A practical tool for evaluation of innovation outcomes in building projects

2016 ◽  
Vol 8 (4) ◽  
pp. 350-387 ◽  
Author(s):  
Soroush Maghsoudi ◽  
Colin Duffield ◽  
David Wilson

Purpose This paper aims to develop a practical tool to evaluate the outcomes of innovative practices in the building and construction industry. Design/methodology/approach A practical tool was proposed. It is an online tool programmed in a JavaScript environment. A previously developed and tested framework was the basis for this tool. Six case projects were used to test and validate the reliability of the tool. The outcomes of the building projects were categorized into six categories of economic, quality, social, environmental, satisfaction and soft and organizational impacts. Findings The most important finding of this research was that the evaluation of innovation in building and construction would be possible only if the subjective assessment is tolerated to include the non-monetary outcomes in the evaluation, as well as the monetary outcomes. Research limitations/implications The findings of this research are limited to the domestic and medium density building projects; thus, the outcomes might be generalized with appropriate care. The developed tool would assist practitioners in the field of building and construction to realize the impacts of innovation introduced into their projects. The project owners and developers could be the main audience of this tool. Practical implications The main contribution of the current study into the literature is the consideration of tangible and intangible outcomes of innovation together. In other words, this tool not only evaluates monetary outcomes but also takes into account non-monetary outcomes. It has been stated in the literature that 80 per cent of firms choose “non-numeric” project selection models (Meredith and Mantel, 2006). To provide a full representation of the reality, this model considers both numeric and non-numeric measures by applying both quantitative and qualitative evaluation methods. The project owners and developers could be the main audience of this tool. It is worth mentioning that this tool is the first attempt of its kind for building and construction projects, and it is applicable and fully practical. Originality/value This tool is the first attempt of its kind to evaluate practically the outcomes of innovation in the building and construction industry. The tool practicality and applicability in the real-world project is a privilege which gives more reliability and credibility to the proposed approach of innovation evaluation.

2016 ◽  
Vol 8 (1) ◽  
pp. 39-70 ◽  
Author(s):  
Soroush Maghsoudi ◽  
Colin Duffield ◽  
David Wilson

Purpose Although the construction industry is known for its low level of innovation and slow pace of change, some of its characteristics not only make this sector unique but also provide some opportunities to innovate. Innovation evaluation has become one of the priorities for building practitioners. This study aims to develop a practical methodology to evaluate the outcomes of innovation in small building and construction projects. Design/methodology/approach The research used three real case projects and information along with what was found in the literature. A framework was developed based on an extensive literature review of innovation outcomes evaluation. Findings The outcomes of the building projects were categorized into six categories of economic, quality, social, environmental, satisfaction and soft and organizational impacts. It was found that the outcomes of innovative practices in construction projects could be evaluated if subjective assessment is tolerated. The findings of this research are limited to the domestic and medium-density building projects, thus the outcomes might be generalized with appropriate care. The proposed practical framework would assist practitioners in the field of building and construction to realize the impacts of innovation introduced in their projects. The project owners and developers could be the main users of this framework. Originality/value Previously developed models or frameworks have mainly remained at the abstract level that could be used as guidelines, but the proposed framework in this study is practical and applicable to real building projects.


2018 ◽  
Vol 25 (11) ◽  
pp. 1534-1551 ◽  
Author(s):  
Ting-Kwei Wang ◽  
David N. Ford ◽  
Heap-Yih Chong ◽  
Wei Zhang

PurposeDelays during construction are one of the common scenarios in the construction industry. The purpose of this paper is to identify the primary causes of delays in the construction phase of building construction projects in China.Design/methodology/approachQuestionnaire survey approach was adopted across the four typical cities in China, namely, Beijing, Shanghai, Chongqing and Shenzhen. In total, 115 sets of valid responded questionnaires were collected and analyzed.FindingsThe results show that the causes of variations, delays in progress payments, exceptionally low bids and subcontractors’ poor performance and communication issues were the most important causes of delays in China.Originality/valueThis research is the first questionnaire survey on the causes of delays in the construction phase of building construction projects in China. The comparative analysis shows two unique causes of delays in the Chinese construction industry, such as “difficulty in claiming indemnity” and “unreasonable upfront capital demanded by client.” It also reveals different ranked causes of delays as per distinguished political and economic situations in China. The research findings can be referred by construction projects in other countries that are funded or partnered with China.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Lekan Damilola Ojo ◽  
Deji Rufus Ogunsemi ◽  
Olusola Ogunsina

