Co-Utilization of Biomass and Natural Gas in an Existing Powerplant Through Primary Steam Reforming of Natural Gas

Author(s):  
Frank Delattin ◽  
Svend Bram ◽  
Jacques De Ruyck

Power production from biomass can occur through external combustion (e.g. steam cycles, Organic Rankine Cycles, Stirling engines), or internal combustion after gasification or pyrolysis (e.g. gas engines, IGCC). External combustion has the disadvantage of delivering limited conversion efficiencies (max 35%). Internal combustion has the potential of high efficiencies, but it always needs a severe and mostly problematic gas cleaning. The present article proposes an alternative route where advantages of external firing are combined with potential high efficiency of combined cycles through co-utilization of natural gas and biomass. Biomass is burned to provide heat for partial reforming of the natural gas feed. In this way, biomass energy is converted into chemical energy contained in the produced syngas. Waste heat from the reformer and from the biomass combustor is recovered through a waste heat recovery system. It has been shown in previous papers that in this way biomass can replace up to 5% of the natural gas in steam injected gas turbines and combined cycles, whilst maintaining high efficiencies [1,2]. The present paper proposes the application of this technique as retrofit of an existing combined cycle power plant (Drogenbos, Belgium) where 1% of the natural gas input would be replaced by wood pellets. This represents an installed biomass capacity of 5 MWth from biomass which could serve as a small scale demonstration. The existing plant cycle is first simulated and validated. The simulated cycle is next adapted to partially run on biomass and a retrofit power plant cycle layout is proposed.

Author(s):  
Sergio Mario Camporeale ◽  
Bernardo Fortunato ◽  
Antonio Marco Pantaleo ◽  
Domenico Sciacovelli

In Mediterranean regions, such as Puglia in Italy, the supply chain constraints (i.e. local biomass availability, logistics of supply, storage and seasonality issues) limit the optimal size of a biomass fired power plant in a range of 5–15 MWe. In this scenario, innovative Dual Combustion Externally Fired Gas Turbine (DCGT) Power Plants cofired by natural gas and biomass are examined. For this purpose, biomass external firing is explored under two alternatives: direct combustion of solid biomass and atmospheric fixed bed biomass gasification with air. The proposed cycles are analyzed considering both the Net Overall Electric Efficiency and the Marginal Efficiency of biomass energy conversion, defined for the cofiring of biomass and natural gas. Since natural gas represents a quite expensive fossil fuel resource, a Marginal Efficiency higher than zero indicates the convenience to burn natural gas in this typology of power plant rather than in traditional Combined Cycle with higher efficiency. The energy analysis has been carried out by varying pressure ratio, turbine inlet temperature, heat exchanger efficiency and considering the further option of steam injection. The results of the thermodynamic assessment highlight that the gasification should be preferred to the direct combustion of biomass because of the higher marginal efficiency, although the net overall electric efficiencies of the two plants are almost the same (31%).


Author(s):  
Miroslav P. Petrov ◽  
Thomas Stenhede ◽  
Andrew R. Martin ◽  
Laszlo Hunyadi

Hybrid dual-fuel combined cycle power plants employ two or more different fuels (one of which is typically a solid fuel), utilized by two or more different prime movers with a thermal coupling in between. Major thermodynamic and economic advantages of hybrid combined cycle configurations have been pointed out by various authors in previous studies. The present investigation considers the performance of natural gas and biomass hybrid combined cycles in small scale, with an internal combustion engine as topping cycle and a steam boiler/turbine as bottoming cycle. A parametric analysis evaluates the impact of natural gas to biomass fuel energy ratio on the electrical efficiency of various hybrid configurations. Results show that significant performance improvements with standard technology can be achieved by these hybrid configurations when compared to the reference (two independent, single-fuel power plants at the relevant scales). Electrical efficiency of natural gas energy conversion can reach up to 57–58% LHV, while the efficiency attributed to the bottoming fuel rises with up to 4 percentage points. In contrast to hybrid cycles with gas turbines as topping cycle, hybrid configurations with internal combustion engines show remarkably similar performance independent of type of configuration, at low shares of natural gas fuel input.


