Business process management – a construction case study

2017 ◽  
Vol 17 (1) ◽  
pp. 50-67 ◽  
Author(s):  
Bhargav Dave

Purpose This paper aims to demonstrate the need for a structured business process improvement effort needed while restructuring organisational processes within a construction company. Through the longitudinal study, the study also highlights the importance of a continuous improvement initiative to sustain such an improvement effort. Design/methodology/approach The research followed an action research and the case study approach using semi-structured interviews and group workshops within the case organisation. Overall, six departments were analysed, 35 interviews with senior and middle managers were conducted, existing business process documents were studied and processes were documented. The data were compiled using a process modelling software and Business Process Markup Notation methodology. Additionally, a longitudinal analysis following the completion of process modelling exercise was carried out over a period of eight years. Findings The overall study highlights the importance of business process management (BPM) for construction organisations. The case study also demonstrated that even smaller business units and its processes affected the overall value chain in a major way and the importance to analyse the process interdependencies between organisational units. Research limitations/implications The main limitation of the research was that it is based on a single-case-study company based in the UK. More research is needed with other organisations with different work practices and culture and geographic location. Practical implications Primarily, the research outlines specific steps taken during a structured process improvement exercise in a construction company, including procedures for collecting data, developing process maps and analysis of data. The longitudinal study highlights the challenges in sustaining such an initiative. For practitioners, strengths and weaknesses of various process improvement methods and a detailed description of a BPM implementation can be used as a guideline for future projects. From a research point of view, the paper highlights the need for deeper and long-term analysis of such initiatives and the importance of immersion of researchers within the environment. Originality/value The paper provides deeper insights into the structured process improvement exercise within a construction company. Second and more importantly, the longitudinal study is one of its kind in the construction industry to shed light on the factors affecting sustainability of such initiatives.

2015 ◽  
Vol 21 (2) ◽  
pp. 250-266 ◽  
Author(s):  
Peter Trkman ◽  
Willem Mertens ◽  
Stijn Viaene ◽  
Paul Gemmel

Purpose – The purpose of this paper is to argue that in order to achieve customer centricity through business process management (BPM), companies have to obtain the profound understanding of customers’ processes and when necessary change not only the interactions with but also the processes of their customers. A method is presented that allows doing this in a systematic manner. Design/methodology/approach – A case study of a large multinational company was conducted. Several different sources and methods were used, including document analysis, interviews and a qualitative analysis of responses to open-ended questions. Data were gathered at three points in time: before, during and after the implementation of the presented approach. Findings – The method that was successfully employed by the case organisation consisted of combining BPM with service blueprinting, and of extending these efforts by integrating the customers’ internal processes into the scope of improvement. Research limitations/implications – The paper does not thoroughly evaluate the long-term effects of the proposed approach. Some results of the case study analysis had to be excluded from this paper due to reasons of confidentiality. Practical implications – The paper presents an approach for organisations to not only understand the needs of their customers but also the way in which their product is used in customers’ processes. In this way BPM can be implemented in a truly customer-oriented way. Originality/value – This paper extends previous work by presenting one way in which BPM can follow up on its promise of increasing an organisations customer orientation. While servitisation has received a lot of attention in various disciplines, its application within BPM research and practice has been scarce.


2020 ◽  
Author(s):  
◽  
Nicole Neufeld

Recent literature published by some practitioners, consultants, and researchers in the area of Business Process Management (BPM) identified that BPM is a new and emerging field of research and practice. The objective of this paper is to identify the conceptual framework of BPM, identify if connections exist with prior process improvement concepts such as Business Process Re-engineering (BPR), Total Quality Management (TQM) and Business Process Improvement (BPI), and apply BPM in a case study to determine the effectiveness of the current methodology. An extensive literature review was conducted, identifying multiple similarities between BPM and prior process improvement concepts, suggesting an evolving nature of the concept. The BPM methodology was then applied in a controlled case study, identifying a major inefficiency in the methodology. The findings of this paper are useful to researchers, educators, students, and managers to understand the evolution of BPM, and determine how it can be applied.


