scholarly journals RISK ASSESSMENT KECELAKAAN KERJA PADA PEKERJAAN AIRCRAFT PAINT REMOVAL DI PT. X

Author(s):  
Hesti Fiskalisa Purbayanti ◽  
Sho'im Hidayat

The entire activity involving human factors, machinery, chemicals, and through some work processes had the potential hazard that increased the risk of accidents and health problems. Aircraft paint removal job was a high risk of an accident. The purpose of this research was to identify hazards, assess pure risks, identify risk control, and assess risks after risk control were conducted on aircraft paint removal job in  PT. X. Type of this research was descriptive research. Primary data retrieval techniques in the study was observational and interview. The subject of research were 1 PDCA HSE and 4 aircraft paint removal workers. Variable in this study is the hazards, likelihood, severity, risk levels, and risk control. The results of hazard identification obtained 14 risk in Aircraft Paint Removal such as 1 low risk, 2 middle risks and 13 high risks. Risk control by the company showed that there are 13 high risk decrease to 7, 2 middle risks increased to 6 risk, and 1 low risk increased to 3 risks. In conclusion, PTX. has 14 risks, 13 of them included in the high risk category. There was a decrease in risk due to the control carriedd out by the company into 13 risks and 7 of them included in high risk.Keywords: aircraft paint removal, hazard identification, risk assessment, risk control

Author(s):  
Novita Dewi Vebriyana Dankis ◽  
Mulyono Mulyono

ABSTRACTRevolution in the industry sector has been rapidly grown to fill up all the needs of the consumer products. One involves  supporting advanced machinery such as “Cutting, Skiving, Stitching, Emboss Logo, Roving, Punch Hole, Juki, BrushingEdge, Hammer Over Lapping and Two Molding”. In the factory production process, there are various types of high-risk activities, especially on line upper. The main of this research is to study the risk assessment on export companies line the upper part of the shoes export company using Job Safety Analysis. This research was conducted observational crosssectional design. Observations made to the hazards and control measures. Interviews were conducted to 12 employees. Variables in this research is production activity, hazard identification, risk assessment, risk control and residual risk. The results of hazard identification has been done, there are 91 known potential hazards, for risk assessment found 7 high risk and low risk 5. Machine classified as high risk on the risk assessment is roving machine, whereas low-risk is two molding machine. Control efforts on the upper line in accordance with the hierarchy of controlling a number of 91 controls, whereas for the residual risk still remains as much as 30 residual risk. Control has been applied quite well by pressing the consequences of hazards and risk management.Keywords: risk assessment, controlling, residual risk


Author(s):  
Gatot Basuki HM

<em>PT. Prima Alloy Steel Universal merupakan perusahaan industri manufaktur yang memproduksi Velg kendaraan roda empat. Salah satu tahapan proses produksinya yaitu proses casting, Adanya risiko bagi pekerja akan terjadinya kecelakaan kerja sangat tinggi. Tujuan penelitian ini adalah melakukan identifikasi terhadap risiko bekerja di departemen casting dengan pendekatan Job Safety Analysis. sedangkan penilaian risiko serta penanggulangan risiko bahaya bekerja menggunakan metode HIRARC, hasil dari analisis tersebut digunakan untuk melakukan mitigasi terhadap setiap risiko yang terjadi di departemen casting. Hasil penelitian menunjukan bahwa Terdapat 5 aktivitas kerja dan 13 subaktivitas kerja di departemen casting yang mempunyai potensi bahaya bekerja. sedangkan penilaian risiko diperoleh 2 aktivitas kerja dengan potensi bahaya kategori extreme risk, 4 aktivitas kerja kategori high risk, 3 aktivitas kerja kategori moderate risk, 4 aktivitas kerja kategori low risk. Tindakan penanggulangan risiko dilakukan melalui perbaikan standart prosedur kerja (SOP) pada setiap subaktivitas. Subtitusi pada subaktivitas menggunakan alat berat seperti forklif saat mengganti matras motif dan design velg. Rekayasa engineering untuk mempermudah subaktivitas agar miminimalisir terjadinya kecelakaan kerja. Pengendalian administratif terkait penerapan instruksi kerja, memantau pengunaan APD dan APAR serta pelatihan K3 secara berkala. Memberikan tanda peringatan bahaya. Penyediaan APD pada seluruh subaktivitas untuk digunakan sesuai dengan kebutuhan saat melakukan aktivitas bekerja.</em>


