scholarly journals Innovative cost estimation methods for building production

2021 ◽  
Vol 16 (2) ◽  
pp. 7-23
Author(s):  
Jana Smetanková ◽  
Peter Mésároš ◽  
Katarína Krajníková

Abstract Technological progress is reflected in all industries. Obsolete project manuals in the construction industry are being replaced by digitized automated controls that monitor the project in real-time. One of the main trends is the introduction of technologies based on data analytics. Effective use of technology to collect and analyse data is key to improving a building's planning and management across its life cycle. Building information models, which process digital content related to the entire life cycle of a building, are becoming an effective tool. The main goal of the paper is to design and identify the structure of the developed database, which, based on the acquired knowledge, contains graphical models that have selected non-graphical information.

The variants of the division of the life cycle of a construction object at the stages adopted in the territory of the Russian Federation, as well as in other countries are considered. Particular attention is paid to the exemplary work plan – "RIBA plan of work", used in England. A feature of this document is its applicability in the information modeling of construction projects (Building information Modeling – BIM). The article presents a structural and logical scheme of the life cycle of a building object and a list of works that are performed using information modeling technology at various stages of the life cycle of the building. The place of information models in the process of determining the service life of the building is shown. On the basis of the considered sources of information, promising directions for the development of the life cycle management system of the construction object (Life Cycle Management) and the development of the regulatory framework in order to improve the use of information modeling in construction are given.


2019 ◽  
Vol 27 (1) ◽  
pp. 109-127 ◽  
Author(s):  
Ahmet Anıl Sezer ◽  
Jan Bröchner

Purpose The purpose of this paper is to analyse site managers’ ICT preferences for monitoring resource use in refurbishment projects. Design/methodology/approach Information and communication technologies (ICT) developments for the construction industry are increasing the scope for more efficient planning and monitoring of refurbishment projects. The analysis is based on the unified theory of acceptance and the use of technology model. After a short initial survey, a Swedish web/postal questionnaire has received 78 responses from refurbishment site managers, implying a 34 per cent response rate. Findings Managerial choices related to ICT depend more on perceived performance expectancy than on effort expectancy. Large projects and larger firms are associated with more extensive ICT use. Site managers see little need to link to refurbishment clients’ ICT systems. Performance expectancy and age are found to influence ICT choices. Practical implications Site managers play a crucial role in everyday use of ICT tools in the construction industry. The outcome of this investigation is useful for developing digital support, including applications of building information modelling, to improve refurbishment site practices. Originality/value Much has been written about ICT support for new construction practices, but not much attention has been paid to refurbishment site managers’ media choices.


2012 ◽  
Vol 1 (2) ◽  
pp. 17-29 ◽  
Author(s):  
Mohamed Marzouk ◽  
Mohamed Hisham

Bridge Information Modeling (BrIM) is considered an innovation in bridge engineering and construction industry. This paper presents a methodology for using BrIM as an assisting tool in performing detailed cost estimates. The methodology depends on integrating visualization feature of BrIM with specific attributes of the BrIM model intelligent components. A program developed using C# language is used to extract the visualization conclusions and other components’ attributes to MS Excel spreadsheet. This sheet assists in performing detailed cost estimate, and reviewing the estimate. The paper also presents a methodology for generating cash flow and required payments. This methodology depends on integrating the developed program with 4D feature of BrIM.


Author(s):  
Stefania Altavilla ◽  
Francesca Montagna ◽  
Marco Cantamessa

Product cost estimation (PCE) still draws the attention of researchers and practitioners, even though it has been extensively discussed in the literature for more than 20 years. This is due to its central impact on the company's performance. Nowadays, the adoption of cost estimation methods seems to be limited, despite the multitude of examples and applications available. A possible reason is the multitude of approaches and techniques proposed in the literature, which, instead of representing a guide for enabling possible implementations, actually create confusion and ambiguity on their appropriateness for a particular application. Hence, this paper aims to provide a systematic review of the recent literature in the field of PCE, and intensively investigates the aspects that can enable a more conscious decision on the type of technique to be adopted. This results in the identification of five different perspectives, which can be taken simultaneously into account. By combining the different viewpoints, a new multilayer framework is derived, with a specific focus on the whole product life cycle. The proposed framework can be used as a decision-making tool by both researchers and practitioners. In fact, the former group can benefit from the new structure, as a way to identify new areas of possible research opportunities. The latter group is provided an operative guide for the application in industrial contexts.