Purpose The Nigerian construction industry is bedeviled with poor project performance and outcomes which value management (VM) could address if applied. The application of VM on Nigerian construction projects is very minimal due to certain obstacles, namely, lack of VM experts, paucity of knowledge on the techniques, etc., which inhibits the adoption into the construction industry. Therefore, this study aims to develop a conceptual framework of the adoption of VM on construction projects in a typical developing economy. Design/methodology/approach This study engaged 15 selected VM experts in two rounds of Delphi survey to develop a conceptual framework of VM adoption. The method of data analysis includes mean score, standard deviation, Kendall’s coefficient of concordance, chi-square (χ2) test, interrater agreement analysis and significant level analysis. The developed conceptual framework was sent to a team of local and international VM experts for validation. Findings This study reveals that the adoption of VM requires the collective effort of relevant stakeholders in the construction industry. The framework developed presents individual and collective activities to be undertaken by the stakeholders. The activities include training, legislation, government-funded research, etc. Thus, the adoption of innovative management methodology like VM requires the collaboration of academics, construction professional bodies and government parastatals. This will assist in the judicious use of limited construction resources and boost the relevance of the Nigerian construction industry among developing nations and in the global construction market. Originality/value This study used the opinions of few construction professionals that can be regarded as VM experts in Nigeria, as against engaging a pool of construction professionals who may not be knowledgeable in VM process. Engaging the few VM experts in the Nigerian construction industry is important to have a valid basis for drawing conclusion, as large questionnaire survey could be possibly filled by inexperienced or unqualified respondents if stringent criteria are not considered at the outset of this study.


2017 ◽  
Vol 24 (5) ◽  
pp. 736-756 ◽  
Author(s):  
Albert P.C. Chan ◽  
Goodenough D. Oppong

Purpose The consideration of external stakeholders has proven to be more critical than internal stakeholders in construction projects. The purpose of this paper is to present the diverse expectations of external stakeholder groups, i.e. governmental authorities, general public, and affected local communities, in construction projects. The practical steps to manage the expectations are also outlined. Design/methodology/approach A three-stage methodology was adopted for the review. The primary terms “stakeholder,” “project participants,” or “project environment” were first searched in four popularly search engines and eight top journals that publish construction research to retrieve publications. After a second-stage filtering process, the selected data were then analyzed and reviewed in line with the objectives. Findings In total, 49 common expectations were identified and classified. The results indicate that each stakeholder group pursues expectations in line with the social, environmental, and economic sustainability objectives. For effective management, project managers (PMs) must know stakeholder opportunities and threats, fulfill social responsibilities, establish common goals, apply appropriate strategies, and enhance stakeholder satisfaction. Research limitations/implications The identified expectations are only based on the selected publications. Even though the expectations have been categorized in line with the triple bottom line model, the relative importance of the expectations cannot be ascertained since there is no empirical support. Practical implications PMs can play safe by acknowledging the stakeholder expectations and employ such strategies to curtail resulting impacts and maximize mutual benefits. The list of expectations could also be used to promote equitable value optimization in projects, enhance needs fulfillment, and facilitate the evaluation of external stakeholder satisfaction. Originality/value This study provides a comprehensive checklist of construction stakeholder expectations which hitherto, is lacked in the literature. Moreover, practical steps to manage the expectations of external stakeholders have been discussed.


