scholarly journals Analysis Of Quality Control Plans For Bridge Over The River Maza Jugla Accoring To COST TU 1406 Methodology

2021 ◽  
Vol 1202 (1) ◽  
pp. 012028
Author(s):  
Roberts Auzins ◽  
Ainars Paeglitis

Abstract Bridges are one of the most expensive elements of the road network, and therefore in the bridge management process, it is very important to make the most technically efficient and cost-effective decisions about planned actions such as maintenance, rehabilitation and reconstruction works. Decisions have to be based both on the current situation and possible future options and alternatives. The European Cooperation in Science and Technology (COST) during the action TU 1406 “Quality specifications for roadway bridges, standardization at a European level (BridgeSpecs)” in the period from 2014 to 2019 has developed the framework for the development of bridge Quality Control Plans (QCP) including the system of data collection, data processing and outcomes. This article analyses and compares different Quality Control Plans developed according to COST TU 1406 methodology for the existing bridge over the river Maza Jugla, located on regional road P10 at km 34.80 in Latvia.

2021 ◽  
Vol 23 (08) ◽  
pp. 824-836
Author(s):  
Tarekegn Shirko Lachore ◽  
◽  
Dagimwork Asele Manuka ◽  

Pavement Management System is designed to provide objective information and useful data for analysis so that road managers can make more consistent, cost-effective, and defensible decisions related to the preservation of a pavement network. During the process of road network maintenance and rehabilitation, road authorities strive to select an optimum maintenance strategy from a number of alternatives. Mathematical optimization models, supported by suitable data, can assist decision making about allocating funds between alternative maintenance tasks and about the size of the maintenance budget. It can be done through the analysis of costs and benefits by comparing the various maintenance alternatives with the help of an optimization method known as solver. The road segment mainly included in study was road from Hosanna Menhariya to Wachemo University and other important access roads. These roads are divided into different sections in not more than 100m length. The Study involves data collection, data analysis and the selection of optimal maintenance strategy by using a method known as Solver (Add-ins in Microsoft excel). In this study, patching was selected as possible maintenance among the other alternatives. The result of solver analysis for patching indicates that as 74,574 birr allocated for the maintenance of pavement per kilometer in different three segments under the municipality having the constraint budget of 152,018.45 birr/km. The optimized solution shows that about 20962.5 birr would be saved in one year per km with in municipality.


Road ways are the life line of any economy, for a country like India where economy isgrowing rapidly it is putting its toll on every sector for meeting the needs of the growing economy. Good’s and personal transport are becoming vital with time and money aspects and the roads and vehicles on the roads are expected to perform optimally drastically increasing the speed on the road network and constantly increasing and modifying the infrastructure needed to meet the demands. As the speed of the vehicle increases the accident rate and the damage caused by the collision will also increase. Safety of the road network is not to be compromised and proper systems to ensure the safe passage of the vehicle and proper warning systems are to be implemented. This system should be viable in all the condition and should be cost-effective. In this paper we are implementing a vision based system to identify the lane and other vehicles from the video it captures from a properly calibrated camera mounted on the front side of the vehicle. The system is designed to automatically and continuously detect the lines exploiting the new processing techniques and warning the driver if any other is in the breaking distance of the vehicle or if the vehicle is moving out of the lane. Cost effectiveness of the system is a major aspect as many of the available systems use equipment which very good at performing their task but are not affordable. Effort is put in making the system cost effective and not compromising with the reaction time and accuracy..


Author(s):  
Ezra Hauer ◽  
Jake Kononov ◽  
Bryan Allery ◽  
Michael S. Griffith

Network screening is the first step in the site safety improvement process. The product of network screening is a list of sites that are ranked by priority for the conduct of detailed engineering studies. In turn, cost-effective projects are formulated from the studies. With the purpose of laying the foundation for improved network screening, the role of network screening is clarified, and how project cost and safety benefit can be anticipated at the time of screening is examined. The strengths and weaknesses of alternative assumptions on which the anticipation of safety benefit can be based are discussed. A way to guard against misallocation of resources due to the randomness of accident counts is suggested, and a method for finding peak sites within road sections is proposed.


