scholarly journals Developing a framework to revolutionise the 4D BIM process: IPD-based solution

2020 ◽  
Vol 20 (3) ◽  
pp. 401-420 ◽  
Author(s):  
Faris Elghaish ◽  
Sepehr Abrishami

Purpose The integration of building information modelling (BIM) and integrated project delivery (IPD) is highly recommended for better project delivery. Although there is a methodology for this integration, the BIM requires some improvements to foster the adoption of IPD. The purpose of this paper is to present an innovative way to support 4D BIM automation/optimisation within the IPD approach. Similar to structural and architectural design libraries, this research proposes a planning library to enable automating the formulation of schedule, as well as embedding the multi-objective optimisation into the 4D BIM. Design/methodology/approach The literature review was used to highlight the existing attempts to support the automation process for 4D BIM and the multi-objective schedule optimisation for construction projects. A case study was done to validate the developed framework and measure its applicability. Findings The results show that there is a cost-saving of 22.86 per cent because of using the proposed automated multi-objective optimisation. The case study shows the significance of integrating activity-based costing into 4D BIM to configure the hierarchy level of overhead activities with the IPD approach; therefore, the maximum level of contribution in managing the IPD project is 33.33 per cent by the trade package level and the minimum contribution is around 8.33 per cent by the project level. Originality/value This research presents a new philosophy to develop the 4D BIM model – planning and scheduling – a BIM library of the project activities is developed to enable the automation of the creation of the project schedule with respect to the 3D BIM design sequence. The optimisation of the project duration is considered to be automated within the creation process by using the proposed genetic algorithm model.

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Amy Beardmore ◽  
Penny Beynon ◽  
Christine Crabbe ◽  
Carol Fry ◽  
Jan Fullforth ◽  
...  

Purpose International attention is increasingly turning to the challenge of creating age-friendly environments. This study aims to examine the application of asset-based approaches in undertaking community development projects with older people. The paper intends to share the learning that may be useful when designing community development projects for older people in the future. Design/methodology/approach This study followed a multiple project case study design, with a focus on project delivery practices. It was undertaken as a co-production exercise involving university researchers and trained older volunteer community researchers (CRs). Over 18–24 months of qualitative research was conducted in relation to six area-based urban projects between 2018 and 2020. Findings There were five leading themes as follows: mapping and building on assets in highly localised settings; creating governance and direction through steering groups; developing activities with diverse groups of older people; reaching isolated and lonely older people; building local capacity to embed sustainability. Practical implications The effectiveness of assets-based approaches in promoting age-friendly agendas appears to be contingent on the values, skills, capacity and resourcing of delivery agencies, alongside wider public sector investment in communities. Diversity and inequalities amongst older people need to be taken into account and community development that specifically focuses on older people needs to be balanced with the whole population and intergenerational practice. Originality/value This paper provides an empirical account of the practical application of assets practices specifically in the context of the age-friendly community agenda. The co-production method brings together insights from academic and volunteer older CRs.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Xinbo Sun ◽  
Qingqiang Zhang

PurposeThe existing research rarely explains the role of dynamic capabilities in the creation of value co-creation behaviors. The purpose of this paper is to explore how dynamic capabilities play a role in avoiding value co-creation traps and generating new value co-creation behaviors.Design/methodology/approachThis paper collects rich interview and archival data from two Chinese manufacturing companies to examine value co-creation in digital servitization by the case study.FindingsThe paper discovers the value co-creation traps that enterprises face in digital servitization and analyzes the important role of resource and technology integration capabilities in avoiding these traps. Also, the research explores how network capability affects the generation of new value co-creation behaviors.Originality/valueThis paper develops a framework for dynamic capabilities to avoid value co-creation traps and generate new value co-creation behaviors.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ayşegül Akçay Kavakoğlu ◽  
Derya Güleç Özer ◽  
Débora Domingo-Callabuig ◽  
Ömer Bilen

PurposeThe paper aims to examine the concept of architectural design communication (ADC) for updating design studio dynamics in architectural education during the Covid-19 pandemic. Within this perspective, the changing and transforming contents of architectural education, the thinking, representation and production mediums are examined through the determined components of ADC. There are five components in the study, which are (1) Effective Language Use, (2) Effective use of Handcrafts, (3) Effective Technical Drawing Knowledge, (4) Effective Architectural Software Knowledge and (5) Outputs.Design/methodology/approachThe research method is based on qualitative and quantitative methods; a survey study is applied and the comparative results are evaluated with the path analysis method. The students in the Department of Architecture of two universities have been selected as the target audience. Case study 1 survey is applied to Altinbas University (AU) and Case study 2 survey is applied to Universitat Politecnica de Valencia (UPV) students during the COVID-19 pandemic; ‘19-‘20 spring term, online education.FindingsAs a result, two-path analysis diagrams are produced for two universities, and a comparative analysis is presented to reveal the relationships of the selected ADC components.Originality/valueThis paper fulfills an identified need to study how ADC can be developed in online education platforms.


