scholarly journals AN APPLICATION OF THE ANALYTIC NETWORK PROCESS TO ASSESS RISKS IN A MEGA-CONSTRUCTION PROJECT

Author(s):  
Sukulpat Khumpaisal ◽  
Mohd Noor Nazali ◽  
Zairul Musa Nisham ◽  
Andrew David Ross

<p class="Bodytext" style="margin: 0in 0in 0pt;">This paper aims to introduce an Analytic Network Process (ANP) as an innovative tool to support the decision makers or project managers to deal with the potential risks of mega-construction projects. Risks assessment criteria used to accomplish the ANP calculation was based on both a review of the literature and related experience against Social, Technological, Economic, Ecological and Political (STEEP) requirements. A large airport terminal, London Heathrow Terminal 5, was chosen as a case study to demonstrate the effectiveness of the ANP model. The result reveals that ANP is an effective tool to support developers to make decisions based on risks assessment during their feasibility analysis. The ANP model proved its efficiency, and can be adopted by construction practitioners to suit the project requirements in order to assess risks in the mega-projects. However, it is recommended additional study is needed to assess risks in mega-projects.</p><p class="Bodytext" style="margin: 0in 0in 0pt;">http://dx.doi.org/10.13033/ijahp.v2i2.43</p>

Author(s):  
Nagwan El- Sayed Abo El- Enen, Khaled Mohamed Heiza, Ibrahim Nagwan El- Sayed Abo El- Enen, Khaled Mohamed Heiza, Ibrahim

Due to recent environmental and Political requirements, and regulations of the construction industry, in which bridges is one of its important category, deciding its proper constructability is becoming vital. Therefor the objective of this research is to develop a decision model for selecting proper constructability of green bridges constructions, the model was built based on analytical network process (the ANP) soft were program, integrated with value engineering approach. For this analytical study different parameters are identified and ranked to be implemented for the decision model developed on the biases of four surveying studies conducted in this study the results of these surveying's was be analyzed by using the statically analytical program; "SPSS". Model validation and reliability is carried out using the analytical network process (ANP) for statistically analysis using case study which is a cable bridge project constructed in Egypt. ANP proves to be an effective framework for assessing readiness to adopt and facilitating TQM. The result of the study illustrate that the proper constructability alternative in green bridge concept for this determinate project is the concrete box girder type, upon this there is a cost loss of $3, 500 per square meter, equivalent to 50% losses, respect to the life cycle cost this is due to did not using the best alternate of the estimated project. upon the possibility of applying this decision model to such studies of infrastructure projects, and with respect to the results gained; it is recommend to apply the ANP model with respect to VE procedures to bridges projects of all kinds and their determinants, as well as all other construction projects, especially national ones, in future studies, which allows decision- makers to make decisions that aim at the highest quality without any waste in unnecessary costs.


Author(s):  
Mahmoud Modiri ◽  
Mohammad Dashti

Today, IS supplier selection is one of the most critical steps in the outsourcing process; the success of outsourcing is highly dependent on the selection of IS suppliers. This paper proposes a new hybrid fuzzy multi-criteria decision-making (MCDM) model, which uses decision-making trial and evaluation laboratory (DEMATEL) technique, analytic network process (ANP), and Vlse Kriterijumska Optimizacija I Kompromisno Resenje(VIKOR) to evaluate four potential suppliers using seven factors and five decision makers using a realistic case study. the results showed that Service support is importance for outsourcing. The proposed model can help practitioners improve their decision making process.


2015 ◽  
Vol 21 (6) ◽  
pp. 733-747 ◽  
Author(s):  
Gulbin Ozcan-Deniz ◽  
Yimin Zhu

The construction industry has a considerable share in overall resource and energy consumption. Consequently, decision-makers try to achieve environmentally conscious construction by integrating environmental objectives into the selection of construction elements. Due to the complexity of construction projects, it is a known challenge to provide an effective mechanism to select the most feasible construction methods. Thus, it is crucial to learn the interdependency between various resource alternatives, such as material and equipment type, under various project conditions like unavailability of resources. An analytic network process (ANP) was used in this study to construct a decision model for selecting the most feasible construction method. Data collected via interviews with highway construction experts were used to model the dependency between decision parameters, such as project conditions and resource performance indicators. The proposed ANP model output the relative importance weights of decision parameters so that they can be used to identify environmentally conscious construction methods. The proposed mechanism is a valuable asset for construction decision-makers especially when their ability to select construction methods is limited by project constraints. Although the model was tested in a highway project in this paper, it can be further extended to benefit building construction and sustainable decision-making problems.


