PLANNING SYSTEM DEVELOPMENT OF LOADING PARKING SPACES IN THE CITY

Author(s):  
Ушкова ◽  
T. Ushkova ◽  
Иванова ◽  
E. Ivanova ◽  
Макарова ◽  
...  

Currently, there are a number of problems of transport network in the city related to the implementation of illegal parking. The article analyzes problems and proposes the following solution - planning system development of loading parking spaces in the city. This system will reduce the burden on the road network of the city and helps drivers to optimize the process of finding available parking spaces.

2019 ◽  
Vol 16 (3) ◽  
pp. 264-275 ◽  
Author(s):  
I. M. Ryabovbov ◽  
R. Ya. Kashmanov

Introduction. The authors propose to use a rational distribution of buses, taking into account their passenger capacity and the hours of the day, in order to optimize the operation of the rolling stock (RS) on the route. The usage of RS low-capacity on routes with significant passenger traffic increases the RS need, the load on the transport network and emissions of harmful substances into the atmosphere. Operation of high-capacity buses on routes with low power passenger traffic leads to the large intervals of movement and to the increase of waiting time for passengers. The authors highlight that on the number and type of buses’ determining it is necessary to take into account the city specifics (on the example of Volgograd), such as the presence of only two main streets with three lanes in each direction, adjacent roads through which the routes pass, one lane direction.The length of the city along the Volga river in total is about 90 km, due to the peculiarities of the road network (RN) of the city, any irrational use of the RS leads to a significant load on the road network, and, as a result, to the congestion on the roads. Nowadays the PS is not operated effectively.On most routes of the city the capacity of RS does not correspond to passenger traffic on the route. Possible way to optimize the use of RS is taking into account the daily load on the road network.Materials and methods. The authors studied the technology of the movement organization of the rolling stock on the № 59 route. In order to optimize the transportation process, the authors used the method of determining the buses’ number by hour of the day on the base of the graph-analytical method. Buses of different capacity were used on this route.Results. The resulting distribution of buses made it possible to combine the interests of carriers and passengers, to increase the efficiency of rolling stock and to reduce the load on the road network.Discussion and conclusions. As a result, the authors present the measures for improving the efficiency of the rolling stock. These measures are the main for improving transport services for population.


2021 ◽  
Vol 13 (2) ◽  
pp. 2-13
Author(s):  
Attila M. Nagy ◽  
Bernát Wiandt ◽  
Vilmos Simon

One of the major problems of traffic in big cities today is the occurrence of congestion phenomena on the road network, which has several serious effects not only on the lives of drivers, but also on city inhabitants. In order to deal with these phenomena, it is essential to have an in-depth understanding of the processes that lead to the occurrence of congestion and its spilling over into contiguous areas of the city.


2014 ◽  
Vol 3 (1) ◽  
pp. 23-34
Author(s):  
Marios D. Miltiadou ◽  
Efstathios Bouhouras

Abstract Thessaloniki is the second largest city in Greece and its transportation system (development and operation) is hampered by the city’s geographical position and surrounding relief. Specifically, the city has been developed and expanded through the years along the coastline, the sea boundary on the southwest, and a second physical boundary, a forest, on the east side. The Thessaloniki Ring Road (divided in western and eastern part) was constructed in the early ‘90s, in order to relief the road network of the city centre from the transit traffic and confront the gradually increasing congestion. The absence of alternatives other than road transport and the increase of car ownership over the years led to an increase of motorized traffic. So even that this Ring Road had been designed to serve 30,000 vehicles daily it became to serve more than triple traffic just before the impacts of the economic crisis on transport and mobility have been made visible. The Western Internal Ring Road of Thessaloniki (WIRRT) has length of 8.4km. It has three lanes per direction separated by a median and no emergency lanes. The traffic increase and moreover the existence of eight at grade intersections along the WIRRT degrade the provided level of service. For the elimination of these intersections an upgrade project is underway for implementation that includes the construction of five grade separated intersections and several interventions on the adjacent road network. This paper presents in brief the methodology and the results of the project’s Cost-Benefit Analysis, which assessed the expected socioeconomic benefits, emerging mainly from minimising the delays for users due to the elimination of the at grade signalised intersections.


