and economic justification of PPP and potential economic savings that can be achieved in the public sector through the implementation of PPP. At the present time, when there is more and more talk about the need for environmental protection, sustainable development and energy efficiency, PPP projects can have an increasing importance in this area. For this reason, we have limited the application of VfM methods in PPP projects in the Republic of Serbia only to street lighting projects which provide the mentioned goals.

2019 ◽  
pp. 145-155
Author(s):  
Nykola Lakhyzha ◽  
Svitlana Yehorycheva

The experience of the institutional support of public-private partnership in the Republic of Poland has been analyzed. It is noted that Poland was one of the first among the post-communist countries to implement a mechanism of public-private partnership. The peculiarities of the practice of realization of public-private partnership in Poland during the 1990s and its legal support were determined. The possibility of its development on the basis of general norms of civil, economic, administrative and other branches of law is emphasized. The process of development and adoption of separate laws on public-private partnership and their specific features are described. The essence of discussions about the need for creation of a special authorized body for regulation of public-private partnership, which was caused by the problems that arose from public and private partners during the conclusion and implementation of the relevant agreements, was disclosed. The modern components of organizational support for supporting the development of public-private partnership in Poland, their role and their inherent functions are revealed: the Department for Public-Private Partnerships of the Ministry of Investment and Development, similar departments in public administration bodies of different levels, the Public-Private Partnership Platform, Polish Entrepreneurship Development Agency, Institute of Public Private Partnership, private law firms, scientific and educational institutions. The necessity to improve the institutional support of public-private partnership, which is realized by the government of Poland as well, is stated. The content and significance of the latest program documents in this area that are intended to improve the process of administration the development of public-private partnership — the concept «The vision of sustainable development for Polish business 2050» and «Government policy in the field of development of public-private partnership» are characterized. The importance of using the experience of the Republic of Poland in the practice of public administration of the Ukrainian system of public-private partnership is emphasized.


2018 ◽  
Vol 28 (6) ◽  
pp. 1919-1923
Author(s):  
Tatijana Ashtalkoska-Baloska ◽  
Aleksandra Srbinovska-Doncevsk

A number of abuses of power and position, daily committed for acquisition of unlawful profit, beyond of permitted and envisaged legal jobs, starting from the lowest level, to the so-called, daily corruption, which most often is related to existential needs and it acts harmless, not even grow into another form, to one that uses such profits as the main motive for generating huge illegal gains for a longer period of time, by exploiting and abusing high social position, corruption in public sector, but today already in private sector too, are part of corruption in the broadest sense, embracing all its forms, those who do not enter in zone of punishment and those who means committing of serious crime. It has many forms, but due to focusing on a particular problem, as a better way to contribute a solution, this paper will focus on the analysis of corruption in the public administration in the Republic of Macedonia, and finding measures for its prevention and reduction, which we hope will give a modest contribution to its real legal protection, not only in declarative efforts in some new strategy for its prevention and suppression.


2020 ◽  
Vol 31 (3) ◽  
pp. 263-285
Author(s):  
Claudia Petrescu ◽  
Flavis Mihalache

Public services represent an important dimension of quality of society, as they create the contextual conditions for people to further their quality of life. Romanian public administration reform has brought about a constant institutional transformation, which has influenced both the specific features and the quality of the services. This article aims to analyse trends regarding the perceived quality of public services in Romania, in European comparative perspective, using the data of the European Quality of Life Survey (2003–2016). The article aims to understand the low satisfaction with public services in Romania against the background of the public service reform measures taken by government in this period. The article describes the context of Romanian public administration and public service reform, the most important public policy measures adopted and the most important challenges. The lack of vision in the public service reform, the partial introduction of reform elements, the permanent and, sometimes, conflicting changes are issues that may have influenced the way in which the population perceives the quality of public services. The decentralisation process of public services and the insufficient allocation of public funds for delivering such services at local level might have an impact on their quality and quantity perceived by the population. Keywords: public services; public administration reform; citizens’ satisfaction; New Public Management; New Weberianism.


