scholarly journals Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia

2018 ◽  
Vol 7 (4) ◽  
pp. 2209 ◽  
Author(s):  
Massofia Md. Ali ◽  
Nor Haslinda Abas ◽  
Haryanti Mohd Affandi ◽  
Nor Ain Abas

In Malaysian construction industry, Industrialised Building System (IBS) has been introduced to replace the traditional construction method. While the government has been making significant efforts to encourage the IBS adoption, the uptake of IBS in Malaysia construction projects remains low. This study seeks to identify the barriers to the uptake of IBS and to propose the strategies to enhance the implementation IBS in Malaysian housing construction process from the perspectives of consultants. Interviews were conducted with five selected experienced individuals who were working with consultants (civil and structure engineer and quantity surveyor). The results revealed that, lack of knowledge and insufficient skilled workers are the main factors that impede the IBS uptake in Malaysia. Meanwhile, the most strategy proposed by the interviewees is to increase the facilities and incentives in order to expand research and development in IBS.  

Author(s):  
Norazlin Mat Salleh ◽  

The Malaysian government strongly encourage the application of new techniques in building construction such as the Industrialized Building System (IBS). With this new IBS technology, numerous advantages will be obtained and will directly raise the performance of the building. However, the acceptance of IBS in Malaysia is still low. There are many components of IBS. The objective of this paper is to describe the Interlocking Mortarless Blocks System (IMB) and to identify the challenges in the utilization of the mortarless blocks system in housing construction. This research was carried out in Ipoh, Perak, with a focus on housing construction projects. Questionnaire was provided for the respondents to answer. The data was analyzed using the descriptive analysis from the SPSS software. The result revealed that one of the challenges is contractors who tend to use traditional construction method rather than the Interlocking Mortarless Blocks system method. The usage of Interlocking Mortarless Blocks in Malaysian is still low as there is no specific standard on Interlocking Mortarless Blocks system. Therefore, the findings of this research can hopefully assist Malaysian contractors in making a decision on the component to be used in their projects. Additionally, the findings ensure that the government can take appropriate action to encourage the use of IBS, especially the Interlocking Mortarless Blocks


2021 ◽  
Vol 9 (3) ◽  
pp. 52-57
Author(s):  
Yasir Mohamed Hassan Amin ◽  
Mohamed Abdulla Nugdalla Ahmedi

Quality management is considered one of the most important obstacles facing the construction industry in Sudan. The application of a quality assessment system contributes to the development of quality in projects as it is possible to measure the quality in projects. This paper aims to introduce one of the quality assessment systems, which is the system followed and applied in the Singapore (CONQUAS). This system assesses quality based on structural, architectural, mechanical and electrical work. The paper also aims to study the factors affecting the application of the quality assessment system in Sudan. The study is carried out in the region of Khartoum. The study is focusing on the construction projects. The study is carried out by questionnaires and other literature review. The respondents are consultants and contractors. The data has been distributed and analyzed by using the Average Index. From the study it was found that CONQUAS standard is assessed the building based on workmanship standards by the assessors from the BCA on site using standard score sheets. The assessment is done throughout the construction process for structural, mechanical and electrical works, and from questionnaire results the main factors affect construction industry in Sudan is lack of standardization in Sudan. The author recommended that more study shall be conducted to identify factors affecting quality in Sudanese construction industry and how to improve the quality.  


Author(s):  
Jingjing Sun

Abstract: In recent years, with the rapid development of modern social economy, the urbanization process has continued to grow, and with it, so as to the demand for housing construction in urban areas. From the development perspective of construction projects, the construction involved would not only has to have a strong structural quality, but attention is also needed in the overall quality of the building. In this, a reasonable introduction of post-pouring belt construction technology in the building construction process can effectively control cracks in concrete structures. This article takes the post-pouring belt construction technology as the main research object, and focuses on its application in the housing construction process, which has shown to provide better assistance in aiding construction.