2017 ◽  
Vol 15 (6) ◽  
pp. 803-825 ◽  
Author(s):  
Jeffrey Boon Hui Yap ◽  
Anna Lock

Purpose Knowledge management (KM) is the central know how for the construction industry. However, the delivery of construction projects is often plagued by schedule delays and cost overruns due to lack of working knowledge of project personnel. Hence, the need to appraise the practices of knowledge management in the construction industry has become all the more germane. This paper aims to determine the awareness of KM practices in Malaysia-based construction small and medium enterprises, and to investigate the benefits, tools and techniques, and challenges associated with knowledge management implementation so that effective measures can be devised to address them. Design/methodology/approach The research data were gathered using a structured questionnaire survey disseminated in the Klang Valley region in Malaysia. Responses were collected from 107 industry practitioners. The quantitative data are subjected to descriptive statistics, and the ranking with category of significance of the hypothesised variables is determined using the relative importance index (RII) technique. Findings The key benefits of KM practices are predominantly raising efficiency, quality, productivity and decision-making. The most preferred KM techniques are “face-to-face interaction”, “mentoring” and “documents and reports”. The highly significant tools are “groupware” and “telephone”. The major organisational issue hampering the implementation of knowledge management practices is “lack of motivation” while the critical cultural issue is relating to “bureaucracy and hierarchical”, and the vital people issue concerns “lack of trust”. Research limitations/implications The respondents were limited to only small and medium construction enterprises located in the Klang Valley region in Malaysia, which makes generalisation challenging. Practical implications KM provides not only a pragmatic but also a proactive approach to raising the competitive edge and capabilities of a construction company. Identification of the critical attributes of KM provides the basis for project managers in formulating KM strategies to enhance the chances of successful delivery of future projects. Originality/value The study contributes to the debate on the knowledge agenda in the construction industry, particularly from a fast developing economy’s perspective, where an effective KM can further contribute to realising a reasonable level of competitiveness operation.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mohammad Osama ◽  
Aly Sherif ◽  
Mohamed Badawy

Purpose This paper aims to enlighten the importance of the risk management process which is considered as a major procedure to effectively handle the potential inherent risks in the construction industry. However, most traditional risk analysis techniques are based on theories that deal with each risk factor as an independent, which does not take into consideration the causal relationships between risk factors. Design/methodology/approach This study aspires to identify the overall risk of the administrative construction projects in Egypt and to recognize the most influencing risk factors through the project life cycle by using Bayesian belief networks (BBN). Through a review of the literature, 27 risk factors were identified and categorized as the most common risk factors in the construction industry. A structured questionnaire was performed to estimate the probability and severity of these risks. Through site visits and interviews with experts in the construction field, 200 valid questionnaires were collected. A risk analysis model was developed using BBNs, then the applicability of this model was verified using a case study in Egypt. Findings However, the outcome showed that critical risks that manipulate administrative construction projects in Egypt were corruption and bribery, contractor financial difficulties, force majeure, damage to the structure and defective material installation. Practical implications The proposed study presents the possibilities available to the project parties to obtain a better forecast of the project objectives, including the project duration, total project cost and the target quality by examining the causal relationships between project risks and project objectives. Originality/value This study aspires to identify the overall risk of the administrative construction projects in Egypt and to recognize the most influencing risk factors through the project life cycle by using BBNs.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Chipozya Kosta Tembo ◽  
Franco Muleya ◽  
Emmanuellie Phiri

PurposeThis research aimed to investigate the extent to which organisational culture is practised in local and foreign contractors in grade one and two categories and how it affects their performance.Design/methodology/approachThe approach for this research was positivist in nature adopting a mono-method of data collection through a survey using self-administered questionnaires. A total of 138 questionnaires were distributed among public clients and large-scale contractors registered in the stated grades, and 112 questionnaires were returned for analysis representing an overall response rate of 81% for contractors and clients.FindingsFindings revealed that in organisational culture, significant differences were found for management style and dominant characteristics of the organisation between local and foreign contractors. Differences were not found for leadership styles, measures of success and organisational glue. Results suggest that for local contractors to perform better, significant changes are needed to their management style and dominant characteristics of their organisations.Originality/valueForeign contractors in the Zambian construction industry are reportedly outperforming local contractors making them preferred contractors on larger public projects accounting for 85% of construction projects by value of works. This study presents the differences in organisational culture between foreign and local firms. It further demonstrates that organisational culture plays a key role in determining performance of a contracting firm. The study presents areas that local contractors can improve in organisational culture in order to remain competitive.


