Factors influencing construction time and cost overruns on high-rise projects in Indonesia

1997 ◽  
Vol 15 (1) ◽  
pp. 83-94 ◽  
Author(s):  
Peter F. Kaming ◽  
Paul O. Olomolaiye ◽  
Gary D. Holt ◽  
Frank C. Harris
2018 ◽  
Vol 995 ◽  
pp. 012043 ◽  
Author(s):  
A Nor Haslinda ◽  
T Wei Xian ◽  
K Norfarahayu ◽  
R Muhamad Hanafi ◽  
H Muhammad Fikri

2020 ◽  
Vol 27 (10) ◽  
pp. 3135-3153
Author(s):  
Muhammad Irfan ◽  
Muhammad Sohail Anwar Malik ◽  
Syyed Sami Ul Haq Kaka Khel

PurposeThe purpose of this research is to rank the most significant factors of organizational structure that can reduce time and cost overruns (nonphysical waste) in road projects of the developing countries. Additionally, the effect of factors of organizational structure on nonphysical waste in road projects is also measured.Design/methodology/approachFactors of organizational structure causing time and cost overrun are extracted through a content analysis of the published literature. Moreover, a questionnaire survey is carried out involving 128 professionals to assess the effect of organizational structure factors on time and cost overrun. Finally, to obtain a more objective evaluation, relative importance index and regression analysis techniques are utilized, and the most severe factors influencing time and cost overrun are indicated.FindingsThis study found out that top management support and procurement procedures are the most significant factors influencing time and cost overruns in road projects of the developing countries.Originality/valueA small number of studies have been conducted to investigate the effect of factors of organizational structure on time and cost overrun in the construction industry. And even more, its relation with respect to road projects of the developing countries is limited. This research highlights the effect of most significant factors of organizational structure that influence the nonphysical waste in road projects of the developing countries. Therefore, this study adds to the body of knowledge by recommending that all the stakeholders of construction project should pay close attention toward these factors to control the enigma of time and cost overrun. It might also prove helpful, if implemented to its full extent, in all the road construction activities undertaken.


2020 ◽  
Vol 11 (4) ◽  
pp. 1184
Author(s):  
Ashem Emmanuel Egila ◽  
Oluwaseun Abdulakeem Balogun ◽  
Saheed Olanrewaji Yusuf

Poor road infrastructure in Nigeria is a significant challenge, just like poverty, insecurity, and unemployment. The construction of road in the country is characterized by numerous challenges throughout the project life cycle. Some of these challenges are project delay and cost overrun, corruption and fraud, faulty contractual process among others. Objectives of this study are to identify factors influencing delays and cost overruns in road construction project, to rank these factors base on their impacts and importance, and to suggest conservative ways to address the future challenges that can result from delays and cost overruns of future road construction projects. The research instruments include in-depth literature review, fieldwork, questionnaire administration, and interview. Inferential statistics such as Relative importance index (RII) and Mean Value techniques were used to analyze collected data. The result of the study identified factors influencing delays and cost overruns in road construction projects as; man related, money-related, machine-related, material related, environmental-related, and method related factors. Analysis using RII and MV ranked man and money related as the highest factors for delay and cost overrun respectively. Hence, the research recommends that the Government should create an enabling environment, making suitable policy for the construction company to operate.


2020 ◽  
Vol 10 (20) ◽  
pp. 7159 ◽  
Author(s):  
Yanhui Sun ◽  
Jun Wang ◽  
Jeremy Wu ◽  
Weixiang Shi ◽  
Dazhi Ji ◽  
...  

Off-site construction has been increasingly employed due to its advantages, for instance, improved quality control, reduced skills labour, faster construction time, decreased material wastage and safe working environment. As the most cutting-edge off-site construction, modular buildings have been utilised for residential building, student accommodation, and hotel projects. However, because of existing and underlying constraints, the adoption of modular buildings is still relatively low. To reveal factors hindering the development of high-rise modular buildings, a comprehensive literature review, coupled with a focus group study, were conducted. A questionnaire survey inquiring about all stakeholders was implemented to quantify constraints. The results were further examined according to a real-life case study. This paper manifested that “Lack of coordination and communication among stakeholders”, “Higher cost”, “Lack of government support”, “Lack of experience and expertise”, “Lack of building codes and standards”, “Poor supply chain integration”, and “Complexity of connection” are the top barriers curbing the uptake of modular buildings. The findings should provide a valuable reference for stakeholders adopting modular buildings, whilst mitigating risks amid modular construction. Future research is expected to exploit building information modelling and design for manufacture and assembly to alleviate these existing constraints and promote the performance of modular construction as well.


2017 ◽  
Vol 17 (1) ◽  
pp. 25-44 ◽  
Author(s):  
John Lindgren ◽  
Stephen Emmitt

Purpose The purpose of this paper is to identify factors that influence the diffusion of a systemic innovation in the Swedish construction sector. The focus is on high-rise multi-storey timber housing; the development of which was enabled by a change in building regulations. This allowed building higher than two stories in timber. Design/methodology/approach A longitudinal case study was used with multiple data collection methods to study the development and diffusion of a multi-storey timber house system by a case study organisation. Findings The findings contribute to understanding for a number of interacting factors influencing the diffusion of a systemic innovation related to the case study organisation. Originality/value The research provides a holistic view of interacting factors influencing the diffusion of a systemic innovation. The results have value to the Swedish construction sector and to the global community of construction researchers, as it provides empirical findings that further increase the understanding for diffusion of systemic innovations in a specific context.


2013 ◽  
Vol 2013 (1) ◽  
pp. 4078
Author(s):  
Markey Johnson ◽  
Gary Mallach ◽  
Ryan Kulka ◽  
Russell Dietz ◽  
Terry Sullivan ◽  
...  

2018 ◽  
Vol 33 ◽  
pp. 03012 ◽  
Author(s):  
Viktoriya Vilken ◽  
Olga Kalinina ◽  
Alissa Dubgorn

In paper features of the regional markets of construction the commercial and residential real estate on the example of St. Petersburg are defined. The current situation is analysed, the specific features of branch are revealed. The major factors influencing investors making decisions on construction of various types of objects are defined. The main methods of advance of real estate objects are considered.


Author(s):  
K Ullah ◽  
A H Abdullah ◽  
S Nagapan ◽  
S Suhoo ◽  
M S Khan