Developing a Dynamic Interactive Strategic Asset Management Plan for Wastewater Facilities using Rapidly Emerging Business Analytics Tools and Techniques – A Case Study at City of Houston

2018 ◽  
Vol 2018 (10) ◽  
pp. 3933-3937
Author(s):  
Pratistha Pradhan ◽  
Fazle Rabbi
2019 ◽  
Vol 9 (1) ◽  
pp. 459-467
Author(s):  
Bruno Ferreira ◽  
Nelson J. G. Carriço

AbstractThe current paper aims the application of the Portuguese infrastructure asset management (IAM) methodology to a case study. The inevitable degradation of urban water infrastructures creates new challenges for water utilities engineers and manager, as they need to decide which components should be rehabilitated to efficiently match the public’s demand, while still providing a qualitative and efficient service that doesn’t compromise the financial integrity of water utilities.This methodology is based on a five-step structured sequence - (i) definition of objectives assessment criteria and metrics; (ii) diagnosis; (iii) plan production; (iv) plan implementation; and (v) monitoring and revision – being structured in three distinct levels of planning and decision (i.e., strategic, tactical and operational). The IAM methodology was applied to a sixty-year-old water supply system (WSS) located in Lisbon’s metropolitan area, Portugal, mainly focused on steps (i) to (iii) and to the tactical level of planning. Results obtained are discussed and the main conclusions are presented.


2017 ◽  
Vol 1 (1) ◽  
pp. 1-16
Author(s):  
John Harner ◽  
Lee Cerveny ◽  
Rebecca Gronewold

Natural resource managers need up-to-date information about how people interact with public lands and the meanings these places hold for use in planning and decision-making. This case study explains the use of public participatory Geographic Information System (GIS) to generate and analyze spatial patterns of the uses and values people hold for the Browns Canyon National Monument in Colorado. Participants drew on maps and answered questions at both live community meetings and online sessions to develop a series of maps showing detailed responses to different types of resource uses and landscape values. Results can be disaggregated by interaction types, different meaningful values, respondent characteristics, seasonality, or frequency of visit. The study was a test for the Bureau of Land Management and US Forest Service, who jointly manage the monument as they prepare their land management plan. If the information generated is as helpful throughout the entire planning process as initial responses seem, this protocol could become a component of the Bureau’s planning tool kit.


Author(s):  
Zhigang Song ◽  
Jochonia Nxumalo ◽  
Manuel Villalobos ◽  
Sweta Pendyala

Abstract Pin leakage continues to be on the list of top yield detractors for microelectronics devices. It is simply manifested as elevated current with one pin or several pins during pin continuity test. Although many techniques are capable to globally localize the fault of pin leakage, root cause analysis and identification for it are still very challenging with today’s advanced failure analysis tools and techniques. It is because pin leakage can be caused by any type of defect, at any layer in the device and at any process step. This paper presents a case study to demonstrate how to combine multiple techniques to accurately identify the root cause of a pin leakage issue for a device manufactured using advanced technology node. The root cause was identified as under-etch issue during P+ implantation hard mask opening for ESD protection diode, causing P+ implantation missing, which was responsible for the nearly ohmic type pin leakage.


Forests ◽  
2020 ◽  
Vol 12 (1) ◽  
pp. 7
Author(s):  
Andreja Đuka ◽  
Zoran Bumber ◽  
Tomislav Poršinsky ◽  
Ivica Papa ◽  
Tibor Pentek

During the seven-year research period, the average annual removal was by 3274 m3 higher than the average annual removal prescribed by the existing management plan (MP). The main reason lies in the high amount of salvage felling volume at 55,238 m3 (38.3%) in both the main and the intermediate felling due to oak dieback. The analysis of forest accessibility took into account the spatial distribution of cutblocks (with ongoing felling operations) and the volume of felled timber for two proposed factors: (1) the position of the cutblock and (2) the position of the removal. Cutblock position factor took into account the spatial position of the felling areas/sites, while removal position factor besides the spatial reference took into account the amount of felled timber (i.e., volume) both concerning forest infrastructure network and forest operations. The analysed relative forest openness by using geo-processing workflows in GIS environment showed four types of opening areas in the studied management unit (MU): single-opened, multiple-opened, unopened and opened areas outside of the management unit. Negative effects of the piece-volume law and low harvesting densities on forest operations are highlighted in this research due to high amount of salvage felling particularly in the intermediate felling by replacing timber volume that should have come from thinnings.


Energies ◽  
2021 ◽  
Vol 14 (5) ◽  
pp. 1270
Author(s):  
Minyoung Kwon ◽  
Erwin Mlecnik

Web portals have the potential to promote sustainable environmental ideas due to the capacity of digital media, such as easy accessibility, openness, and networking. Local authorities (LAs) are responsible for activating carbon savings in homes, and they are key actors when it comes to providing neutral information to their citizens. Local authority web portals may thus create environmental awareness, particularly regarding owner-occupied single-family home renovation. Nevertheless, the experiences of LAs developing web portals have rarely been studied. Therefore, this paper analyses the development process of various LA web modules and investigates how LAs foster modular web portals to stimulate the adoption of home renovation with parameters to assess LAs’ actions in terms of the management of web-modules development. A homeowner renovation journey model is applied to map current local authority developments. Case study research and interviews were done to analyse and evaluate the adoption of modular web portals developed and tested by six local authorities in four countries in Europe. Based on the development and use of the modular web portal, lessons have been derived emphasising the importance of co-creation, integrating with offline activities, and a strategic management plan.


2003 ◽  
Vol 2003 (9) ◽  
pp. 37-55
Author(s):  
V. Kenneth Harlow ◽  
Marsi Steirer ◽  
Joe Harris ◽  
Steve Allbee

Sign in / Sign up

Export Citation Format

Share Document