2016 ◽  
Vol 22 (6) ◽  
pp. 1069-1078 ◽  
Author(s):  
Devika Nadarajah ◽  
Sharifah Latifah Syed A. Kadir

Purpose Past research examining Business Process Management (BPM) mainly focussed on either process alignment, business process orientation (BPO) or process improvement initiative (PII) constructs. However, based on the definition of BPM by Zairi (1997) and Lee and Dale (1998), BPM comprises all the elements of process alignment, BPO and PII. Hence, the purpose of this paper is to present a total view of measuring BPM through combining BPO and PIIs. Design/methodology/approach Quantitative research technique was applied for this study. The study was carried out in Malaysia. Close-ended survey instrument was administered to a large number of organisations. Findings The findings revealed that the elements of BPM cover both process management as well as process improvements. Originality/value The findings from this study is important for practitioners to regard continuous improvement as a component of BPM practice.


2016 ◽  
Vol 22 (1) ◽  
pp. 56-74 ◽  
Author(s):  
Stefania Bisogno ◽  
Armando Calabrese ◽  
Massimo Gastaldi ◽  
Nathan Levialdi Ghiron

Purpose – The purpose of this paper is to provide a method for analysing and improving the operational performance of business processes (BPs). Design/methodology/approach – The method employs two standards, Business Process Modelling Notation (BPMN 2.0) and Business Processes Simulation (BPSim 1.0), to measure key performance indicators (KPIs) of BPs and test for potential improvements. The BP is first modelled in BPMN 2.0. Operational performance can then be measured using BPSim 1.0. The process simulation also enables execution of reliable “what-if” analysis, allowing improvements of the actual processes under study. To confirm the validity of the method the authors provide an application to the healthcare domain, in which the authors conduct several simulation experiments. The case study examines a standardised patient arrival and treatment process in an orthopaedic-emergency room of a public hospital. Findings – The method permits detection of process criticalities, as well as identifying the best corrective actions by means of the “what-if” analysis. The paper discusses both management and research implications of the method. Originality/value – The study responds to current calls for holistic and sustainable approaches to business process management (BPM). It provides step-by-step process modelling and simulation that serve as a “virtual laboratory” to test potential improvements and verify their impact on operational performance, without the risk of error that would be involved in ex-novo simulation programming.


2021 ◽  
Vol 11 (8) ◽  
pp. 3438
Author(s):  
Jorge Fernandes ◽  
João Reis ◽  
Nuno Melão ◽  
Leonor Teixeira ◽  
Marlene Amorim

This article addresses the evolution of Industry 4.0 (I4.0) in the automotive industry, exploring its contribution to a shift in the maintenance paradigm. To this end, we firstly present the concepts of predictive maintenance (PdM), condition-based maintenance (CBM), and their applications to increase awareness of why and how these concepts are revolutionizing the automotive industry. Then, we introduce the business process management (BPM) and business process model and notation (BPMN) methodologies, as well as their relationship with maintenance. Finally, we present the case study of the Renault Cacia, which is developing and implementing the concepts mentioned above.


2021 ◽  
Vol 22 (5) ◽  
pp. 1117-1128
Author(s):  
Jia-Xing Wang Jia-Xing Wang ◽  
Si-Bin Gao Jia-Xing Wang ◽  
Cong-Er Yuan Si-Bin Gao ◽  
Da-Peng Tan Cong-Er Yuan ◽  
Jing Fan Da-Peng Tan


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Sami Wasef Abuezhayeh ◽  
Les Ruddock ◽  
Issa Shehabat

Purpose The purpose of this paper is to investigate and explain how organizations in the construction sector can enhance their decision-making process (DMP) by practising knowledge management (KM) and business process management (BPM) activities. A conceptual framework is developed that recognises the elements that impact DMP in terms of KM and BPM. The development of this framework goes beyond current empirical work on KM in addition to BPM as it investigates a wider variety of variables that impact DMP. Design/methodology/approach A case study is undertaken in the context of the construction industry in Jordan. A theoretical framework is developed and assessment of the proposed framework was undertaken through a questionnaire survey of decision-makers in the construction sector and expert interviews. Findings The outcomes of this research provide several contributions to aid decision-makers in construction organizations. Growth in the usage of KM and BPM, in addition to the integration between them, can provide employees with task-related knowledge in the organization’s operative business processes, improve process performance, promote core competence and maximise and optimise business performance. Originality/value Through the production of a framework, this study provides a tool to enable improved decision-making. The framework generates a strong operational as well as theoretical approach to the organizational utilization of knowledge and business processes.