Author(s):  
Stéphanie Hoffmann ◽  
Michael Bartlett ◽  
Matthias Finkenrath ◽  
Andrei Evulet ◽  
Tord Peter Ursin

This paper presents the results of an evaluation of advanced combined cycle gas turbine plants with precombustion capture of CO2 from natural gas. In particular, the designs are carried out with the objectives of high efficiency, low capital cost, and low emissions of carbon dioxide to the atmosphere. The novel cycles introduced in this paper are comprised of a high-pressure syngas generation island, in which an air-blown partial oxidation reformer is used to generate syngas from natural gas, and a power island, in which a CO2-lean syngas is burnt in a large frame machine. In order to reduce the efficiency penalty of natural gas reforming, a significant effort is spent evaluating and optimizing alternatives to recover the heat released during the process. CO2 is removed from the shifted syngas using either CO2 absorbing solvents or a CO2 membrane. CO2 separation membranes, in particular, have the potential for considerable cost or energy savings compared with conventional solvent-based separation and benefit from the high-pressure level of the syngas generation island. A feasibility analysis and a cycle performance evaluation are carried out for large frame gas turbines such as the 9FB. Both short-term and long-term solutions have been investigated. An analysis of the cost of CO2 avoided is presented, including an evaluation of the cost of modifying the combined cycle due to CO2 separation. The paper describes a power plant reaching the performance targets of 50% net cycle efficiency and 80% CO2 capture, as well as the cost target of 30$ per ton of CO2 avoided (2006 Q1 basis). This paper indicates a development path to this power plant that minimizes technical risks by incremental implementation of new technology.


Author(s):  
J. O. Stephens

The purpose of this paper is to analyze the technical features of two different arrangements of supplying fresh air to the boilers in fully fired combined cycles for continuous boiler operation using a forced draft fan when the gas turbine is out of service. The first case is the conventional stand-by forced draft fan and the second is the supercharged fan arrangement. Two methods of separating the cycles are reviewed in detail: a) Cold start-up of system. b) While operating in the combined cycle mode, the gas turbine trips. c) While operating the boiler with fresh air firing the gas turbine is started for combined cycle operation. d) Normal shut down of the gas turbine. e) While operating in the combined cycle mode, the boiler trips. This paper presents the results of a study of a 350-MW combined cycle power plant for Alsands Energy Ltd., of Calgary, Alberta, Canada.


Author(s):  
Ste´phanie Hoffmann ◽  
Michael Bartlett ◽  
Matthias Finkenrath ◽  
Andrei Evulet ◽  
Tord Peter Ursin

This paper presents the results of an evaluation of advanced combined cycle gas turbine plants with pre-combustion capture of CO2 from natural gas. In particular, the designs are carried out with the objectives of high efficiency, low capital cost and low emissions of carbon dioxide to the atmosphere. The novel cycles introduced in this paper are comprised of a high-pressure syngas generation island, in which an air-blown POX reformer is used to generate syngas from natural gas, and a power island, in which a CO2-lean syngas is burnt in a large frame machine. In order to reduce the efficiency penalty of natural gas reforming, a significant effort is spent evaluating and optimizing alternatives to recover the heat released during the process. CO2 is removed from the shifted syngas using either CO2 absorbing solvents or a CO2 membrane. CO2 separation membranes, in particular, have the potential for considerable cost or energy savings compared to conventional solvent-based separation and benefit from the high pressure level of the syngas generation island. A feasibility analysis and a cycle performance evaluation are carried out for large frame gas turbines such as the 9FB. Both short term and long term solutions have been investigated. An analysis of the cost of CO2 avoided is presented, including an evaluation of the cost of modifying the combined cycle due to CO2 separation. The paper describes a power plant reaching the performance targets of 50% net cycle efficiency and 80% CO2 capture, as well as the cost target of 30$ per ton of CO2 avoided. This paper indicates a development path to this power plant that minimizes technical risks by incremental implementation of new technology.


2005 ◽  
Vol 4 (1) ◽  
pp. 83
Author(s):  
J. F. Mitre ◽  
A. I. Lacerda ◽  
R. F. De Lacerda

The impact any power plant has upon the environment must be minimized as much as possible. Due to its high efficiency, low emission levels and low cooling requirements, combined cycle plants are considered to be environmentally friendly. This study evaluates the effect of operational conditions on pollutants (CO, CO2, SOx, NOx) emissions levels, waste-heat and wastewater of a combined-cycle natural gas and steam power plant. The HYSYS process simulation was used for modelling and simulation. The study clearly shows that the absolute quantity of pollutants emitted is high. Also, it was possible to verify that the unit operate in the condition of minimal emissions regarding the maximum possible, and thus a reduction or elimination of such pollutants is not possible.


Author(s):  
Hsiao-Wei D. Chiang ◽  
Pai-Yi Wang ◽  
Hsin-Lung Li

With increasing demand for power and with shortages envisioned especially during the peak load times during the summer, there is a need to boost gas turbine power. In Taiwan, most of gas turbines operate with combined cycle for base load. Only a small portion of gas turbines operates with simple cycle for peak load. To prevent the electric shortage due to derating of power plants in hot days, the power augmentation strategies for combined cycles need to be studied in advance. As a solution, our objective is to add an overspray inlet fogging system into an existing gas turbine-based combined cycle power plant (CCPP) to study the effects. Simulation runs were made for adding an overspray inlet fogging system to the CCPP under various ambient conditions. The overspray percentage effects on the CCPP thermodynamic performance are also included in this paper. Results demonstrated that the CCPP net power augmentation depends on the percentage of overspray under site average ambient conditions. This paper also included CCPP performance parametric studies in order to propose overspray inlet fogging guidelines for combined cycle power augmentation.