Author(s):  
Leyla Nurlita Fardiah ◽  
Bayu Santoso ◽  
Haqi Fauzan Ahmad ◽  
Fakhri Mauladiansyah ◽  
Ghilman Baihaqi ◽  
...  

Right now the world is facing the Covid-19 outbreak virus, not least in Indonesia. This outbreak has been a pandemic since its inception at the end of 2019. The whole world is struggling to fight this pandemic, as well as in Indonesia where every struggle is increasing so much. All public places are temporarily closed to prevent the spread of the Covid-19 virus. The school became one of the public places that was temporarily closed in order to prevent the spread of the Covid-19 virus in the school environment. There are many causes for the transmission of the Covid-19 virus and the losses that can result from the Covid-19 virus. Therefore the purpose of this study is to be able to use hazards, risks and risk control using the Danger Identification, Risk Assessment and Risk Control (HIRARC) methods in the school environment. Risk identification is done by descriptive research methods, namely the results of research data and related journals available. The results of the study can be known about the activities that exist in the school environment that are needed for distribution and transmission of the Covid-19 virus. There are 14 main activities with 34 potential hazards, expected 13 activities with a high risk category and 1 activity with a high risk category. To be able to control the danger, use protection, wear a mask, always wash your hands using soap and running water and always be ready for hand sanitizer. Saat ini dunia sedang dihadapkan dengan wabah virus Covid-19, tak terkecuali di Indonesia. Wabah tersebut sudah menjadi pandemi sejak awal kemunculannya di akhir tahun 2019. Seluruh dunia sedang berjuang untuk melawan pandemi tersebut, begitu juga di Indonesia yang setiap harinya mengalami kenaikan yang begitu besar. Semua tempat umum di tutup untuk sementara untuk mencegah penyebaran virus Covid-19. Sekolah menjadi salah satu tempat umum yang ditutup untuk sementara guna untuk mencegah penyebaran virus Covid-19 di lingkungan sekolah. Terdapat banyak sekali penyebab penularan virus coviddan kerugian yang didapat dari virus Covid-19. Karena tujuan dari penelitian ini untuk dapat mengidentifikasi bahaya, penilaian risiko dan pengendalian risiko dengan menggunakan metode Hazard Identification, Risk Assessment and Risk Control (HIRARC) di lingkungan sekolah. Identifikasi risiko dilaksanakan dengan metode penelitian deskriptif yaitu hasil riset data dan jurnal-jurnal terkait yang tersedia. Hasil penelitian dapat diketahui bahwa terdapat kegiatan-kegiatan yang terdapat di lingkungan sekolah yang berpotensi untuk terjadinya penyebaran dan penularan virus Covid-19. Terdapat 14 kegiatan utama dengan 34 potensi bahaya, diantaranya 13 kegiatan dengan kategori risiko ekstrim dan 1 kegiatan dengan kategori risiko tinggi. Untuk dapat mengendalikan bahaya terdapat beberapa alternatif diantaranya melakukan kegiatan belajar mengajar secara online dan mematuhi seluruh protokol kesehatan seperti menjaga jarak (Physical Distancing dan Sosial Distancing), menggunakan masker, selalu mencuci tangan menggunakan sabun dan air mengalir juga selalu membawa hand sanitizer.