2019 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Anna Wojewnik-Filipkowska ◽  
Anna Dziadkiewicz ◽  
Wioleta Dryl ◽  
Tomasz Dryl ◽  
Robert Bęben

Purpose Public involvement is essential in the creation of effective local strategies for the development of a sustainable built environment, yet there has been little research on stakeholder motivation and engagement in the creation of infrastructure-project value, in the entire life cycle of a given project, while different markets show that overlooking stakeholders can negatively affect the success of an infrastructure project. The purpose of this paper is to fill the theory-practice gap that has been discerned, and thus study how early public involvement determines the success of an infrastructure project, which is identified with its value creation (effectiveness, sustainability and utility). Design/methodology/approach This research entails a combination of methods. A case study analysis allowed observation of the role the stakeholders play and of how the relationships, perspectives, expectations and risks, along with other soft issues, continue to affect projects. The case study required comprehensive examination of project documentation and conduction of interviews. To collect data, focused group interviews and semi-structured interviews were used, supported with direct questionnaire surveys. Findings The study provides evidence that early public engagement can contribute to infrastructure-project value (effectiveness, sustainability and utility). Practically speaking, the stakeholder analysis performed allowed proposal of a general stakeholder analysis framework for infrastructure projects. It can be implemented at each investment phase of the project life cycle, since stakeholders and their motivation may develop and/or change over time, which necessitates development of proper managerial strategies. The findings highlight the opportunities and the challenges faced by stakeholder management. Research limitations/implications The limitation of this study derives from the fact that the sample size was small, which was necessary for an in-depth qualitative research and application of the case study method. The observations were made on a selected case study, within a limited period of time, thus the context of the analysis as well as the stakeholder perception was subject to possible change. The research limitations concern the provisional nature of the information obtained, the cross-sectional nature of the analysis itself, and, finally, the inability to predict all future events. Ultimately, stakeholder mapping was performed for the operational phase of the investment exclusively, while the analysis was limited to identification and classification of the stakeholders, including their relationship with the project. Practical implications The research conclusions provide useful input for future research on development of effective strategies for management of the shareholders that are related to a given infrastructure project, in order to achieve project success. Simultaneously, from a property perspective, the research has contributed to a better understanding of the importance of infrastructure, on the part of real estate stakeholders. Social implications Application of the approach proposed in the study may contribute to early development and implementation of appropriate trust-building processes. The building of relationships between stakeholders enables checks and balances, promotes short- and long-term project benefits, and increases the value of a project. Originality/value The novelty of the research consists in the connection, as part of infrastructure projects, of the theory of consumption values and the concept of an investment cycle with the framework of stakeholder analysis.


2014 ◽  
Vol 4 (3) ◽  
pp. 281-295 ◽  
Author(s):  
AbdulLateef A. Olanrewaju ◽  
Paul J. Anavhe

Purpose – With the increase in the cases of construction claims in Nigeria, many projects have remained uncompleted, while many of those completed receive poor client satisfaction. The purpose of this paper is to investigate how construction claims are managed. Design/methodology/approach – In total, 58 claim factors were identified and addressed to construction professionals through survey to indicate the extent at which the factors contributed to claims. A case study was conducted to illustrate claim management. Findings – In total, 37 factors were the major source of claims. Late payment, delayed approval of change order and delay cost were the extremely influential while the least were storage charges, loss of productivity, and costs of preparing claims. Evidences revealed that all stakeholders should play active roles to deliver “claim free” projects. Practical implications – The findings will be useful to practitioners in the effort to improve project delivery by providing some guidance on claim minimization. It is hoped that this study will encourage academics to conduct more research on this issue. Originality/value – There is no known conclusive empirical study on construction claim factors in Nigeria. In light of this, the findings offer greater opportunities for claim minimization/avoidance.


2016 ◽  
Vol 9 (2) ◽  
pp. 337-363 ◽  
Author(s):  
Joseph Kaggwa Ssegawa ◽  
Mark Muzinda

Purpose – Result-based management (RBM) is common approach used in the development sector to initiate, plan and implement projects. However, to the knowledge of the authors the approach has hardly been used in delivering projects in other sectors, for example, information technology, infrastructure or business. The purpose of this paper is to document a case study in which the RBM approach was used to guide the delivery of a business project in Botswana. Design/methodology/approach – A case study strategy was used to document the delivery process of the project. Data were collected from a variety of sources that included review of documents, interviews, focus discussions and a site visit. The content analysis technique was used to analyse the collected data. Findings – The case illustrates the possibility of using the RBM approach to initiate, plan and implement a project in the business sector. Research limitations/implications – Being a case study, the approach needs to be tested with more case studies. Practical implications – Apart from illustrating the possible use of RBM approach, the paper illustrates systematic processes used in the case study for project delivery. It also outlines some of the resultant challenges which may be appreciated by practitioners, academics and trainees. Originality/value – The use of RBM approach in guiding the delivery of a business project.