Author(s):  
Habeeb Kusimo ◽  
Lukumon Oyedele ◽  
Olugbenga Akinade ◽  
Ahmed Oyedele ◽  
Sofiat Abioye ◽  
...  

Purpose The purpose of this paper is to identify challenges faced in resource management in the UK construction industry and to propose some solutions to these problems. Design/methodology/approach Based on a qualitative research methodology, 14 experts from the UK construction industry were chosen to be participants in the study. The participants were equally divided into two focus groups to discuss resource management using five projects as case studies. Thematic analysis of the discussion reveals seven key factors that affect resource management. Findings The results show that most of the problems identified are due to poor data management processes and the practice of having data in silos. Overcoming this challenge requires the adoption of big data approaches for resource management to allow the integration of large and different forms of data. Originality/value This study seeks to bring to the fore challenges faced in resource management by the UK construction industry and to outline some solutions to address them.


2019 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Abdullah Al-Yami ◽  
Muizz O. Sanni-Anibire

Purpose Although there is a boom in the construction industry in the Kingdom of Saudi Arabia (KSA), it is yet to fully adopt building information modeling (BIM), which has received a lot of attention in the US, UK and Australian construction industries. Thus, the purpose of this paper is to provide the current state of the art in BIM implementation in Saudi Arabia, as well as perceived benefits and barriers through a case study. Design/methodology/approach A broad overview of BIM, the construction industry in KSA and the research and implementation of BIM in KSA was presented in this study. The research further established the perceived benefits and barriers of BIM implementation through a case study of a local AEC firm. A questionnaire survey was used to obtain lessons learned from the BIM team of the pilot project and was further analyzed using the RII approach. Findings The study’s findings include the lack of policy initiatives in KSA to enforce BIM in the construction industry, as well as the lack of sufficient research in the domain of BIM in KSA. Furthermore, the case study also revealed that the most important benefit of BIM adoption is “detection of inter-disciplinary conflicts in the drawings to reduce error, maintain design intent, control quality and speed up communication,” whereas the most important barrier is “the need for re-engineering many construction projects for successful transition towards BIM.” Originality/value The study provides a background for enhanced research towards the implementation of BIM in Saudi Arabia and also demonstrates the potential benefits and barriers in BIM implementation.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Aliyeh Kazemi ◽  
Eun-Seok Kim ◽  
Mohammad-Hossein Kazemi

Purpose Successful implementation of construction projects is one of the crucial factors for the economic development of every country. The main part of the countries’ capital is allocated to civil and infrastructure projects annually, most of which are accomplished with delay. Construction projects are often criticized for overrunning time and budgets. Analyzing the factors causing delay is essential for omitting them and timely implementation of these projects. Due to the importance of oil projects, this study aims to investigate and analyze the factors causing a delay in Iran’s oil construction projects. Design/methodology/approach In this research, after a broad literature review, using the fuzzy Delphi method, a total of 75 delay factors were identified under 11 major categories of owner, contractor, consultant, equipment, labor, materials, design, contract and contractual relations, laws and regulations, environmental factors, and managerial factors. Then, by using the best-worst method, the factors were prioritized. Findings The results showed that sanction, governmental management systems, weak project management by the contractor, technical and managerial weaknesses of the consultant, financial problems and delay in payment by the owner, low efficiency of the equipment, low productivity of the workforce, changes in laws and regulations, inappropriate organizational structure linking to the project, changes in the design, and changes in the price of materials are the most crucial factors causing a delay in Iran’s oil construction projects. Research limitations/implications These findings are expected to have significant contributions to Iran’s oil construction industry in controlling the time overruns in construction contracts. Originality/value The main contribution of this study is to develop a comprehensive framework in which, causes of delay in Iran’s oil construction projects are addressed and prioritized.