2019 ◽  
Vol 2 (5) ◽  
Author(s):  
Tong Wang

The compaction quality of the subgrade is directly related to the service life of the road. Effective control of the subgrade construction process is the key to ensuring the compaction quality of the subgrade. Therefore, real-time, comprehensive, rapid and accurate prediction of construction compaction quality through informatization detection method is an important guarantee for speeding up construction progress and ensuring subgrade compaction quality. Based on the function of the system, this paper puts forward the principle of system development and the development mode used in system development, and displays the development system in real-time to achieve the whole process control of subgrade construction quality.


2017 ◽  
Vol 11 (3) ◽  
pp. 255
Author(s):  
Jeky El Boru

Abstract: This research aims to analyze the impact of Janti Flyover Construction toward the growth of layout at Janti Urban Area, including structured space, open space, and linkage. Method used for data collecting are observation, air photograph monitoring, and interview, whereas the analysis method is qualitative description, which is the superimposed method of two layers, that are the layout condition before and after flyover construction. The result shows that the impact of Janti Flyover construction can be seen on building mass (solid), the increasing number of open spaces, including the road network, parking place, and park, whereas the relation between spaces, visually and structurally, can be seen on the growth of buildings which have new shapes and styles, therefore the performance of the overall building does not have a proportional shape. Considering Janti Street at the collective relation, its role is getting stronger as the main frame road network.Keywords: Flyover construction, layout changing, Janti AreaAbstrak: Penelitian ini bertujuan untuk menganalisis pengaruh pembangunan Jalan Layang Janti terhadap perkembangan tata ruang Kawasan Janti, meliputi ruang terbangun, ruang terbuka, serta hubungan antar ruang (“linkage”). Metode pengumpulan data dilakukan melalui observasi, pengamatan foto udara, dan wawancara; sedangkan metode analisis melalui deskripsi secara kualitatif yang berupa “superimposed method” dari dua lapisan kondisi lahan, yakni kondisi tata ruang sebelum dan sesudah pembangunan jalan layang. Hasil penelitian menunjukkan bahwa pengaruh pembangunan Jalan Layang Janti terdapat pada massa bangunan (“solid”), pertambahan ruang terbuka yang berupa jaringan jalan, parkir, dan taman; sedangkan pada hubungan antar ruang ̶ secara visual dan struktural ̶ yakni tumbuhnya bangunan dengan bentuk dan gaya baru, sehingga bentuk tampilan bangunan secara keseluruhan tidak proporsional. Pada hubungan kolektif, Jalan Janti semakin kuat perannya sebagai kerangka utama jaringan jalan.Kata kunci : Pembangunan jalan layang, tata ruang, Kawasan Janti


Author(s):  
Oleksandra Cherednichenko ◽  

The results of the study of the main elements of unobstructed space are presented and the compliance of the actual state with the regulatory requirements of measures to ensure a safe, comfortable, accessible and informative pedestrian zone of the road network is analyzed. A comparative analysis of the main regulatory requirements for access ramps on the legislation of Ukraine and the European Union is carried out.


2016 ◽  
Vol 167 (5) ◽  
pp. 294-301
Author(s):  
Leo Bont

Optimal layout of a forest road network The road network is the backbone of forest management. When creating or redesigning a forest road network, one important question is how to shape the layout, this means to fix the spatial arrangement and the dimensioning standard of the roads. We consider two kinds of layout problems. First, new forest road network in an area without any such development yet, and second, redesign of existing road network for actual requirements. For each problem situation, we will present a method that allows to detect automatically the optimal road and harvesting layout. The method aims to identify a road network that concurrently minimizes the harvesting cost, the road network cost (construction and maintenance) and the hauling cost over the entire life cycle. Ecological issues can be considered as well. The method will be presented and discussed with the help of two case studies. The main benefit of the application of optimization tools consists in an objective-based planning, which allows to check and compare different scenarios and objectives within a short time. The responses coming from the case study regions were highly positive: practitioners suggest to make those methods a standard practice and to further develop the prototype to a user-friendly expert software.


Sign in / Sign up

Export Citation Format

Share Document