Design of a High Efficiency Combined Cycle Electric Power Plant for Low Btu Coal-Gas

1978 ◽  
Author(s):  
J. M. Mogul ◽  
R. W. Cole ◽  
G. B. Manning

A key to achieving efficient, environmentally acceptable electric power from combustion of low Btu coal gas is through an advanced design, combined gas turbine-steam turbine cycle system, integrated with a low Btu gasifier. A conceptual design of a commercial size plant of this concept is presented. It consists of a modularized system built around commercially available, pressurized fixed-bed gasifiers, hot-fuel gas cleanup and desulfurization, an advanced 3000 F (1649 C) heavy-duty gas turbine, and a conventional steam system. The turbine subsystem, with extensive test background on petroleum fuels, utilizes transpiration-air-cooling to maintain moderate metal temperatures and to protect the components from the aggressive environment. Emphasis in the design of the power plant is placed on earliest possible commercialization.

Author(s):  
Mihir Acharya ◽  
Lalatendu Pattanayak ◽  
Hemant Gajjar ◽  
Frank Elbracht ◽  
Sandeep Asthana

With gas becoming a fuel of choice for clean energy, Liquefied Natural Gas (LNG) is being transported and re-gasification terminals are being set up at several locations. Re-gasification of LNG leads to availability of considerable cold-energy which can be utilized to gain power and efficiency in a Gas Turbine (GT) based Power Plant. With a number of LNG Re-gasification Terminals coming up in India & around the globe, setting up of a high efficiency CCPP adjacent to the terminal considering utilization of the cold energy to augment its performance, and also save energy towards re-gasification of LNG, provides a feasible business opportunity. Thermodynamic analysis and major applications of the LNG re-gasification cold energy in Gas Turbine based power generation cycle, are discussed in this paper. The feasibility of cooling GT inlet air by virtue of the cold energy of Liquefied LNG to increase power output of a Combined Cycle Power Plant (CCPP) for different ambient conditions is analyzed and also the effect on efficiency is discussed. The use of cold energy in condenser cooling water circulating system to improve efficiency of the CCPP is also analyzed. Air cooling capacity and power augmentation for a combined cycle power plant based on the advanced class industrial heavy duty gas turbine are demonstrated as a function of the ambient temperature and humidity. The economic feasibility of utilizing the cold energy is also deliberated.


Author(s):  
M. W. Horner ◽  
R. K. Alff ◽  
J. C. Corman

Simplified integrated gasification combined cycle (IGCC) power plants offer attractive advantages for improving the performance of coal to electricity systems. This plant configuration, which utilizes a coal gasifier, hot gas cleanup system, and gas turbine combined cycle, has the potential to reduce both capital costs for equipment and fuel costs through improved efficiency. This paper reports the results of fuel supply and gas turbine testing on actual hot low-Btu coal gas. A pilot-scale advanced fixed-bed gasifier has been modified to supply hot coal gas to a particulate removal cyclone and then to a gas turbine simulator. The hot gas is combusted in a General Electric MS6000 combustor developed for low-Btu gas fuel. The combusted product flows through a MS6000 turbine first-stage nozzle sector. The exhaust gases from the nozzle sector pass over air-cooled cylindrical ash deposition pin specimens and then into a water quench exhaust system. Extensive instrumentation and sampling provisions are utilized to characterize the fuel gas, the combustion gases, and the ash deposits formed on turbine components. Two regimes of nozzle metal surface temperatures have been investigated by separate testing performed including 500–600 °F with water-cooled and 1500–1650 °F with air-cooled nozzle sectors. Results from the test program have provided key data related to fuel gas cleanup and the tolerance of gas turbine hot gas path parts to the products of combustion from coal-derived fuels.


1980 ◽  
Author(s):  
J. Jermanok ◽  
R. E. Keith ◽  
E. F. Backhaus

A new 37-MW, single-shaft gas turbine power plant has been designed for electric power generation, for use in either simple-cycle or combined-cycle applications. This paper describes the design features, instrumentation, installation, test, and initial operation.


