Mining-induced surface subsidence

1999 ◽  
pp. 438-465 ◽  
Author(s):  
B. H. G. Brady ◽  
E. T. Brown
Keyword(s):  
2015 ◽  
Vol 1 (1) ◽  
pp. 13-20
Author(s):  
Hamid Reza Samadi ◽  
Mohammad Reza Samadi

Due to the development of cities as well as rapid population growth, urban traffic is increasing nowadays. Hence, to improve traffic flow, underground structures such as metro, especially in metropolises, are inevitable. This paper is a research on the twin tunnels Of Isfahan's metro between Shariaty station and Azadi station from the North towards the South. In this study, simultaneous drilling of subway's twin tunnels is simulated by means of Finite Difference Method (FDM) and FLAC 3D software. Moreover, the lowest distance between two tunnels is determined in a way that the Law of Super Position could be utilized to manually calculate the amount of surface subsidence, resulted by drilling two tunnels, by employing the results of the analysis of single tunnels without using simultaneous examination and simulation. In this paper, this distance is called "effective distance". For this purpose, first, the optimum dimensions of the model is chosen and then, five models with optimum dimensions will be analyzed separately, each of which in three steps. The results of analyses shows that the proportions (L/D) greater than or equal 2.80, the Law of Super Position can be applied for prediction of surface subsidence, caused by twin tunnels' construction


2017 ◽  
Vol 8 ◽  
pp. 187-194
Author(s):  
Yu.V. Posyl'nyy ◽  
◽  
A.V. Vyal'tsev ◽  
V.V. Popov ◽  
F.I. Yagodkin ◽  
...  

Author(s):  
Qing Ding ◽  
Zhenfeng Shao ◽  
Xiao Huang ◽  
Orhan Altan ◽  
Qingwei Zhuang ◽  
...  

2006 ◽  
Vol 22 (3) ◽  
pp. 213-220 ◽  
Author(s):  
K. J. Shou ◽  
F. W. Chang

AbstractIn this study, physical and numerical models were used to analyze pipe-soil interaction during pipejacking work. After calibrating with the physical modeling results, the finite element software ABAQUS [1] was used to study the pipejacking related behavior, such as surface subsidence, failure mechanism, pipe-soil interaction, etc. The results show that the driving force in the tunnelling face is very important and critical for pipejacking. Surface subsidence is mainly due to the lack of driving force, however, excessive driving force could cause the unfavorable surface heaving problem. It also suggests that the depth of the pipe is critical to determine a proper driving force to stabilize the tunnelling face.


2014 ◽  
Vol 915-916 ◽  
pp. 108-113
Author(s):  
Wei Kai Zong

Shield construction will cause surface subsidence, and the presence of underground structures above the tunnel has an impact on surface subsidence. Based on this, with the engineering of undercross shield tunnel construction on railway station as background, used numerical simulation method to analyze the effect of surface subsidence of underground passage, and studied the influence of depth and width of underpasses on ground movement induced. The results show that: The impact of the underground passage to the wire surface subsidence caused by the shield cannot be ignored. Surface subsidence caused by double shield will be decreased because of the existence of the underground passage, and that related to the channel depth and width. The greater the depth of underground channel, the greater the surface subsidence; greater the underground channel width, the smaller surface subsidence. Meanwhile, the surface subsidence trough width and the largest settlement scope unrelated to the depth of underground tunnels but the underground channel width, and increases with the increasing of the underpass width.


2013 ◽  
Vol 859 ◽  
pp. 222-227
Author(s):  
Hong Jun Liu ◽  
Jin Hua Tan ◽  
Xue Wen Su ◽  
Hao Wu

Two typical monitoring sections are selected for obtaining the change law of the surface subsidence and the settlement after construction of soft soil foundations, and determining the reasonable unloading time. The research results show that the surface settlement rate is large during the filling stage, the rate decreases after the loading and gradually stabilized. The embankment midline settlement is larger than the settlement of the road shoulder which is concluded from the fact that the subsidence of the middle settlement plate is larger than those of the left and right plate. The surface subsidence rate is less than 5mm per month during the two month before unloading according to the data in the tables. The settlement after construction presumed from the middle plate is more significantly larger than that of left and right sides, hence, as the unloading basis of preloading drainage method in soft soil foundation treatment the settlement after construction which is calculated from the midline monitoring data of the road is appropriate. After 6 months the calculated post-construction settlements of the two sections are in the scope of the design requirement since they decrease with preloading time. The reliable basis is provided for the future design and construction of soft foundation in this area through the research results.