Author(s):  
András Szele ◽  
Lajos Kisgyörgy

Managing the congestion is an old and legitimate claim of the cities. However, in spite of the promising solutions, the use of passenger cars outside the city centers did not decrease. The still hot topic requires a real solution.The goal of the traffic planning and management was to serve the traffic demands but with the increase in traffic, infrastructure development could not keep up, so this goal - theoretically - is not valid anymore. We are in the midst of a paradigm shift: the old goals are obviously not working, but new goals and the tools needed to achieve them have not yet been developed.According to the presented research, the operation of urban-suburban rush hour congestion radically differs from the way we have assumed so far, so a new framework was developed that describes this traffic operation. This framework allows us to look for new and valid management solutions and set new strategic and operational goals. In this paper, it is proposed not to build infrastructure for traffic demands, but to adapt the traffic demands to the infrastructure, by creating the optimal saturated traffic flow. This will prevent negative traffic dynamics and impacts on the network and provide higher quality and a more reliable road network operation. The research results have led us to theoretical questions such as the right of the limitation of the free routing on the road network.


2019 ◽  
Vol 31 (2) ◽  
pp. 55-66
Author(s):  
Astri Purnama Dewi ◽  
Syafrudin Syafrudin ◽  
Bambang Riyanto

Kota Semarang mengalami peningkatan pergerakan lalu lintas setiap tahunnya, khususnya  Kecamatan Semarang Tengah, yang memiliki fungsi sebagai kawasan pusat perbelanjaan, perdagangan dan jasa, perkantoran, dan pendidikan. Pemerintah Kota Semarang telah berupaya mengatasi permasalahan lalu lintas dengan menerapkan sistem satu arah pada ruas Jalan Gajahmada, Jalan Pandanaran, Jalan MH. Thamrin, Jalan Pemuda, Jalan Imam Bonjol Selatan, Jalan Kapten Piere Tendean, dan Jalan Indraprasta. Penelitian ini dilakukan untuk mengetahui gambaran efektivitas atas penerapan sistem satu arah pada ruas jalan tersebut dengan menggunakan metode analisis deskriptif dan kuantitatif hasil keluaran EMME2 versi 9.5. Hasil dari penelitian ini yakni setelah diterapkannya sistem satu arah masih terdapat ruas jalan yang mengalami penurunan kinerja jalan, yaitu ruas jalan Imam Bonjol Selatan belum sesuai dengan persyaratan fungsi jalan karena lebar badan jalannya hanya 10 meter sedangkan dalam persyaratan untuk fungsi jalan arteri sekunder lebar badan paling sedikit 11 meter, ruas Jalan Kapten Piere Tendean dan Pandanaran nilai DS 0.75 pada waktu sore hari dan berada pada tingkat pelayanan D pada ruas Jalan Pandanaran sedangkan tingkat pelayanan E berada pada ruas Jalan Kapten Piere Tendean. Selain itu, pada ruas Jalan Imam Bonjol Selatan, Kapten Piere Tendean, dan Pandanaran masih belum sesuai dengan indikator kinerja sistem jaringan jalan untuk meminimalisasi atau mengurangi ketertundaan total dan panjang perjalanan total karena kecepatan perjalanan menurun dan kapasitas jalan belum mampu menampung beban lalu lintas. Solusi penanganan yang dilakukan adalah nilai DS harus 0.75 dan maksimal menunjukkan ditingkat pelayanan C, Jalan Kapten Piere Tendean, dan Jalan Pandanaran, pelebaran jalan 1 meter pada ruas Jalan Imam Bonjol Selatan dan pengaturan off street parking pada ruas Jalan Imam Bonjol Selatan, Kapten Piere Tendean, dan Pandanaran. Kata kunci: EMME2 versi 9.5, kinerja sistem jaringan jalan, permasalahan lalu lintas, sistem satu arah.   Performance Analysis of One - Way Roads in Central Semarang District, Semarang : The city of Semarang is experiencing an increase in the movement of traffic every year, especially in Central Semarang District which has a function as a shopping center, trade and service area, office area, and education area. The Semarang City Government has tried to overcome traffic problems by implementing a one - way system on Gajahmada, Pandanaran, MH. Thamrin, Pemuda, Imam Bonjol Selata n, Piere Tendean, and Indraprasta streets . This study was conducted to determine the effectiveness of the implementation of the one - way system on the road using the analysis method, which wa s descriptive and quantitative output of EMME2 version 9.5. The re sults showed that after the implementation of one - way system, there was still decreased performance in some roads. The road segment in Imam Bonjol Selatan street had not fulfill the requirements for road functions because the width of the road wa s only 10 meters, mean while according to the requirements for secondary arterial road functions it should be at least 11 meters. The DS value of Piere Tendean and Pandanaran Roads was 0.75 in the afternoon . Furthermore, the level service of Pandanaran Road was D w hile Captain Piere Tendean Road section was E . In addition, Imam Bonjol Selatan, Captain Piere Tendean and Pandanaran Roads we re not in accordance with the performance indicators for the road network ing system to minimize or reduce total delays and total t rip length because travel speeds were declining and road capacity had not been able to accommodate traffic loads. T o overcome this problem the DS value must be 0.75 and the maximum service level should be C in Piere Tendean and Pandanaran Road s , widening 1 meter road on Imam Bonjol Selatan section, and setting off street parking on Imam Bonjol Selatan Road, Captain Piere Tendean, and Pandanaran. Keywords : EMME2 version 9.5, road network system performance, traffic problems, one - way system