Author(s):  
R. Chacartegui ◽  
D. Sa´nchez ◽  
F. Jime´nez-Espadafor ◽  
A. Mun˜oz ◽  
T. Sa´nchez

The development of high efficiency solar power plants based on gas turbine technology presents two problems, both of them directly associated with the solar power plant receiver design and the power plant size: lower turbine intake temperature and higher pressure drops in heat exchangers than in a conventional gas turbine. To partially solve these problems, different configurations of combined cycles composed of a closed cycle carbon dioxide gas turbine as topping cycle have been analyzed. The main advantage of the Brayton carbon dioxide cycle is its high net shaft work to expansion work ratio, in the range of 0.7–0.85 at supercritical compressor intake pressures, which is very close to that of the Rankine cycle. This feature will reduce the negative effects of pressure drops and will be also very interesting for cycles with moderate turbine inlet temperature (800–1000 K). Intercooling and reheat options are also considered. Furthermore, different working fluids have been analyzed for the bottoming cycle, seeking the best performance of the combined cycle in the ranges of temperatures considered.


2010 ◽  
Vol 132 (12) ◽  
pp. 57-57
Author(s):  
Lee S. Langston

This article presents an overview of gas turbine combined cycle (CCGT) power plants. Modern CCGT power plants are producing electric power as high as half a gigawatt with thermal efficiencies approaching the 60% mark. In a CCGT power plant, the gas turbine is the key player, driving an electrical generator. Heat from the hot gas turbine exhaust is recovered in a heat recovery steam generator, to generate steam, which drives a steam turbine to generate more electrical power. Thus, it is a combined power plant burning one unit of fuel to supply two sources of electrical power. Most of these CCGT plants burn natural gas, which has the lowest carbon content of any other hydrocarbon fuel. Their near 60% thermal efficiencies lower fuel costs by almost half compared to other gas-fired power plants. Their installed capital cost is the lowest in the electric power industry. Moreover, environmental permits, necessary for new plant construction, are much easier to obtain for CCGT power plants.


Author(s):  
John T. Langaker ◽  
Christopher Hamker ◽  
Ralph Wyndrum

Large natural gas fired combined cycle electric power plants, while being an increasingly efficient and cost effective technology, are traditionally large consumers of water resources, while also discharging cooling tower blowdown at a similar rate. Water use is mostly attributed to the heat rejection needs of the gas turbine generator, the steam turbine generator, and the steam cycle condenser. Cooling with air, i.e. dry cooling, instead of water can virtually eliminate the environmental impact associated with water usage. Commissioned in the fall of 2010 with this in mind, the Halton Hills Generating Station located in the Greater Toronto West Area, Ontario, Canada, is a nominally-rated 700 Megawatt combined cycle electric generating station that is 100 percent cooled using various air-cooled heat exchangers. The resulting water consumption and wastewater discharge of this power plant is significantly less than comparably sized electric generating plants that derive cooling from wet methods (i.e, evaporative cooling towers). To incorporate dry cooling into such a power plant, it is necessary to consider several factors that play important roles both during plant design as well as construction and commissioning of the plant equipment, including the dry cooling systems. From the beginning a power plant general arrangement and space must account for dry cooling’s increase plot area requirements; constraints therein may render air cooling an impossible solution. Second, air cooling dictates specific parameters of major and auxiliary equipment operation that must be understood and coordinated upon purchase of such equipment. Until recently traditional wet cooling has driven standard designs, which now, in light of dry cooling’s increase in use, must be re-evaluated in full prior to purchase. Lastly, the construction and commissioning of air-cooling plant equipment is a significant effort which demands good planning and execution.