2020 ◽  
Vol 15 (2) ◽  
pp. 224
Author(s):  
Ardhini Nugrahaeni

Health Risk Assessment (HRA) is one part of risk assessment. In the utility area at PT Pertamina Lubricant Production Unit of Gresik use a machines that have impact on health noise and temperature hazards. The aim of this study was to identify health risk assessment in the utility area at PT Pertamina Lubricant Production Unit Gresik. This was an observational descriptive study with cross sectional design. This study uses total population of 9 people consist of 1 supervisors Health Safety Enviroment (HSE), 3 HSE officer, and 5 workers. Primary data obtained from interviews, observations, noise and temperature measurements. Secondary data were got in the documents from the company. The collected data were assessed as likelihood and severity to count the risk. Afterward risk control assessed and residual risk is calculated. The results of this study showed that there were 3 steps of work with 6 potential hazard noise and temperature. The risk assessment has levels of risk medium risk and low risk. Medium risk was found in the boiler monitoring and compressor. Low risk was found in the stage of preparing CNG gas and turning on the machines. Control effectiveness is 75%. Residual risk has a low risk and no risk. It can be concluded that the potential hazard in the utility area was noise. Most of the risk found in this area was categorized as low risk. Risk control was properly implemented. If the recommendation of control properly implemented there will be no residual risk. The suggestions given are monitoring the implementation of controls, fit to work, use of PPE, socialization of the use of PPE, giving reward and punishment to motivate workers to safe behavior at workKeyword: health risk assessment, utility area, PT Pertamina Lubricant Production Unit Gresik


Author(s):  
Aristy Yulanda Ambarani ◽  
Abdul Rohim Tualeka

HIRA is a process to identify all risk factor in a company then attempt to quantify the risk and determine whether it is acceptable or not. This study aimed to identify and assess occupational risk in the fabrication plate process, tank 42-T-501A, at PT Pertamina (Persero) RU VI Balongan. It is an observational and a cross-sectional study based on research time. The object of this study focuses on PT Pertamina (Persero) RU VI Balongan’s fabrication plate, tank 42-T-501A, workers with a total population of 20 people plus 1 safety inspector. Primary data obtained through observations and interviews which afterward presented in the form of tables and diagrams to be analyzed descriptively. The result showed that there were 6 procedures with 24 potential hazards and 24 occupational risks in the fabrication process tank 42-T- 501A. Based on the result of risk assessment, there are 6 low risk hazards, 6 medium risk hazards, 11 high risk hazards, and 1 extreme risk hazard from the total of 24 hazards in the fabrication plate process tank 42-T-501A. Finally, this study concludes that the dominant risk in the fabrication plate process tank 42-T-501A is high risk (45%). Examples founded in high risk category are stricken by plate, light exposure of torch, fume exposure of torch, sparks of cutting torch, light exposure of welding, fume exposure of welding, sparks of welding, explosions of sandblasting tube and explosions of sandblasting hose.Keywords: hazard identification, risk assessment, fabrication plate


Author(s):  
Teguh Satrio ◽  
M. Robiul Fuadi

 Introduction: Laboratory is a place for the analysis of a material that aims for research, education, quality testing and diagnose diseases. Working in the laboratory will always be faced with a variety of risk and sources of danger that can cause workplace accidents. The purpose of this study was to determine the hazards, hazard identification, risk identification, risk assessments, risk control, and residual risk in working at the clinical pathology laboratory. Method: Data collection method used was observational and descriptive research. When viewed from the time of the study, this study was cross sectional. The data used were primary and secondary data, in which the primary data were obtained by direct observation on site, while secondary data were obtained from SOPs available in the laboratory. Results: The results of the study can identify as many as 9 hazards. In the assessment of risk, it obtained the highest level of danger which was high risk. The level of risk was as high as 3 hazards including needling, splattered patient samples, and reagents or hazardous substances. Conclusion: The conclusion from the study is that this laboratory is classified as dangerous because it finds some of the highest risk levels, which is high risk. The existing risk control in this laboratory is quite complete and good, but it needs to be an improvement in terms of compliance in wearing Personal Protective Equipment (PPE) to minimize the risk.Keywords: clinical pathology laboratory, hazard identification, risk assessment 