2019 ◽  
Vol 25 (6) ◽  
pp. 1291-1316 ◽  
Author(s):  
Sarah Zelt ◽  
Jan Recker ◽  
Theresa Schmiedel ◽  
Jan vom Brocke

Purpose Many researchers and practitioners suggest a contingent instead of a “one size fits all” approach in business process management (BPM). The purpose of this paper is to offer a contingency theory of BPM, which proposes contingency factors relevant to the successful management of business processes and that explains how and why these contingencies impact the relationships between process management and performance. Design/methodology/approach The authors develop the theory by drawing on organizational information processing theory (OIPT) and applying an information processing (IP) perspective to the process level. Findings The premise of the model is that the process management mechanisms such as documentation, standardization or monitoring must compensate for the uncertainty and equivocality of the nature of the process that has to be managed. In turn, managing through successful adaptation is a prerequisite for process performance. Research limitations/implications The theory provides a set of testable propositions that specify the relationship between process management mechanisms and process performance. The authors also discuss implications of the new theory for further theorizing and outline empirical research strategies that can be followed to enact, evaluate and extend the theory. Practical implications The theory developed in this paper allows an alternative way to describe organizational processes and supports the derivation of context-sensitive management approaches for process documentation, standardization, monitoring, execution and coordination. Originality/value The theoretical model is novel in that it provides a contextualized view on BPM that acknowledges different types of processes and suggests different mechanisms for managing these. The authors hope the paper serves as inspiration both for further theory development as well as to empirical studies that test, refute, support or otherwise augment the arguments.


2019 ◽  
Vol 26 (1) ◽  
pp. 191-211
Author(s):  
Patricia Bazan ◽  
Elsa Estevez

Purpose The purpose of this paper is to assess the state of the art of social business process management (Social BPM), explaining applied approaches, existing tools and challenges and to propose a research agenda for encouraging further development of the area. Design/methodology/approach The methodology comprises a qualitative analysis using secondary data. The approach relies on searches of scientific papers conducted in well-known databases, identifying research work related to Social BPM solutions and those contributing with social characteristics to BPM. Based on the identified papers, the authors selected the most relevant and the latest publications, and categorized their contributions and findings based on open and selective coding. In total, the analysis is based on 51 papers that were selected and analyzed in depth. Findings Main results show that there are several studies investigating modeling approaches for socializing process activities and for capturing implicit knowledge possessed and used by process actors, enabling to add some kind of flexibility to business processes. However, despite the proven interest in the area, there are not yet adequate tools providing effective solutions for Social BPM. Based on our findings, the authors propose a research agenda comprising three main lines: contributions of social software (SS) to Social BPM, Social BPM as a mechanism for adding flexibility to and for discovering new business processes and Social BPM for enhancing business processes with the use of new technologies. The authors also identify relevant problems for each line. Practical implications Some SS tools, like wikis, enable managing social aspects in executing business processes and can be used to coordinate simple business processes. Despite they are commonly used, they are not yet mature tools supporting Social BPM and more efficient tools are yet to appear. The lack of tools preclude organizations from benefitting from implicit knowledge owned by and shared among business process actors, which could contribute to better-informed decisions related to organizational processes. In addition, more research is needed for considering Social BPM as an approach for organizations to benefit from the adoption of new technologies in their business processes. Originality/value The paper assesses the state of the art in Social BPM, an incipient area in research and practice. The area can be defined as the intersection of two bigger areas highly relevant for organizations; on the one hand, the management and execution of business processes; and on the other hand, the use of social software, including social media tools, for leveraging on implicit knowledge shared by business process actors to improving efficiency of business processes.


Author(s):  
Houda Mezouar ◽  
Abdellatif El Afia

The purpose of this paper is to develop an approach to analyse and evaluate continuity in Service Supply Chain (SSC), through a case study. This approach is based on the data-driven quality strategy "Define, Measure, Analyze, Improve, Control" (DMAIC) which is used to drive Six Sigma projects, and on the characteristics of Smart Supply Chain. It combines Business process management (BPM), Supply Chain Operations Reference (SCOR), and the Root cause analysis tree diagram. The chosen case study is the electricity SCC, especially the business process 'management of electricity for residential buildings' of the Moroccan electricity SSC. The paper shows that the suggested approach identifies the discontinuity causes for the studied SSC, improves the business process behavior and manages its control by providing a dashboard that encompasses KPIs for periodically controlling of the SSC "to-be" state.


Sign in / Sign up

Export Citation Format

Share Document