2011 ◽  
Vol 243-249 ◽  
pp. 6339-6343
Author(s):  
Guang Bin Wang ◽  
Gui You He ◽  
Li Bian

Due to the great negative impact, the construction industry needs to undergo a paradigm shift from traditional construction to sustainable construction. To reach the goal of sustainable development, the construction industry needs to intensify its efforts to move to a knowledge intensive mode. Based on the analysis of e-Cognos and the concept of ontology, this paper proposes that e-Cognos ontology can be applied in the development of sustainable construction process ontology, which is a key part of knowledge management system (KMS). Following this, the application process of ontology-based KMS is analyzed using IDEF0 modeling method. Finally, this paper analyzes interorganizational collaboration model in sustainable project.


Author(s):  
Azeanita Suratkon ◽  
◽  
Riduan Yunus ◽  
Rafikullah Deraman ◽  
◽  
...  

Design-Bid-Build (DBB) or commonly known as Traditional method is the earliest and most prevalent procurement method used in Malaysian construction industry. Design-Build (DB) and Construction Management (CM) procurement methods were later introduced in Malaysia as an endeavour to satisfy and accommodate the increase in project complexity and the need for avoiding drawbacks of the Traditional methods. Each procurement method has different nature and possesses certain characteristics. Therefore, this study was carried out to ascertain and compare the characteristics of these three procurement methods that are implemented in building construction projects in Malaysia. A questionnaire survey was conducted among architects, consultants, contractors and owners or developers to elicit their feedback on the characteristics which were categorised into time, cost, quality, complexity and flexibility, degree of involvement and responsibility allocation and technical expertise. The findings indicated that only DB method almost fulfils all the characteristics under the six categories, whereas, DBB methods garnered agreement only for certain characteristics under time, cost, complexity and flexibility and technical expertise categories. Meanwhile, the only CM method’s characteristics that satisfy agreement from the respondents are the often used of fast track approach and lack of certainty in price. This study concludes that when a procurement method is adopted for a construction project, not all the features or characteristics will turn out as expected. There are many factors that contribute and are influential on the success in procurement methods that are worth for further investigation.


2021 ◽  
Vol 15 (S1) ◽  
pp. 53-69
Author(s):  
Mohd Shazreen Seman ◽  
Mohd Reza Esa ◽  
Mohd Reeza Yusof

In recent decades, the construction industry has been widely criticized for its lack of efficiency and productivity, and it has been shown that the Malaysian construction industry records poor quality on its projects. To overcome this issue, the Technical Committee on Quality Assessment in Construction with the support of the Construction Industry Development Board (CIDB) has introduced Quality Assessment System in Construction (QLASSIC). QLASSIC is a scoring system that is used to assess and evaluate the performance of construction buildings. It is based on the Construction Industry Standard (CIS 7:2006). Unfortunately, this assessment system had poor implementation since its introduction in November 2006. QLASSIC was not extensively implemented and was taken lightly by the contractors and developers in Malaysia. There are still a huge number of contractors that are not aware of QLASSIC even the big construction companies. Thus, this research is aimed at investigating the contractor’s perspective towards the implementation of QLASSIC in the construction industry in Malaysia. Three objectives are developed to achieve the aim: (1) identification of the needs to implement QLASSIC; (2) investigation of issues and challenges to implement QLASSIC and (3) recommendation of strategies to implement QLASSIC. Structured questionnaire surveys were distributed to the G7 and G6 contractors in the Klang Valley area; which may have or may not have experience in implementing QLASSIC in their projects. The result revealed that majority of the respondents were aware and understand the needs of QLASSIC implementation, but there were still few who were unfamiliar with the QLASSIC. The current level of implementation of QLASSIC in Malaysia is still not satisfactory due to several issues and challenges acting as barriers to its implementation. Therefore, the initiatives from the government are important to promote QLASSIC implementation in the construction industry. By doing this, the contractors would be aware of the implementation of QLASSIC in the construction industry. The significance of this research is that it will assist contractors and other construction players in comprehending the implications and importance of QLASSIC implementation.


Author(s):  
Svetlana Mjakuškina ◽  
Maija Kavosa ◽  
Inga Lapiņa

In recent years, the construction industry faced major challenges in ensuring a balance between environmental, economic, and social aspects. There are a lot of different studies on different aspects of the construction industry. Most of the available studies look at the construction supervision process mainly from the constructor’s point of view. However, there is little research on the market surveillance and supervision process performed by the government and its role in ensuring sustainability in a particular area. The aim of this study was to identify the main activities within the construction supervision process to achieve the sustainability of construction. The theoretical framework of the concept of sustainability in construction and in the activities of the supervision process was analyzed on the basis of a literature survey. The research revealed a connection between sustainability elements and the construction supervision activities. The results of the survey identified the most important factors that influence, negatively as well as positively, the achievements of sustainability in the supervision process. The research results are significant in order to create a construction supervision process which would not only ensure the compliance with the set requirements but also help achieve sustainability in the particular area. Research Limitations/Implications: Research is focused on the supervision process of public building construction in Latvia.