Author(s):  
Stéphanie Hoffmann ◽  
Michael Bartlett ◽  
Matthias Finkenrath ◽  
Andrei Evulet ◽  
Tord Peter Ursin

This paper presents the results of an evaluation of advanced combined cycle gas turbine plants with precombustion capture of CO2 from natural gas. In particular, the designs are carried out with the objectives of high efficiency, low capital cost, and low emissions of carbon dioxide to the atmosphere. The novel cycles introduced in this paper are comprised of a high-pressure syngas generation island, in which an air-blown partial oxidation reformer is used to generate syngas from natural gas, and a power island, in which a CO2-lean syngas is burnt in a large frame machine. In order to reduce the efficiency penalty of natural gas reforming, a significant effort is spent evaluating and optimizing alternatives to recover the heat released during the process. CO2 is removed from the shifted syngas using either CO2 absorbing solvents or a CO2 membrane. CO2 separation membranes, in particular, have the potential for considerable cost or energy savings compared with conventional solvent-based separation and benefit from the high-pressure level of the syngas generation island. A feasibility analysis and a cycle performance evaluation are carried out for large frame gas turbines such as the 9FB. Both short-term and long-term solutions have been investigated. An analysis of the cost of CO2 avoided is presented, including an evaluation of the cost of modifying the combined cycle due to CO2 separation. The paper describes a power plant reaching the performance targets of 50% net cycle efficiency and 80% CO2 capture, as well as the cost target of 30$ per ton of CO2 avoided (2006 Q1 basis). This paper indicates a development path to this power plant that minimizes technical risks by incremental implementation of new technology.


Author(s):  
Colin F. McDonald

With the capability of burning a variety of fossil fuels, giving high thermal efficiency, and operating with low emissions, the gas turbine is becoming a major prime-mover for a wide spectrum of applications. Almost three decades ago two experimental projects were undertaken in which gas turbines were actually operated with heat from nuclear reactors. In retrospect, these systems were ahead of their time in terms of technology readiness, and prospects of the practical coupling of a gas turbine with a nuclear heat source towards the realization of a high efficiency, pollutant free, dry-cooled power plant has remained a long-term goal, which has been periodically studied in the last twenty years. Technology advancements in both high temperature gas-cooled reactors, and gas turbines now make the concept of a nuclear gas turbine plant realizable. Two possible plant concepts are highlighted in this paper, (1) a direct cycle system involving the integration of a closed-cycle helium gas turbine with a modular high temperature gas cooled reactor (MHTGR), and (2) the utilization of a conventional and proven combined cycle gas turbine, again with the MHTGR, but now involving the use of secondary (helium) and tertiary (air) loops. The open cycle system is more equipment intensive and places demanding requirements on the very high temperature heat exchangers, but has the merit of being able to utilize a conventional combined cycle turbo-generator set. In this paper both power plant concepts are put into perspective in terms of categorizing the most suitable applications, highlighting their major features and characteristics, and identifying the technology requirements. The author would like to dedicate this paper to the late Professor Karl Bammert who actively supported deployment of the closed-cycle gas turbine for several decades with a variety of heat sources including fossil, solar, and nuclear systems.


Author(s):  
M. W. Horner ◽  
J. C. Corman

Integrated gasification combined cycle (IGCC) power plants offer the opportunity to burn coal in an environmentally sound manner at a competitive cost of output energy. Advanced simplified IGCC systems have been identified which offer reduced fuel system capital costs and complexity as well as improved thermal efficiency of coal to fuel conversion. These systems, however, must utilize hot gas cleanup devices to remove particulates, alkali metals, and sulfur to permit utilization of the product fuel gas in a gas turbine. Technology and component development are underway to prepare the hot fuel gas cleanup and gas turbine systems for subsequent integration and verification testing at pilot scale. An experimental testing program is underway to address fuel system and gas turbine components technology for a simplified IGCC configuration. Gas turbine nozzle sectors have been adapted for installation in a turbine simulator for development testing. A low-Btu gas combustor installed upstream of the nozzle sectors is utilized to burn a hot coal gas. Modifications have been made to an existing pilot scale coal gasifier to deliver 1000°F low-Btu coal gas to the gas turbine combustor after partial cleanup by a hot cyclone to remove particulate matter carried over from the coal gasifier. The results from this experimental program will resolve technical issues related to corrosion, deposition and erosion phenomena related to fuel quality, turbine inlet temperature, and nozzle metal surface temperature.


Sign in / Sign up

Export Citation Format

Share Document