A Novel Intermittent Gas Lifting and Monitoring System Toward Liquid Unloading for Deviated Wells in Mature Gas Field

2017 ◽  
Vol 140 (5) ◽  
Author(s):  
Zheng Tong ◽  
Guangmin Zhao ◽  
Songbo Wei

For liquid-loading gas wells, effective deliquification operation is needed but current liquid-lifting technology is not able to meet the requirements of high efficiency as well as low cost especially in large-deviated wells. This paper proposes a hybrid deliquification technology combining plunger lift, chemical foamer injection, and down-hole monitoring to unload liquid in deviated gas wells. The system comprised multipart plunger body, deployment-retrieving integrating assembly (DRIA) and operation canisters. By means of flexible plunger body, the system performs deliquification normally in deviated wellbore. The operation canisters are carried with plunger body through tubing onto the bottom of deviated section to operate in terms of four modes: long-term down-hole monitoring, foamer injection, mobile data acquisition, and wireless data exchange with the wellhead. The key components of DRIA and injection valve are made of improved disintegrating alloy with the rating temperature of 100 °C, compressive strength of 370 MPa, and disintegrating rate of 170.9 mg/(cm2 h) characterized by lab test. Field trials were successfully performed in two liquid-loading tight gas wells, and the maximal deviated angle of the wells was 68 deg. It indicates that the new technology is a cost-effective way contributing to automatic production and management of mature gas wells in the remote area instead of traditional rigid plunger and wire-line logging.

2013 ◽  
Vol 868 ◽  
pp. 737-741 ◽  
Author(s):  
Feng Wang ◽  
Ji Nan Zhang ◽  
Chong Xi Li

The phenomenon of hydrate freeze-plugging is very widespread in Jilin oilfield M gas field exploitation. Freeze-plugging tends to occur in winter, mainly including ground pipeline, wellhead and wellbore freeze-plugging, etc, which affects the normal production of gas well, also has restricted the gas reservoir development and will cause huge economic losses. In order to prevent the freeze-plugging occurred in gas well, methyl alcohol is used to inject into single well at the rate of 600 to 3080 L/day. The field condition shows that the result of injecting methanol is not obvious, besides, the toxicity of methanol and its high cost already cannot satisfy the oilfield actual demand. Therefore, we need to research and develop new hydrate inhibitors with low cost and high efficiency to solve the problem of freeze-plugging.


2014 ◽  
Vol 1044-1045 ◽  
pp. 401-405
Author(s):  
Hai Dong Shi

Dynamic reserves are the important basis for determining the reasonable deliverability of gas wells and well spacing density and also the foundation for the overall development plan of a gas field. Therefore, the evaluation of dynamic reserves of gas wells is crucially important to developing gas fields with high efficiency, optimizing well pattern and shortening development period. For this reason, this paper arranges and analyzes systematically a series of calculation methods for dynamic reserves of single gas well, which have arisen in recent years, and identifies the calculation methods for different types of gas reservoirs.


2021 ◽  
Author(s):  
Magdy Farouk Fathalla ◽  
Mariam Ahmed Al Hosani ◽  
Ihab Nabil Mohamed ◽  
Ahmed Mohamed Al Bairaq ◽  
Djamal Kherroubi ◽  
...  

Abstract An onshore gas field contains several gas wells which have low–intermittent production rates. The poor production has been attributed to liquid loading issue in the wellbore. This study will investigate the impact of optimizing the tubing and liner completion design to improve the gas production rates from the wells. Numerous sensitivity runs are carried out with varying tubing and liner dimensions, to identity optimal downhole completions design. The study begins by identifying weak wells having severe gas production problems. Once the weak wells have been identified, wellbore schematics for those wells are studied. Simulation runs are performed with the current downhole completion design and this will be used as the base case. Several completion designs are considered to minimize the effect of liquid loading in the wells; these include reducing the tubing diameter but keeping the existing liner diameter the same, keeping the original tubing diameter the same but only reducing the liner diameter, extending the tubing to the Total Depth (TD) while keeping the original tubing diameter, and extending a reduced diameter tubing string to the TD. The primary cause of the liquid loading seems to be the reduced velocity of the incoming gas from the reservoir as it flows through the wellbore. A simulation study was performed using the various completion designs to optimize the well completion and achieve higher gas velocities in the weak wells. The results of the study showed significant improvement in gas production rates when the tubing diameter and liner diameter were reduced, providing further evidence that increased velocity of the incoming fluids due to restricted flow led to less liquid loading. The paper demonstrates the impact of downhole completion design on the productivity of the gas wells. The study shows that revisiting the existing completion designs and optimizing them using commercial simulators can lead to significant improvement in well production rates. It is also noted that restricting the flow near the sand face increases the velocity of the incoming fluid and reduces liquid loading in the wells.