Author(s):  
P. Shukla ◽  
M. Izadi ◽  
P. Marzocca ◽  
D. K. Aidun

The objective of this paper is to evaluate methods to increase the efficiency of a gas turbine power plant. Advanced intercooled gas turbine power plants are quite efficient, efficiency reaching about 47%. The efficiency could be further increased by recovering wasted heat. The system under consideration includes an intercooled gas turbine. The heat is being wasted in the intercooler and a temperature drop happens at the exhaust. For the current system it will be shown that combining the gas cycle with steam cycle and removing the intercooler will increase the efficiency of the combined cycle power plant up to 60%. In combined cycles the efficiency depends greatly on the exhaust temperature of the gas turbine and the higher gas temperature leads to the higher efficiency of the steam cycle. The analysis shows that the latest gas turbines with the intercooler can be employed more efficiently in a combined cycle power application if the intercooler is removed from the system.


Author(s):  
Nikolett Sipöcz ◽  
Klas Jonshagen ◽  
Mohsen Assadi ◽  
Magnus Genrup

The European electric power industry has undergone considerable changes over the past two decades as a result of more stringent laws concerning environmental protection along with the deregulation and liberalization of the electric power market. However, the pressure to deliver solutions in regard to the issue of climate change has increased dramatically in the last few years and has given rise to the possibility that future natural gas-fired combined cycle (NGCC) plants will also be subject to CO2 capture requirements. At the same time, the interest in combined cycles with their high efficiency, low capital costs, and complexity has grown as a consequence of addressing new challenges posed by the need to operate according to market demand in order to be economically viable. Considering that these challenges will also be imposed on new natural gas-fired power plants in the foreseeable future, this study presents a new process concept for natural gas combined cycle power plants with CO2 capture. The simulation tool IPSEpro is used to model a 400 MW single-pressure NGCC with post-combustion CO2 capture using an amine-based absorption process with monoethanolamine. To improve the costs of capture, the gas turbine GE 109FB is utilizing exhaust gas recirculation, thereby, increasing the CO2 content in the gas turbine working fluid to almost double that of conventional operating gas turbines. In addition, the concept advantageously uses approximately 20% less steam for solvent regeneration by utilizing preheated water extracted from heat recovery steam generator. The further recovery of heat from exhaust gases for water preheating by use of an increased economizer flow results in an outlet stack temperature comparable to those achieved in combined cycle plants with multiple-pressure levels. As a result, overall power plant efficiency as high as that achieved for a triple-pressure reheated NGCC with corresponding CO2 removal facility is attained. The concept, thus, provides a more cost-efficient option to triple-pressure combined cycles since the number of heat exchangers, boilers, etc., is reduced considerably.


2021 ◽  
Vol 312 ◽  
pp. 08019
Author(s):  
Pietro Bartocci ◽  
Alberto Abad ◽  
Arturo Cabello ◽  
Mauro Zampilli ◽  
Giulio Buia ◽  
...  

The Power Sector is undergoing a rapid technological change with respect to implementation of low carbon technologies. The IEA Energy Outlook 2017 shows that the investments in Renewables for the first time are equal to those on the fossil sources. It is likely that the conventional gas turbines and internal combustion engines will need to be integrated in systems employing biofuels and/or CCUS (Carbon Capture Usage and Storage). Also, the European Union is moving rapidly towards low carbon technologies (i.e. Energy Efficiency, Smart Grids, Renewables and CCUS), see the Energy Union Strategy. Currently 28% of the installed power capacity in Europe is based on natural gas plants. Gas-based power capacity has reached 418 GW in 2016 and is likely to continue to grow in the future. To efficiently capture the carbon dioxide emissions generated by the combustion of natural gas in the combustion chamber a possible solution could be to adopt new combustion processes, like Chemical Looping Combustion. The combination of CLC and GTs can decrease the efficiency of a combined cycle power plant from 60% to about 40.34%. These performances influence costs and environmental burdens and this is also the same for oxyfuel combustion, which is a competing technology to realize CCS. This paper, starting from literature mass and energy balances of a conventional combined cycle, a combined cycle coupled with chemical looping combustor and a combined cycle coupled with oxyfuel combustion, calculates the reduction of CO2 emissions which can be achieved during the whole life cycle of the power plant and then identifies the value of the carbon credit which is needed to have an interesting payback period for such kind of investment.