2018 ◽  
Vol 32 (1) ◽  
pp. 255-279 ◽  
Author(s):  
Ileana Steccolini

Purpose The purpose of this paper is to reflect various pathways for public sector accounting and accountability research in a post-new public management (NPM) context. Design/methodology/approach The paper first discusses the relationship between NPM and public sector accounting research. It then explores the possible stimuli that inter-disciplinary accounting scholars may derive from recent public administration studies, public policy and societal trends, highlighting possible ways to extend public sector accounting research and strengthen dialogue with other disciplines. Findings NPM may have represented a golden age, but also a “golden cage,” for the development of public sector accounting research. The paper reflects possible ways out of this golden cage, discussing future avenues for public sector accounting research. In doing so, it highlights the opportunities offered by re-considering the “public” side of accounting research and shifting the attention from the public sector, seen as a context for public sector accounting research, to publicness, as a concept central to such research. Originality/value The paper calls for stronger engagement with contemporary developments in public administration and policy. This could be achieved by looking at how public sector accounting accounts for, but also impacts on, issues of wider societal relevance, such as co-production and hybridization of public services, austerity, crises and wicked problems, the creation and maintenance of public value and democratic participation.


2015 ◽  
Vol 4 (4) ◽  
pp. 23
Author(s):  
Wael Omran Aly

Abstract:After the Second World War, the newly emerged independent third world countries faced immense problems such as poverty, illiteracy, poor health, low agriculture and industrial productivity and social instability. The idea of development administration was born with the above-stated pragmatic concern. Since then, third world countries strived to adopt development administration principles and techniques; in order to transform their conventional traditional public administration into modern development administration that can lead the prospective development.Such conventional public administration deals with regulatory aspects of administration such as law and order, judicial administration and revenue collection, development administration is concerned with the socio-economic developmental activities. Thus, traditional public administration is structure-oriented while developmental administration is action- oriented. Many third world countries failed in realizing such desired shift by converting its conventional public administration to effective development administration; able to achieve the intended national development via the formulation and the implementation of plans, policies, programs and projects necessary for sustainable development purposes. Such bad governance had led the people to go up against such government; as it happens lately in some Arab countries like Egypt and Tunisia.Therefore, the public sector in Egypt need to be deregulated, a new results-based management is a must; to hold managers accountable. This is a fundamental change: holding managers accountable for what they do, not how they do it. The public sector reform initiatives (especially the New Public management –NPM) have resulted in changing the accountability concept; from accountability in terms of procedural compliance to accountability in terms of efficiency and results (effectiveness and cost effectiveness).  


2006 ◽  
Vol 53 (3) ◽  
pp. 299-311 ◽  
Author(s):  
Viktorija Bojovic

This paper discusses recent changes in the way public services are delivered A marked increase in the cooperation between the public and private sector in the realization of complex projects, mostly concerning development of infrastructure, is the main characteristic of present-day developing economies. The creation of new, innovative agreements is driven by the limitation of public funds and an ever-growing demand for an increase in the quality of public services. Looking upon the western economies experience alternatives to the traditional public sector procurement are identified in the public/private partnership. The public/private partnership can be seen as one component in the rearrangement of the public sector with a management culture that focuses on the citizen or customer. Also included in this are accountability for results, investigation of a wide variety of alternative service delivery mechanisms, and competition between public and private bodies for contracts to deliver services consistent with cost recovery and the achievement of value for money. The partnership can be realized through an array of models and in this paper priority is given to the DBFO (design-build-finance-operate) model, due to its importance in implementation. The DBFO model is considered to be a synonym for the public/private partnership, as it is the most suitable for complex projects and gains the most benefits.