2021 ◽  
Author(s):  
Danny Hidayat ◽  
Rantoe Marindha ◽  
Triantoro Ade Nugroho ◽  
Reyhan Hidayat ◽  
Runi Kusumaning Rusdi

Abstract Peciko Field currently produces gas from multilayer sand-prone shallow reservoirs. Therefore, it needs sand control method to unlock these marginal reservoirs through low-cost intervention. Hanging screen has been reviewed as an alternative solution to minimize sand control cost while maintaining its robustness to maximize the recovery. This paper will present and evaluate the hanging screen installation and performance from subsurface to surface elements in Peciko field. Hanging screen implementation in Peciko will be evaluated in terms of ease of installation to its performance during production phase. Peciko wells are equipped with real-time monitoring system including Acoustic Sand Detector. Therefore, sand problems could be easily identified. Any indication of screen failure will be confirmed by checking the surface equipment like chokes and intrusive probes. Further intervention to retrieve the screen and perform visual check at surface can be executed to extend the verification. Filter size, placement method, clean-up, and sand sieve result will be gathered to identify the root cause and determine the best method to apply hanging screen as reliable sand control method. Nine installations in 2019 conclude that screen plugging, liquid loading, and combination of both are main issues in production phase. With three plugging cases from well Fx and E2x, it was found that excessive drawdown pressure triggers high gas velocity in perforation tunnel and causing excessive sand production that plugged the screen. These cases also prove that self-unloading by choke movement can lead to plugging if the drawdown pressure and gas rate are not monitored carefully. Commingle production in Ax becomes an issue in lifting performance when reservoir pressure declines and liquid was produced from several reservoirs. Limiting drawdown pressure gives smaller gas rate to lift the liquid and make the well died from liquid loading easily. Massive sand production in well E2x and E2y cause an increase in Top of Sediment (TOS) and lead to inaccessible screen even with multiple bailing attempts. A series of screen design, choke configuration, proper clean-up and continuous monitoring are critical steps to be performed prior and after screen installation to maintain production lifetime. With average stakes of 0.2 Bcf per well, hanging screen has proven to produce 67% of the well reserves in shallow reservoirs. This value creation led to the conclusion that hanging screen is an economically-feasible-sand control method to be implemented in Peciko.


Author(s):  
Xiao Chongyang ◽  
Fu Heng ◽  
Cheng Leli ◽  
Pei Wenyu

AbstractAfter more than 20 years of continuous development, part of the wells in the Moxilei-1 gas reservoir located at the Sichuan Basin have entered the middle–later production stage. With the continuous decline in formation pressure and production rates, some of the gas wells have entered the potential period of liquid loading, while some have already suffered water plugging. Currently, the field engineers usually carry out some corresponding drainage measures after the occurrence of liquid loading in the gas well, which will first affect the production progress of the gas field, then increase the difficulty in drainage and reduce the drainage effect afterward. On the basis of Pan’s model for evaluating critical liquid-carrying flow rate, the influence of liquid drop rotation was considered in the new model. Further, combined with the Arps production decline equation, a prediction model of liquid loading timing was deduced. Taking a typical well in the Moxilei-1 gas reservoir as an example, based on the early-stage production data of the gas well, the model was used to predict the liquid loading timing accurately. The model can predict the possibility and timing of liquid loading in gas wells at different production stages. It can check the gas wells with potential liquid loading, so as to reduce the workload for field workers. Furthermore, it can predict the potential liquid accumulation and its timing in advance, so as to guide the field workers to prepare for drainage in advance.


Author(s):  
K.M. Hones ◽  
P. Sheldon ◽  
B.G. Yacobi ◽  
A. Mason

There is increasing interest in growing epitaxial GaAs on Si substrates. Such a device structure would allow low-cost substrates to be used for high-efficiency cascade- junction solar cells. However, high-defect densities may result from the large lattice mismatch (∼4%) between the GaAs epilayer and the silicon substrate. These defects can act as nonradiative recombination centers that can degrade the optical and electrical properties of the epitaxially grown GaAs. For this reason, it is important to optimize epilayer growth conditions in order to minimize resulting dislocation densities. The purpose of this paper is to provide an indication of the quality of the epitaxially grown GaAs layers by using transmission electron microscopy (TEM) to examine dislocation type and density as a function of various growth conditions. In this study an intermediate Ge layer was used to avoid nucleation difficulties observed for GaAs growth directly on Si substrates. GaAs/Ge epilayers were grown by molecular beam epitaxy (MBE) on Si substrates in a manner similar to that described previously.


2019 ◽  
Author(s):  
Charlys Bezerra ◽  
Géssica Santos ◽  
Marilia Pupo ◽  
Maria Gomes ◽  
Ronaldo Silva ◽  
...  