Author(s):  
V.P. Sidorov ◽  
P.Yu. Sitnikov ◽  
V.А. Rubtzov

The spaces of Russian cities (the centers of the subjects of the Federation - first of all) have changed significantly due to the growth in housing construction over the past one and a half - two decades. More than 100, mainly multi-storey residential buildings have been built and are under construction in the capital of the Udmurt Republic - Izhevsk. The settlement of new buildings will significantly change the geography of the settlement of the population and the density of the population in individual neighborhoods of the city. The rapid mass construction of buildings creates, in particular, a transportation problem. The transport system is one of the most important components of urban infrastructure. The changes in the geography of the population settlement will lead to changes in the geography of the intensity of traffic flows, to which the city’s road network may not be ready. The problem of such unavailability is due to financial, administrative and technical reasons. After the first and second phases of construction of housing complexes the situation on many important sections of the Izhevsk road network will become significantly more complicated, and the likelihood of road congestion will increase in the next 4-5 years. The authors have developed and applied a methodology for assessing existing traffic flows along the road network, as well as a method for predicting the intensity and directions of prospective traffic flows that will arise during the implementation of construction phases. The “12 micro district” of the city of Izhevsk as a geographical object of research was chosen. The assessment of existing traffic flows was carried out - at the first stage. A forecast was made of traffic on the road network inside and around the perimeter of the “12 micro district” - at the second stage. The results obtained have made it possible to identify the most problematic sections of the street and road network at present and in the near future. The recommendations to overcome the problem situations that were taken to action by the developer were made.


Author(s):  
Артемова ◽  
A. Artemova ◽  
Муравьева ◽  
N. Muravyeva

In the article, the problem of congestion, the main causes of delays and congestion on the road network of the city, presents an analysis of methods to combat congestion and risk assessment models of their occurrence, according to the service marked the busiest streets of the city. Thus, the analysis carried out in the article, enhances the effectiveness of traffic management of the city