Author(s):  
Rizqy Kartika Sari ◽  
Denny A. Wahyudiono

Introduction: Risk management is a management activity that aims to reduce risk to prevent negative impact. Calculation of the amount of risk was carried out to then determine whether the risk was acceptable. In printing activities, contact between humans and machines is unavoidable. The purpose of this study was to evaluate the risk of occupational safety management in the activity of print checking on stamping stage of plastic sacks production in Sidoarjo, Indonesia by conducting hazard identification, risk assessment which includes risk analysis and risk evaluation, control assessment, and residual risk assessment. This is an observational study with a cross sectional design. Methods: Data included primary and secondary data. Primary data were taken by interview and observation. Secondary data were taken from work accident data. Results: A total of 6 hazards were identified. Risk assessment recorded 2 low hazards category  2 medium hazards category, and 2 high risk hazards. Administrative control in the form of inspection and the use of  PPE (Personal Protective Equipment) were implemented. Residual risk assessment shows that the implementation of controls was not optimal. The results of the residual risk assessment indicate that several risk categories fell into a lower category i.e  4 low hazards category and 2 high risk category hazards. Conclusion: The applied risk management has not been optimally implemented. It is recommended that the implementation of inspections is scheduled and a system for recording and reporting inspection findings is established. Keywords: hazard, printing checks, risk management


Author(s):  
Indra Oditya Putra

 The laboratory is a place of activities for research, education and product quality test. The laboratory is also a place to conduct experiments and research that has a source of danger and can cause work accidents. The research objectives are aware of risks and hazards in the laboratory, hence the need to identify hazards, risk assessments, and risk control. Data collection method used is observasional, based on the analysis of properties and data analysis hence this research including descriptive research. In review from the time of the study including cross sectional. The sample of this research is 6 laboratory personnel in 2 laboratories. The data used are the primary data from the observation, interview and questionnaire and secondary data obtained from the Faculty of Pharmacy. The results of the study can identify as many as 8 hazards. In the risk assessment obtained the highest danger level is high risk. High risk risk level of 3 hazards ie HCl solution spills, nitric acid spills, sulfuric acid spills. This laboratory is still quite dangerous because it is still found high risk. The existing risk control in the laboratory is well implemented and needs to be improved by the use of Personal Protective Equipment (PPE). Keywords: hazard identification, risk assessment, risk control


Author(s):  
Reko Triyono ◽  
Noeroel Widajati

Installation of precast concrete in construction of multi-storey buildings at risk of workplace accidents due to be carried out on the altitude. Installation of precast concrete must also use heavy equipment, because of the weight of the material to be install. Accidents on the installation of precast concrete can be very fatal and cause of death. Risk assessment is an attempt to calculating risk arising from hazards, take into account the adequacy of any existing controls, and deciding whether or not the risk is acceptable. The purpose of this research is to studies and perform  risk assessment level onprecast concrete installation at apartment project in Surabaya with hazard, risk, risk control, and residual risk observation. Primary data were collected through interview and observation. Object of this research is installation proses of precast concrete wall at Puncak Bukit Golf Apartment project by PT. Wijaya Karya Bangunan Gedung  in Surabaya. The data was analyzed descriptively using table and naration. Results showed that hazard identify in precast concrete installation at apartment project in Surabaya include: fall from height, squeezed,  fallen object, struck by precast concrete, crush by precast concrete, and electro shock. Risk assessment has obtained 21 hazards. Risk control with was done: installing safety net for falling objects, safety induction, work instruction, wear PPE, and wear fall protection. The result of risk assessment showed19% risk are high risk, 38% with moderate risk category, and 43% with low risk category. Keywords: risk assessment, precast concrete, installing


Blood ◽  
2015 ◽  
Vol 126 (23) ◽  
pp. 4459-4459 ◽  
Author(s):  
Dr. Muhammad Irfan Khan ◽  
Catriona O'Leary ◽  
Mary Ann Hayes ◽  
Patricia O'Flynn ◽  
Pauline Suzanne Chappell ◽  
...  