2019 ◽  
Vol 74 (4) ◽  
pp. 902-914 ◽  
Author(s):  
Xabier Barandiarán ◽  
Natalia Restrepo ◽  
Álvaro Luna

Purpose This paper aims to examine through a case study how the creation of collaborative spaces between local stakeholders can foster decision-making and collective development of projects that improve the governance of tourism destinations and their sustainability. Design/methodology/approach The paper focuses on the analysis of a case study based on the Etorkizuna Eraikiz (Building the Future) programme developed in the Gipuzkoa region located in the Basque Country, Spain. The programme is based on a strategy that seeks to institutionalize a new model of collaborative governance in the long term through the co-design of public policies involving stakeholders of the territory. Through the description and analysis of the results achieved so far, the paper presents the implications of this public programme for the design of policies. Findings Etorkizuna Eraikiz emerges as a model to develop an exercise of active experimentation. The analysis of this collaborative governance process has derived in practices and agendas promoted by a variety of agents within the region. The programme has important implications for the formulation of public policies in the field of tourism through the creation of formal interaction spaces and the implementation of projects in support of tourism development (Tourist Eco-tax and information and communication technology tools). Originality/value This paper provides a contemporary approach to the practices in governance within the context of tourism. This case study may be of interest to practitioners and researchers to adopt destination governance practices through the creation of collaborative spaces between local stakeholders. These practices can foster decision-making and the collective development of projects that impact and lead to better governance of tourism destinations and their sustainability.


2018 ◽  
Vol 19 (1) ◽  
pp. 181-198 ◽  
Author(s):  
Elodie Allain ◽  
Claude Laurin

Purpose The purpose of this paper is to explore how and why the uses (enabling or controlling) of an activity-based costing system could cause difficulties in implementing such a cost system. Design/methodology/approach The authors conducted a case study in a French insurance company. Three successive research periods were undertaken: from March to August 2005, between October 2008 and June 2009, and in 2012. In total, 51 interviews were conducted during these periods. Other useful information was also collected through conversations, observation, and through the consultation of internal documents. Findings The results show that designing a cost system aimed at being simultaneously used in controlling and enabling ways can generate important difficulties. Furthermore, the results show that attempting to get around these difficulties could result in investing significant amounts of resources with no guarantee of success. Research limitations/implications Beyond the difficulties of extending the scope of application of case studies, the study was conducted in an organization involved in the insurance industry which could further limit its general applicability. Practical implications Based on the experience at Rassura, the authors argue that managers should be aware that designing and implementing a cost system that can simultaneously be used in both controlling and enabling ways is a very difficult, if not an insurmountable challenge. Originality/value The results highlight that one important characteristic of a cost system, how it is used, could explain, at least partially, implementation difficulties related to technical challenges, resistance to change and lack of resources.


2015 ◽  
Vol 21 (1) ◽  
pp. 55-79 ◽  
Author(s):  
Lorella Cannavacciuolo ◽  
Maddalena Illario ◽  
Adelaide Ippolito ◽  
Cristina Ponsiglione

Purpose – The purpose of this paper is to set out a methodological framework to investigate how the integration of an activity-based costing (ABC) logic into the pre-existent accounting system supports healthcare organizations in identifying the inefficiencies related to their diagnostic therapeutic pathways (DTP) and related reengineering interventions. Design/methodology/approach – The BPM-ABC methodological framework has been applied to the case of a specific surgery pathway, at the Orthopaedic Division of a University Hospital in Italy. Findings – The case-study described in the paper points out: first, how the Business Process Management (BPM)-ABC methodology is able to produce significant information about consumed resources and the costs of the activities, useful to highlight opportunities for DTPs improvement; second, the barriers related to a pre-existing accounting system based on cost centres that can hinder the implementation of the BPM-ABC model. Practical implications – The case study points out the role of the ABC as a management tool for supporting decision-making processes. The ABC allows inferring information for two purposes. First, ABC supports a cost containment process as it allows highlighting the most cost-consuming activities and resources. Second, the ABC allows identifying reengineering paths, distinguishing between incremental and radical ones. Originality/value – This study represents a remarkable reference raising the awareness of the pivotal role accounting systems play in the management of the organizational processes.