2014 ◽  
Vol 567 ◽  
pp. 654-659
Author(s):  
Alireza Valipour ◽  
Hadi Sarvari ◽  
Yahaya Nordin ◽  
Md Noor Norhazilan ◽  
Seyed Meysam Khoshnava

Risk allocation is the most significant factor in risk management. Earlier research has shown that risk allocation is essential to achieve success in construction projects. Risk allocation may fail to be achieved due to lack of a mechanism for joint risk management. Successful optimal risk allocation requires one to identify and evaluate the risk allocation criteria, which interact and overlap with each other and can lead to significant variation in the decision outcome in risk allocation. This study aims to allocate the risks in EPC projects using the analytic network process (ANP) method. The ANP approach is preferable in identifying the problems of interdependence and feedback among various criteria factors. The method utilizes data that are collected through a literature review, interviews, and a questionnaire distributed to EPC project experts. The results have shown that 12 risks are allocated to the developer, 9 risks are shared between developer and contractor, and 12 risks are allocated to the contractor. In conclusion, ANP is found to be suitable in analyzing the feedback and interdependencies among risk allocation criteria.


2019 ◽  
pp. 271
Author(s):  
Abi Revyansah Perwira ◽  
Bayu Kharisma

Abstract: Integrated One-Stop School Evaluation Using Analysis SWOT-Analytic NetworkProcess (Case Study in Purwakarta Regency). One way to reduce dropout rates is through aSekolah Satu Atap Terpadu. One of the regencies in West Java that has organized a SekolahSatu Atap Terpadu as well as the object of this research is Purwakarta regency. By using SWOTAnalyticNetwork Process(ANP)analysis, thisstudyseekstoevaluatewhile providingalternativepolicies for the development of Sekolah Satu Atap Terpadu in Purwakarta regency. The data inthis study were obtained by filling out questionnaires by respondents online through Google Form,where respondents were actors who were directly involved in the implementation of a SekolahSatu Atap Terpadu. From the analysis results obtained Strengths and Threats occupy the highestvalue. Strengths include students could continue their education up to junior high school level andlocal government supports both in terms of budget and curriculum. While Threats, among others,school management has become more complex and the delegation of authority from the central andregional governments is not clear. Therefore, the ST strategy can be used as an alternative policyin increasing Strengths and minimizing Threats.Keywords: Sekolah Satu Atap Terpadu; SWOT Analysis; Analytic Network Process (ANP).


2021 ◽  
Vol 14 (2) ◽  
pp. 62-70
Author(s):  
Huda Yaseen ◽  
Hafeth I. Naji

Construction projects are of a special nature affected by many factors, which makes them exposed to multiple risks that may lead to the abandonment of projects. Recently, the Iraqi construction sector is facing a number of problems. Abandoned construction projects are one of the most common and dangerous problems in the construction industry in Iraq, with their negative effects on stakeholders, the economy, and the environment due to the lack of sufficient financial and administrative capabilities to complete construction projects, which is reflected in exceeding the time limit for the completion of projects. The aim of this research is to use the analytic network process (ANP) technique to choose the best form of Public-Private Partnership (PPP) contracts to fund abandoned projects in Iraq. using a questionnaire survey to determine the most criteria and alternatives for selecting appropriate financing for the abandoned project. The results shown final weight of the Build-Own-Operate (BOO) contract from ANP is 0.533, which is the best form of PPP contract among the alternatives proposed to fund the project.


Facilities ◽  
2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Joseph H.K. Lai ◽  
Huiying (Cynthia) Hou ◽  
David J. Edwards ◽  
P.L. Yuen

Purpose This study aims to establish a rigorous model that can pragmatically evaluate the facilities management (FM) performance of hospitals. Design/methodology/approach Among the applicable performance indicators that were identified from extant literature, a focus group study shortlisted ten key performance indicators (KPIs) in four categories (safety, physical, financial and environmental) and verified their practicality. Using the analytic network process (ANP) method to process the focus group’s responses yielded importance weightings for the KPIs and developed the intended evaluation model. This model was then validated by a case study. Findings From the empirical data collected, two types of FM performance data and two scenarios of KPI scores were identified. To process these data and scores, a robust calculation method was devised and then proved useful in obtaining an overall score for holistic hospital FM performance. The case study confirmed the appropriateness and validity of the model developed. Research limitations/implications Through illustrating how the ANP method could be applied to develop an FM performance evaluation model, the study contributes knowledge to the multi-criteria decision-making domain. Despite the geographical limitation of the model established (i.e. centered around a group of hospitals investigated in Hong Kong), the study can serve as a reference for developing performance evaluation models for other buildings or infrastructures globally. Practical implications The model constitutes a practical tool for evaluating the FM performance of hospitals. Using this model on a regular basis will enable performance benchmarking and hence, continuous improvement of FM services. Originality/value The ANP model established is the first of its kind tailored for evaluation of hospital FM performance.