Author(s):  
Elizaveta Derevenets ◽  
Elizaveta Derevenets

Gelendzhik is the resort town, there aren't a lot of industrial enterprises here. The main pollutant is transport. The work purpose is the assessment of a condition of the artificial landings of a pine located along the Federal highway "Don" and landings, which is nearly the sea coast. Researches were conducted to a standard technique of the General vital state (A. S. Bogolyubov). The assessment of a condition of pines was carried out during 6 years: from 2010 to 2015. For carrying out research we used 6 experimental grounds on the Markotkhsky spine and 2 control grounds within the town. We investigated 24 trees on each platform, middle age of the trees were 30 - 40 years. Results. 1. The condition of trees in the pine forests located in immediate proximity with the Federal highway "Don" (No. 1, 2, 3) is unsatisfactory. As even weak influences of the majority of atmospheric gaseous pollutants (sulphurous gas, nitrogen oxides, etc.) give effect of a necrosis and hloroz of pine needles, the condition of pines is connected with technogenic pollution. So near the Federal highway "Don" the air environment is strongly polluted by exhaust gases. Information of 2012 confirm that negative influence of the route on Markotkh's vegetation decreases at reduction of load of the route. 2. On the sites located above on a slope (No. 4,5,6) thanks to remoteness and the wind mode intensity of influence of pollutants is lower and a condition of pines the quite satisfactory. 3. Trees on the sites located near the sea (No. 7,8) are in a good shape. Small deterioration of a state is noted in very droughty years. Conclusion. Results of six years' research show that the condition of the plantings which are in close proximity with the road worsens. It is explained by increase in intensity of the movement on the road, especially during a resort season. Gelendzhik is the city with a good ecological shape, but the damage to environment is already caused. If not to take measures, we can lose a unique part of the nature in the future, recreate it will be impossible. Measures of reduction of negative impact of exhaust gases were offered. Results of researches are transferred to ecological department of the City administration of Gelendzhik.


2020 ◽  
Vol 4 (26) ◽  
pp. 91-95
Author(s):  
D. A. Smirnov ◽  

The article reveals the content of measures to improve the organization of transport services in the metropolis. The key directions of the city transport system development are considered. The analysis of the offered offers is carried out. Keywords: metropolis, transport development, public transport, street and road network.


Author(s):  
Elizaveta Derevenets ◽  
Elizaveta Derevenets

Gelendzhik is the resort town, there aren't a lot of industrial enterprises here. The main pollutant is transport. The work purpose is the assessment of a condition of the artificial landings of a pine located along the Federal highway "Don" and landings, which is nearly the sea coast. Researches were conducted to a standard technique of the General vital state (A. S. Bogolyubov). The assessment of a condition of pines was carried out during 6 years: from 2010 to 2015. For carrying out research we used 6 experimental grounds on the Markotkhsky spine and 2 control grounds within the town. We investigated 24 trees on each platform, middle age of the trees were 30 - 40 years. Results. 1. The condition of trees in the pine forests located in immediate proximity with the Federal highway "Don" (No. 1, 2, 3) is unsatisfactory. As even weak influences of the majority of atmospheric gaseous pollutants (sulphurous gas, nitrogen oxides, etc.) give effect of a necrosis and hloroz of pine needles, the condition of pines is connected with technogenic pollution. So near the Federal highway "Don" the air environment is strongly polluted by exhaust gases. Information of 2012 confirm that negative influence of the route on Markotkh's vegetation decreases at reduction of load of the route. 2. On the sites located above on a slope (No. 4,5,6) thanks to remoteness and the wind mode intensity of influence of pollutants is lower and a condition of pines the quite satisfactory. 3. Trees on the sites located near the sea (No. 7,8) are in a good shape. Small deterioration of a state is noted in very droughty years. Conclusion. Results of six years' research show that the condition of the plantings which are in close proximity with the road worsens. It is explained by increase in intensity of the movement on the road, especially during a resort season. Gelendzhik is the city with a good ecological shape, but the damage to environment is already caused. If not to take measures, we can lose a unique part of the nature in the future, recreate it will be impossible. Measures of reduction of negative impact of exhaust gases were offered. Results of researches are transferred to ecological department of the City administration of Gelendzhik.


Sign in / Sign up

Export Citation Format

Share Document