scholarly journals Optimization of Wastewater Treatment Plant Design using Process Dynamic Simulation: A Case Study from Kurdistan, Iraq

2019 ◽  
Vol 7 (1) ◽  
pp. 59
Author(s):  
Hayder M. Issa

Satisfactory effluent characteristics are indispensable to evaluate the performance of any wastewater treatment plant (WWTP) design. Dynamic simulation software has a great role in pursuing this objective, in which an efficient and cost-effective design is constantly performed. In this study, a dynamic simulator sewage treatment operation analysis over time (STOAT) has been used under certain influent conditions to optimize design possibilities for modifying an existing primary WWTP College of Engineering Wastewater Treatment Plant (COEWWTP) at Erbil, Kurdistan, Iraq. The optimization was established on the basis of total suspended solids (TSS) and biochemical oxygen demand (BOD) characteristics in the effluent. Two alternative design schemes were proposed; trickling biofilter and aeration basin. In the dynamic simulation for the investigated design schemes, the predicted effluent profile showed that each of the existing and trickling biofilter processes has failed to correspond to the valid effluent limitation, whereas predicted results of the aeration basin exhibited an effluent profile that meets TSS and BOD allowable limits. Different simulation models have been implemented by STOAT to simulate treatment processes in studied design approaches: ASAL 1 model; BOD model; BOD semi-dynamic model; and SSED 1 model. This study offers an additional understanding of WWTP design and facilitates the application of dynamic simulators as tools for wastewater treatment development in Kurdistan.

2018 ◽  
Vol 7 (4.20) ◽  
pp. 310
Author(s):  
Ali Hadi Ghawi

In this study, a sewage treatment plant was designed for the city of Al-Nasiriyah in Dhi Qar governorate in southern Iraq serving 316083 inhabitants. The resulting treated water is suitable for agricultural irrigation and can be discharged to the Euphrates River when needed by adding nitrogen and phosphorus removal units to the wastewater treatment plant. The obtained plant design has been verified and optimized by implementing the proposed plant layout in the GPS-X 5.0 modeling and simulation software (Hydromantis). Where the results of the design showed that the total phosphorus flow is higher than the desired limit of 2 mg / L, due to the excessive release during anaerobic digestion. Control of phosphorus concentration can be controlled by adding chemicals (iron or aluminum salts) in different parts of the wastewater treatment plant. In this case, two different control strategies can be implemented: adding aluminum doses in both water and sludge lines (at Chem1 and Chem2 points) or adding aluminum doses in the water line only (at point Chem2). The second strategy showed that it is the most efficient in controlling the concentration of phosphorus and nitrogen produced, which meets the limits of the Iraqi standard of water used in irrigation.  


2020 ◽  
Vol 15 (2) ◽  
pp. 142-151
Author(s):  
Peter Lukac ◽  
Lubos Jurik

Abstract:Phosphorus is a major substance that is needed especially for agricultural production or for the industry. At the same time it is an important component of wastewater. At present, the waste management priority is recycling and this requirement is also transferred to wastewater treatment plants. Substances in wastewater can be recovered and utilized. In Europe (in Germany and Austria already legally binding), access to phosphorus-containing sewage treatment is changing. This paper dealt with the issue of phosphorus on the sewage treatment plant in Nitra. There are several industrial areas in Nitra where record major producers in phosphorus production in sewage. The new wastewater treatment plant is built as a mechanicalbiological wastewater treatment plant with simultaneous nitrification and denitrification, sludge regeneration, an anaerobic zone for biological phosphorus removal at the beginning of the process and chemical phosphorus precipitation. The sludge management is anaerobic sludge stabilization with heating and mechanical dewatering of stabilized sludge and gas management. The aim of the work was to document the phosphorus balance in all parts of the wastewater treatment plant - from the inflow of raw water to the outflow of purified water and the production of excess sludge. Balancing quantities in the wastewater treatment plant treatment processes provide information where efficient phosphorus recovery could be possible. The mean daily value of P tot is approximately 122.3 kg/day of these two sources. The mean daily value of P tot is approximately 122.3 kg/day of these two sources. There are also two outflows - drainage of cleaned water to the recipient - the river Nitra - 9.9 kg Ptot/day and Ptot content in sewage sludge - about 120.3 kg Ptot/day - total 130.2 kg Ptot/day.


2008 ◽  
Vol 57 (8) ◽  
pp. 1287-1293 ◽  
Author(s):  
A. Jobbágy ◽  
G. M. Tardy ◽  
Gy. Palkó ◽  
A. Benáková ◽  
O. Krhutková ◽  
...  

