scholarly journals Study of the Relationship between Procurement Duration and Project Performance in Design-Build Projects: Comparison between Water/Wastewater and Transportation Sectors

2013 ◽  
Vol 29 (4) ◽  
pp. 382-391 ◽  
Author(s):  
Susan M. Bogus ◽  
Giovanni C. Migliaccio ◽  
Ruoyu Jin
2014 ◽  
Vol 2014 ◽  
pp. 1-8 ◽  
Author(s):  
Xiang Ding ◽  
Zhaohan Sheng ◽  
Jianguo Du ◽  
Qian Li

Project delivery planning is a key stage used by the project owner (or project investor) for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very complex within a certain range. Besides, this paper points out that Design-Build method will be the prior choice when the potential contractors develop quickly. This paper provides the owners with methods and suggestions in terms of showing how the factors affect PDM selection, and it may improve the project performance.


2021 ◽  
Vol 13 (20) ◽  
pp. 11301
Author(s):  
Hong-Long Chen

Many studies demonstrate the importance of communication in project performance. However, little is known about how project communication exerts its effects on the outcomes of capital projects that have a large impact on environmental and economic sustainability. Using a longitudinal survey and bootstrap-based structural-equation modeling, this study uncovers how project competencies and team innovative behavior affect the relationship between project communication and capital project performance. This study collects repeated measures from project managers at two time points: immediately after the initiation and planning stages end and immediately after project completion. Excluding responses with missing data, this study’s sample includes 108 capital projects. This study finds that project technical and managerial competencies completely mediate the relationship between project communication and project performance. This study also finds that team innovative behavior affects project performance through the mediating effect of project technical competence. Team innovative behavior also moderates the relationship between project technical competence and project performance. Project communication has the largest effect on project performance despite having the smallest direct effect; project managerial competence possesses the next-largest effect on project performance despite having the largest direct effect. This study discusses the managerial and research implications.


2019 ◽  
Vol 50 (1) ◽  
pp. 89-96 ◽  
Author(s):  
Saurav Dixit ◽  
Kinshuk Saurabh

Performance of a construction project could be influenced by a number of attributes, especially large and complex projects lay additional focus on the success / failure attributes, because of the intensive amount of money invested, a high degree of uncertainty, the complexity of personnel’s required, a multiplicity of goals and problems in coordination between different stakeholders encountered. In this research paper, the author intended to define and examine the relationship and impact of construction productivity (CP) over construction project performance (CPP). The author tests the proposition that there is a positive relationship/impact between both of them. And to test the effect of factors is affecting CP on CPP and to propose a conceptual model on the basis of the analysis. To validate the mathematical validity of factor analysis, Spearman correlation analysis has been performed on the factors. And to check the reliability of all the factors using reliability analysis, and finally test the hypothesis that construction productivity is having a positive impact on project performance using one sample t-test. The findings of the study concluded that there is a positive impact of construction productivity on project performance in Indian construction projects. This paper attempts to identify the relationship between CP and CPP and recommends the framework for the industry to grow sustainably and deliver projects successfully. This study is conducted using a structured questionnaire survey in India and to validate the results of the study similar kind of study is required to be conducted in the other regions of the country to have more reliable findings."This paper is the revised version of the paper that has been published in the proceedings of the Creative Construction Conference 2018: Dixit, S., Mandal, S. N., Thanikal, J. V, & Saurabh, K. (2018). Construction Productivity and Construction Project Performance in Indian Construction Projects, m(July), 379–386. https://doi.org/10.3311/CCC2018-050".


2009 ◽  
pp. 2247-2261
Author(s):  
James Jiang ◽  
Gary Klein ◽  
Phil Beck ◽  
Eric T.G. Wang

To improve the performance of software projects, a number of practices are encouraged that serve to control certain risks in the development process, including a lack of essential skills and knowledge related to the application domain and system development process. A potential mediating variable between the lack of skill risk and project performance is the ability of an organization to acquire the essential domain knowledge and technology skills through learning, specifically organizational technology learning. However, the same lack of knowledge that hinders good project performance may also inhibit learning. This study examines the relationship between information system personnel skills and domain knowledge, organizational technology learning, and software project performance with a sample of professional software developers. Indications are that the relationship between information systems (IS) personnel skills and project performance is partially mediated by organizational technology learning.


2018 ◽  
Vol 49 (5) ◽  
pp. 64-84
Author(s):  
Matt Rahimi ◽  
Thomas P. Kenworthy ◽  
Jaydeep Balakrishnan

We examine the effects of predictors from the firm, project, and individual levels on innovative behavior within oil and gas projects. The theory and propositions tested in this study stem from extant work on (1) innovation in poor performance conditions and (2) the availability of slack resources. The research findings revealed that innovative behaviors were present regardless of size, type, and project performance level. Further, it appears that the relationship between slack and innovation depends on when the innovation is introduced (i.e., when project performance is ahead of, or behind, a plan). Finally, the existence of innovation in (1) under-performing projects did not appear to exert any influence on project outcome, and (2) over-performing projects appeared to exert a negative influence on project outcome.


2012 ◽  
Vol 468-471 ◽  
pp. 1435-1438
Author(s):  
Wei Ping Jiang ◽  
Qian Zhang ◽  
Yun Le ◽  
Jian Fang

There is in lack of trust in construction projects. It is criticized by many scholars. Trust has the function of decreasing transaction cost and improving project performance. The characteristics of the trustee have important function on occurrence of trust. More specifically, the trustee’s reputation, competence and promise keeping contribute to occurrence of trust.


Author(s):  
Ramin Asadi ◽  
Suzanne Wilkinson ◽  
James Olabode Bamidele Rotimi

Rework occurs across the life cycle of projects and has significant impacts on construction project performance. A rational approach to managing rework is by identifying the main sources of rework; then mitigation measures can be implemented to enhance performance on projects. Rework has been widely studied within the construction industry, but the link between rework and contract conditions remain unexplored. This study identifies and classifies the root causes of rework at the construction stage of projects. It then examines the relationship between the conditions of contracts with the identified root causes. A comprehensive list of rework root causes was determined through the review of literature, which was categorized into five classified factors. The classified factors include process, human resource, material/equipment, technical, and other related environmental and financial factors. The next step comprises a questionnaire survey designed to determine relationships between rework and contracts. The result of the study is presented descriptively for ease of understanding. The results show that rework could be managed more efficiently through contracting processes, which ultimately benefits construction projects’ performance.