2021 ◽  
Vol 2 (4) ◽  
pp. 263-273
Author(s):  
Siti Arifah ◽  
Agung Nur Probohudono ◽  
Djuminah ◽  
Evi Gantyowati

This study aims to see how the condition of the object/Tourist Attraction (TA) in Magelang Regency in Indonesia and its alternative development. This research uses a descriptive qualitative approach with case studies of 31 tourism objects which will then be investigated regarding their conditions and possible future developments. Research data were obtained by direct observation of the location of tourist objects and through semi-structured interviews. The results of this study illustrate that tourism objects in Magelang Regency are currently quite developed. However, this has not been able to attract general tourists to linger in the regency and provided an optimal contribution to regional income. This is because tourism objects in the regency other than Borobudur Temple have not been maximized for their existence and utilization. The Public-Private Partnership (PPP) scheme model can be an alternative to be applied in developing tourism objects accompanied by an appropriate Value for Money (VfM) analysis. Tourism objects in the form of cultural heritage can be developed through concession contracts, natural beauty can be developed through management contracts, and artificial objects can be developed through service contracts while taking into account the development needs of each tourism object. Local governments need to establish cooperation with the private sector with a Public-Private Partnership scheme accompanied by the preparation of strict regulations so that the implementation of cooperation in the context of developing tourism objects in the Magelang Regency can bring optimal benefits to all parties.


2018 ◽  
Vol 23 (2) ◽  
pp. 221-238 ◽  
Author(s):  
Robert Osei-Kyei ◽  
Albert P.C. Chan ◽  
Ayirebi Dansoh ◽  
Joseph Kwame Ofori-Kuragu ◽  
Emmanuel Kingsford Owusu

Purpose The purpose of this study is to explore the motivations of governments for adopting unsolicited proposals for public–private partnership (PPP) project implementation. Design/methodology/approach A comprehensive review of literature was conducted to derive a list of motivations for adopting unsolicited PPPs. Subsequently, an empirical questionnaire survey was conducted with international PPP experts. Inter-rater agreement analysis, mean significance index and independent two-sample t-test were used for data analysis. Findings Results reveal four very critical motivations for governments’ interest in unsolicited PPPs; these include: “enhanced private sector innovation and creativity in PPPs”; “lack of public sector capacity to identify, prioritise and procure projects”; “lack of private investors’/developers’ interest in projects at remote areas”; and “rapid implementation of PPP projects”. Further analysis shows that developing and developed countries view the significance of three motivations differently. Research limitations/implications The major limitation lies in the fact that this study only focused on the general motivations/rationale for using unsolicited PPP proposals and did not thoroughly examine and consider the inherent property of motivations (i.e. push and pull theories). Therefore, future studies should explore the “pull and push” motivations for adopting unsolicited PPPs within a specific country or region. Originality/value The research outputs inform international private developers of the key expectations of governments/public departments when submitting unsolicited PPP proposals for consideration by the public sector. Furthermore, the outputs will enable governments/public departments and private proponents to derive performance objectives and standards for unsolicited PPP projects.


2017 ◽  
Vol 48 (4) ◽  
pp. 93-106 ◽  
Author(s):  
Khalid Almarri ◽  
Halim Boussabaine

Governments are increasingly entering partnerships with the private sector through the public–private partnership (PPP) model for the development of public projects. Value for money analysis is used to assess the viability of these ventures. This research aims to investigate the contribution of the PPP critical success factors to value for money viability analysis. Relevant data were collected through a questionnaire to establish the PPP critical success factors and value for money success criteria. Data were collected from 92 participants. The data obtained were analyzed using mean score, t-test, and regression analysis. The research found that government guarantees, macroeconomic conditions, shared authority between the public and private sectors, social support, and transparent procurement process contributed positively to value for money viability analysis. The results imply that practitioners should consider these key indicators for improving the value for money viability of PPP projects.


Author(s):  
Babak Sohrabi ◽  
Amir Khanlari

Public administration has been challenged by “new public management” and “government redesign” paradigms. In addition, the relationship between government and citizen has been changed dramatically based on the mentioned paradigm shift. Customer orientation in the public sector is one of the changes originated from the private sector’s principles and paradigms. Nowadays, scholars emphasize applying concepts and techniques of customer orientation in e-government. In this text, firstly, customer orientation and its importance in government activities, especially e-government, is described. Then, principles, applications, and experiences of citizen relationship management as a technique of customer-oriented governments are described.


Sign in / Sign up

Export Citation Format

Share Document