Author(s):  
Octavio P.M Marques ◽  
I M. Alit K. Salain ◽  
I W. Yansen

Building project as one of the construction services are filled with varying risks during the construction phase of the project implementation. At the stage of the project implementation, risks may arise either the risk of time, cost and those which affect the quality of the project. Therefore, we need to understand the risks at the construction phase and mitigation to the risks to meet in execution of project based on initial planning. The study was conducted to identify the risks in the implementation of construction projects of government buildings by using survey methods that aim to get the opinion of the respondents regarding the risks at implementation of the government building construction projects in the city of Dili - Timor Leste. Further, it was done a risk assessment to determine the major or main risks. Major risk is controlled through mitigation measures and allocation of risks to the parties directly involved in construction projects such as Project Owner, Technical Supervisor, Consultant Design, Consultant Supervision and Contractor. The analysis used in this study is a qualitative analysis. The results showed 64 risks identified in the implementation of construction projects there are 10 government buildings risks (16%) with an unacceptable category, 18 risks (28%) with the undesirable category, 28 risks (44%) with acceptable category and 8 risks (12%) with negligible category. Ownership of major / main risk to the parties directly involved in the implementation of construction projects such as the project owner, technical supervisor, consultant design, consultant supervision and contractors. The project Owner and Technical Supervision (Department of Public Works) is expected to further enhance the ability to manage projects so not throwing responsibility in managing government projects. consultant design and sonsultant supervision to be more careful in design till supervision during the implementation period so as to meet the cost, quality and time planned. Contractors are expected to further improve the performance of the building construction project.


2018 ◽  
Vol 251 ◽  
pp. 05017 ◽  
Author(s):  
Azariy Lapidus ◽  
Ivan Abramov

Against the backdrop of the economic crisis and the complicated international situation, the government pays great attention to reforming the construction industry, creating the conditions for adapting construction firms to the existing situation and associated entrepreneurial and production risks. Concurrently, as the ever-increasing competition places higher requirements on potential participants in construction projects under state-financed and municipal contracts, new laws and regulations are being developed and improved, and bidding rules are systemized and optimized to help select the most reliable contractors resistant to various impacts. The purpose of this paper is to describe the term “sustainability of a construction firm” and to set the tasks of research into the ways of increasing sustainability of construction firms based on efficient organization of construction operations and up-to-date production and labor technology. The scientific problem suggested for review lies in ensuring guaranteed sustainability of construction firms amid uncertainties of construction operations. This paper focuses on research into and the methods for determining a correlation between sustainability of a construction firm and its resource potential that depends on a number of diverse factors.


Author(s):  
Ulrike Quapp ◽  
Klaus Holschemacher

Construction projects often are particularly susceptible to conflicts due to their long-term character and complexity. In Germany, courts must deal with around 100,000 construction dispute litigations per year. Alternative Dispute Resolution (ADR) can be an alternative to expensive as well as time-consuming litigation and can help to relieve the judicial system. Furthermore, ADR may contribute to the satisfying settlement of a dispute between parties involved in the construction process and thus help to reach construction projects’ completion on time and within budget. Often, ADR mechanisms such as adjudication, mediation, and conciliation will be used. The paper analyzes the development of ADR in Germany in conjunction with European legal aspects. With special reference to the construction industry practice in Germany, various ADR measures and their advantages and disadvantages, as well as the current situation, will be explained. The authors conclude that, although ADR in Germany has experienced an upswing since the 1990s, it is used only to a small extent for settling disputes in construction projects. An increased knowledge about the advantages and disadvantages of different ADR measures in the construction industry would lead to more frequent uses of ADR. That, and a clever and detailed contract design, which helps to avoid conflicts basing on unclear contract contents, could save money and relieve the courts from time-consuming legal proceedings.