The purpose of the experiments was to increase the rate of activated sludge denitrification in the combined biological treatment system of the Southpest Wastewater Treatment Plant in order to gain savings in cost and energy and improve process efficiency. Initial profile measurements revealed excess denitrification capacity of the preclarified wastewater. As a consequence, flow of nitrification filter effluent recirculated to the anoxic activated sludge basins was increased from 23,000 m3 d−1 to 42,288 m3 d−1 at an average preclarified influent flow of 64,843 m3 d−1, Both simulation studies and microbiological investigations suggested that activated sludge nitrification, achieved despite the low SRT (2–3 days), was initiated by the backseeding from the nitrification filters and facilitated by the decreased oxygen demand of the influent organics used for denitrification. With the improved activated sludge denitrification, methanol demand could be decreased to about half of the initial value. With the increased efficiency of the activated sludge pre-denitrification, plant effluent COD levels decreased from 40–70 mg l−1 to < 30–45 mg l−1 due to the decreased likelihood of methanol overdosing in the denitrification filter


2012 ◽  
Vol 7 (1) ◽  
Author(s):  
S. S. Fatima ◽  
S. Jamal Khan

In this study, the performance of wastewater treatment plant located at sector I-9 Islamabad, Pakistan, was evaluated. This full scale domestic wastewater treatment plant is based on conventional activated sludge process. The parameters which were monitored regularly included total suspended solids (TSS), mixed liquor suspended solids (MLSS), mixed liquor volatile suspended solids (MLVSS), biological oxygen demand (BOD), and chemical oxygen demand (COD). It was found that the biological degradation efficiency of the plant was below the desired levels in terms of COD and BOD. Also the plant operators were not maintaining consistent sludge retention time (SRT). Abrupt discharge of MLSS through the Surplus Activated sludge (SAS) pump was the main reason for the low MLSS in the aeration tank and consequently low treatment performance. In this study the SRT was optimized based on desired MLSS concentration between 3,000–3,500 mg/L and required performance in terms of BOD, COD and TSS. This study revealed that SRT is a very important operational parameter and its knowledge and correct implementation by the plant operators should be mandatory.


2014 ◽  
Vol 535 ◽  
pp. 346-349
Author(s):  
Mei Wang ◽  
Ming Yang ◽  
Jun Liu ◽  
Jian Fen Li

Effect and benefits of a product or service could be analyzed and evaluated by life cycle assessment during the whole life cycle. Urban sewage treatment plants could improve and control urban water pollution escalating, but it also had certain harm to environment. Effect and benefits of urban wastewater treatment plant A and B were analyzed and evaluated, 13 factors were selected, and comprehensive benefits were researched quantificationally using the method of analytic hierarchy process. It found that urban wastewater treatment plant A who applied A/O process had better benefits than urban wastewater treatment plant B who applied BIOLAK process.


2021 ◽  
Vol 221 ◽  
pp. 31-40
Author(s):  
A.S. Mubarak ◽  
Parvaneh Esmaili ◽  
Z.S. Ameen ◽  
R.A. Abdulkadir ◽  
M.S. Gaya ◽  
...  

2019 ◽  
Vol 6 (1) ◽  
pp. 16-20
Author(s):  
Ali Akbar Rahmani Sarmazdeh ◽  
Mostafa Leili

This research mainly aimed to investigate phosphorus removal from stabilization pond effluent by using anionic resins in the continuous flow mode of operation due to high amounts of phosphorus in the wastewater treatment plant effluent of Kaboodrahang, western Iran, as well as the violation from a prescribed effluent standard to discharge receiving the surface waters. For this purpose, the pilot was made of a plexiglass cylinder and other equipment such as pump and other accessories, as well as Purolite A-100 resin. The reactor effects on the desired study parameters were assessed in two warm and cold seasons. The results showed that the phosphorus concentrations reduced from 7-10 mg/L to 4-7 mg/L and the rate of phosphorus removal was higher in the hot season compared to the cold season. Moreover, the optimum temperature and pH were obtained 21ºC and 8.5, respectively. The mean inlet biological oxygen demand (BOD) was 150 mg/L for both warm and cold seasons, where the highest removal rate of 17% was obtained in the cold season. The mean chemical oxygen demand concentration of the pilot was 250 mg/L for both seasons, and the highest removal rate was observed in the cold season with an efficiency of 18%. Regarding the total suspended solids with the mean inlet of 230 mg/L, the highest removal efficiency was obtained 6% in the warm season.


Sign in / Sign up

Export Citation Format

Share Document