<p>Electrochemical oxidation processes are promising solutions for wastewater treatment due to their high efficiency, easy control and versatility. Mixed metal oxides (MMO) anodes are particularly attractive due to their low cost and specific catalytic properties. Here, we propose an innovative thermal decomposition methodology using <a>polyvinyl alcohol (PVA)</a> as a solvent to prepare Ti/RuO<sub>2</sub>–IrO<sub>2</sub> anodes. Comparative anodes were prepared by conventional method employing a polymeric precursor solvent (Pechini method). The calcination temperatures studied were 300, 400 and 500 °C. The physical characterisation of all materials was performed by X-ray diffraction and scanning electron microscopy coupled with energy dispersive spectroscopy, while electrochemical characterisation was done by cyclic voltammetry, accelerated service lifetime and electrochemical impedance spectroscopy. Both RuO<sub>2</sub> and IrO<sub>2</sub> have rutile-type structures for all anodes. Rougher and more compact surfaces are formed for the anodes prepared using PVA. Amongst temperatures studied, 300 °C using PVA as solvent is the most suitable one to produce anodes with expressive increase in voltammetric charge (250%) and accelerated service lifetime (4.3 times longer) besides reducing charge-transfer resistance (8 times lower). Moreover, the electrocatalytic activity of the anodes synthesised with PVA toward the Reactive Blue 21 dye removal in chloride medium (100 % in 30 min) is higher than that prepared by Pechini method (60 min). Additionally, the removal total organic carbon point out improved mineralisation potential of PVA anodes. Finally, this study reports a novel methodology using PVA as solvent to synthesise Ti/RuO<sub>2</sub>–IrO<sub>2</sub> anodes with improved properties that can be further extended to synthesise other MMO compositions.</p>


Author(s):  
Zhengwang Xu ◽  
Wei Mei ◽  
Jiaqi Yu ◽  
Jiarui Zhang ◽  
Yuchun Yi ◽  
...  

As being restricted by factors such as cost, efficiency and size, the development of high-power solar LED street light controller is faced with plenty of difficulties. In case that a structure of two independent DC/DC is applied as the main circuit, it has to face problems such as large size and high cost; in case of applying the bidirectional BUCK/BOOST circuit, it requires change-over switches to control the solar panel and LED light. As being restricted by withstanding voltage, on-resistance and cost, a PMOS device cannot be used as the change-over switch of solar panel and LED light. However, when being used as a change-over switch, an NMOS device must apply the low-side mode under which the negative ends of the mentioned three parts are cut off. In the condition of applying the low-side mode, a differential circuit must be used to detect the voltage of the solar panel. Furthermore, in order to make sure batteries can still be regularly charged after wearing out in daylight, the controller must be supplied with power through a dual power supply circuit that can obtain power from both the solar panel and the battery. The demander has a requirement on extremely low standby power consumption of the product, and thus it is necessary to minimize the circuit that is live while working in standby mode. Methods: The bidirectional BUCK/BOOST circuit structure is applied to the main circuit to realize a higher change-over efficiency while giving considerations to both cost and size. The NMOS device, model IRFB4410ZPBF, with a price of about three yuan, is used as the switching device, and the low-side mode is applied, that is the switches inserted in between negative end of the solar panel or LED light and that of the DC/DC circuit. The low-cost rail-to-rail operational amplifier LM358 is used to form a differential amplification circuit for detecting the voltage of the solar panel. A XL1509-12E1 chip that only costs 0.88 yuan/pc is selected as the main change-over chip for the power supply, which has realized the highly-efficient and low-cost change-over of the power supply. A dual power supply circuit and a step-down protective circuit are designed for the XL1509-12E1 change-over chip. By comparing solar panel voltage with battery voltage, the solar panel booting circuit is realized. Only when solar panel voltage is higher than battery voltage, does the system program start to power it up for running, so that the outage of most of the circuits of the system under standby mode does not consume energy. Furthermore, the solar panel voltage detecting circuit, the solar panel booting circuit and several return difference functions are corrected during system debugging. Results: The circuit board of the entire controller features small size, low cost and high efficiency. It measures about 100*62*18mm in size, costs about 60 yuan, and the charge/discharge change-over efficiency reaches up to over 95%. The controller has many functions: it is capable of operating within a large scope, in which, solar panel voltage is subject to 15~50V, LED light voltage is subject to 15~60V, battery voltage is subject to 10~35V and battery-end charge/discharge current is 10A; it is capable of adapting to monocrystalline silicon/multicrystalline silicon/thin-film and many other kinds of solar panels, as well as lithium/lead-acid and many other kinds of batteries; it is capable of detecting the conversion of day and night, automatically controlling charging and discharging and automatically making adaptive adjustment according to seasonal variations; the current to be consumed during standby will be maintained below 3mA, and thus the power consumption is extremely low. Conclusion: By selecting the bidirectional BUCK/BOOST circuit structure, applying low-side mode for switching of solar panel and LED light, using a differential circuit to detect solar panel voltage, using a low-cost DC/DC chip to realize power supply change-over, designing a dual power supply circuit, introducing solar panel booting circuit and other hardware design, as well as MPPT algorithm, state recognition and control, return difference control and other software design, a solar LED street light control product featuring small size, low cost, high efficiency and multiple functions is successfully developed.


Sign in / Sign up

Export Citation Format

Share Document