Abstract Background Evidence based consensus guidelines for venous thromboembolism (VTE) prevention are broadly accepted to be effective and safe for more than three decades (Clagett GP et al, 1992). However VTE continues to be associated with a major global burden of disease with 3.9 million cases of HAT during one year among 1.1 billion citizens of high income countries (Jha AK et al, 2013). Therefore prevention is the key to reduce death and disability resulting from VTE (Kahn S et al, Gould MK et al & Falck-Yitter Y et al, 2012). Ireland like many other countries has yet to implement a mandatory risk assessment tool and thromboprophylaxis (TP) policy nationally. Aims The aim of this study was to calculate the proportion of inpatients who had a VTE risk assessment performed and received appropriate TP in a large tertiary referral hospital. This information will be vital for baseline data for implementation of a new national policy for prevention of HAT. Methods This audit was performed at Cork University Hospital on 4 pre specified days between November 2014 to February 2015. All adult inpatients (Medical and Surgical) excluding maternity and psychiatric were included. Patients on therapeutic anticoagulation were also excluded. The patients' medical chart and drug prescription chart were reviewed to determine whether or not a VTE risk assessment was documented for each patient and if they had received appropriate TP. If no risk assessment had been performed, trained researchers applied the National Institute for health and Care Excellence (NICE) guidelines 92 (Jan 2010) for VTE risk assessment and prevention. Following the risk assessment patients were divided into three categories, high risk of VTE with low risk of bleeding; high risk of VTE with significant risk of bleeding and low risk of VTE. From this the proportion of patients in each group that received appropriate TP were calculated. Results A total of 1019 patients were enrolled the majority were medical patients 63.5% (n=648). The mean age of patients was 69 years. Females accounted for 52% of patients. Average length of hospitalisation for each patient at the time of the audit was 6 days (range 1-664 days). Overall, a formal TP risk assessment was documented in only 24% (n=244) of all charts reviewed however TP was prescribed in 43.2% (n=441) of patients. See table.Table 1.High Risk of VTE low risk of bleedingHigh risk of VTE significant risk of bleedingLow risk of VTENo. of pts80.3% (n=819)16.6% (n=170)2.9% (n=30)VTE risk assessment documented21.9% (n=180)28.2% (n=55)30% (n=9)Received TP46.3% (n=380)28.8% (n=49)40% (n=12) Within the high risk category patients, 64.3% (n=526) medical. TP was only administered to 46.3% (n=380) of patients in the high risk category. This was almost evenly distributed between surgical 50.1% (n=147) and medical 43.4% (n=233) patients. Conclusion This audit was done as the initial step to develop a national policy to prevent HAT. As suspected, this audit highlights that a large proportion of hospitalised patients, both surgical and medical, continue to be at high risk for VTE despite the availability of preventative measures. There is clear illustration of under prescription of safe, effective and recommended means of VTE prevention. The current overall figure of less than 50% prescription of VTE thromboprophylaxis in high risk patients is a major patient safety concern. There are numerous recognised international guidelines for prevention of VTE, and an efficient method to implement these guidelines needs to be developed. Beyond developing national guidelines for TP, we need a co-ordinated approach to implement and monitor compliance with guidelines. Once the preliminary results of this audit were available to us in March 2015, urgent measures were taken to reduce the identified risk such as the establishment of a Hospital Thrombosis Group which developed a user friendly VTE risk assessment tool and TP policy. The VTE risk assessment tool was incorporated into the patients drug prescription chart and included a pre printed prescription for TP. It is now mandatory for the all patients to have a VTE risk assessment tool and TP prescribed if appropriate within 24hrs of admission. This was successfully piloted for four weeks in the acute medical assessment unit and is now incorporated into each patients drug chart throughout the hospital. This audit will be replicated in 6 months from introduction of this initiative, with an aim of >90% compliance. Disclosures No relevant conflicts of interest to declare.


Sign in / Sign up

Export Citation Format

Share Document