scholarly journals Risk Diagnosis and Management with BBN for Civil Engineering Projects during Construction and Operation

2018 ◽  
Vol 63 ◽  
pp. 00004
Author(s):  
Marian W. Kembłowski ◽  
Beata Grzyl ◽  
Agata Siemaszko ◽  
Adam Kristowski

The authors demonstrate how expert knowledge about the construction and operation phases combined with monitoring data can be utilized for the diagnosis and management of risks typical to large civil engineering projects. The methodology chosen for estimating the probabilities of risk elements is known as Bayesian Belief Networks (BBN). Using a BBN model one can keep on updating the risk event probabilities as the new evidence (monitoring information) becomes available. Furthermore, the updated probabilities estimated using the available data for the construction phase serve as background information for the subsequent phase. The integrated two-object model of construction-operation may be then used to optimize the decision making, thus minimizing the risks. To better show how the proposed approach works the authors use the example of the road tunnel constructed and operated under the Dead Vistula River in Gdansk.

2020 ◽  
Vol 3 (2) ◽  
Author(s):  
De Zhang

With the rapid development of cities, more and more new roads are built in various civil engineering projects. Subgrade construction is the core of road engineering system. Only by comprehensively ensuring the quality of road subgrade can the road performance be effectively improve and the development of urban construction be ensured. The quality of subgrade determines the traffic capacity of urban roads and plays a decisive role in the safety and stability of traffic. This article mainly analyzes the problems of road subgrade construction in civil engineering, and comprehensively puts forward countermeasures, so as to effectively improve the subgrade construction quality and ensure the smooth operation of roads.


2003 ◽  
Vol 33 (1) ◽  
pp. 153-160

The separation wall, one of the largest civil engineering projects in Israel's history, has been criticized even by the U.S. administration, with Condoleezza Rice stating at the end of June 2003 that it ““arouses our [U.S.] deep concern”” and President Bush on 25 July calling it ““a problem”” and noting that ““it is very difficult to develop confidence between the Palestinians and Israel with a wall snaking through the West Bank.”” A number of reports have already been issued concerning the wall, including reports by B'Tselem (available at www.btselem.org), the UN Office for the Coordination of Humanitarian Affairs (available at www.palestinianaid.info), and the World Bank's Local Aid Coordination Committee (LACC; also available at www.palestinianaid.info). UNRWA's report focuses on the segment of the wall already completed and is based on field visits to the areas affected by the barriers, with a special emphasis on localities with registered refugees. Notes have been omitted due to space constraints. The full report is available online at www.un.org/unrwa.


1986 ◽  
Author(s):  
Simon S. Kim ◽  
Mary Lou Maher ◽  
Raymond E. Levitt ◽  
Martin F. Rooney ◽  
Thomas J. Siller

2019 ◽  
Vol 9 (1) ◽  
pp. 14-17 ◽  
Author(s):  
Magdalena Kowacka ◽  
Dariusz Skorupka ◽  
Artur Duchaczek ◽  
Paweł Zagrodnik

AbstractThe work contains information on the implementation of surveying works in the road construction process. The aim of the research was to identify geodetic risk factors occurring at the stage of preparation of a construction project, the presence of which can greatly disrupt the undertaking such as the road construction. The research was carried out on the basis of expert knowledge, documentation obtained from various road construction projects and the analysis of disturbances at the initial stage of works.


2011 ◽  
Vol 243-249 ◽  
pp. 3530-3537
Author(s):  
Zu Song Wu ◽  
Guang Qi Chen ◽  
Kou Ki Zen ◽  
Xin Rong Liu

When the road tunnel is excavated, the multi lining is used to being applied. In order to keep the surrounding rock stabilize and arouse the self-stability of the surrounding rock, building the first support is essential. But the slabbing often occurs near the spring line on the surface of the first lining, and because the slabbling is a common failing and not attracted our most attentions, it will develop to the crack and threaten the stability of the structure finally. This paper uses the line elastic method to analyze the mechanics that causes this slabbing phenomenon via the interaction between the surrounding rock and the first lining, and suggests the measure that escape the slabbing.


2014 ◽  
Vol 21 (1) ◽  
pp. 111-126 ◽  
Author(s):  
Palaneeswaran Ekambaram ◽  
Peter E.D. Love ◽  
Mohan M. Kumaraswamy ◽  
Thomas S.T. Ng

Purpose – Rework is an endemic problem in construction projects and has been identified as being a significant factor contributing cost and schedule overruns. Causal ascription is necessary to obtain knowledge about the underlying nature of rework so that appropriate prevention mechanisms can be put in place. The paper aims to discuss these issues. Design/methodology/approach – Using a supervised questionnaire survey and case-study interviews, data from 112 building and engineering projects about the sources and causes of rework in projects were obtained. A multivariate exploration was conducted to examine the underlying relationships between rework variables. Findings – The analysis revealed that there was a significant difference between rework causes for building and civil engineering projects. The set of associations explored in the analyses will be useful to develop a generic causal model to examine the quantitative impact of rework on project performance so that appropriate prevention strategies can be identified and developed. Research limitations/implications – The limitations include: small data set (112 projects), which include 75 from building and 37 from civil engineering projects. Practical implications – Meaningful insights into the rework occurrences in construction projects will pave pathways for rational mitigation and effective management measures. Originality/value – To date there has been limited empirical research that has sought to determine the causal ascription of rework, particularly in Hong Kong.