Vestnik MGSU ◽  
2020 ◽  
pp. 867-906 ◽  
Author(s):  
Vladimir A. Volkodav ◽  
Ivan A. Volkodav

Abstract Introduction. Various building information classification systems are used internationally; their critical analysis makes it possible to highlight basic requirements applicable to the Russian classifier and substantiate its structure and composition. Materials and methods. Modern international building information classification systems, such as OmniClass (USA), Uniclass 2015 (UK), CCS (Denmark), and CoClass (Sweden), are considered in the article. Their structure, composition, methodological fundamentals are analyzed. In addition to international classification systems, Russian construction information classifiers are analyzed. Results. The structure of a building information classifier has been developed and tailored to the needs of BIM (building information modeling) and national regulatory and technical requirements. The classifier’s structure complies with the one recommended by ISO 12006-2:2015. Its composition has regard to the requirements that apply to the aggregation and unification of Russian classifiers, and it also benefits from the classifiers developed for and used by the construction industry. The proposed building information classifier has four basic categories and 21 basic classes. Conclusions. The proposed structure and composition of a building information classifier represent a unified and universal tool for communicating building information or presenting it in the standardized format in the consolidated information space designated for information models needed to manage life cycles of major construction projects.


Author(s):  
Prof. Amit Kale

Abstract: A construction project of any building is mainly based on 3 important steps that are planning, Cost Estimation of the building and proper execution of construction of the building. Construction cost estimation has the lion’s share of the research effort in construction management. The Objective is to analyze the effectiveness of various cost estimation methods by comparing traditional and various online websites. This study will provide more accurate estimates that save time and minimize errors. The research conducted will be helpful for estimation of construction, also proving how the introduction of IT sector in construction industry is turning out to be beneficial. Keywords: Estimation, Construction Management, Online Websites, minimize errors


2021 ◽  
Vol 4 (1) ◽  
pp. 50-64
Author(s):  
Ja’far A. Aldiabat Al-Btoosh

Variation order (VO) is one of the main issues faced by the construction industry in Jordan. Many researchers had investigated on the causes of VO and proposed procedures to minimize and control this issue; however, the VO is affecting the construction industry badly even at moment. Building Information Modeling (BIM) is a powerful management system that can make a significant difference in the project costs. However, BIM has not been examined as a tool to minimize the VO in Jordan. The main target of this study is to utilize BIM applications in reducing the effect of VO on the governmental projects in Jordan. In order to achieve this target, the researcher has designed a questionnaire to gather data related to VO causes and the BIM capability to solve this problem. The data collected from the questionnaires were analyzed statistically. The result from the analysis found that the consultant initiated the highest VO of 50% followed by the clients and the contractors of 20% and 10% unforeseen variation respectively. Moreover, it is found that BIM Design Applications, Facility Operations Simulation, Exploration Design Scenarios, BIM Design Detection and BIM Quantity Take-off and Cost Estimation were significantly capable of minimizing VO. The results show positive relationship with the application of BIM in minimizing VO in the construction industry in Jordan. © 2018. JASET, International Scholars and Researchers Association


Author(s):  
Aryani Ahmad Latiffi ◽  
Suzila Mohd ◽  
Juliana Brahim

Building Information Modeling (BIM) represents a new paradigm in the Malaysian architecture, engineering, and construction (AEC) industry. BIM technology provides virtual models (including 3-D models) to generate a building’s entire lifecycle. The model can also be used for analyzing design clashes, project scheduling, cost estimation, and facility management. The use of BIM in construction projects can reduce time to develop a project, reduce construction cost, and increase project quality. This paper aims to explore roles of BIM in the Malaysian construction industry. Semi-structured interviews were conducted with project consultants and BIM consultants involved in two government projects. The projects were the National Cancer Institute (NCI) Malaysia and Sultan Ibrahim Hall (formerly known as the Multipurpose Hall of Universiti Tun Hussein Onn Malaysia, or UTHM). The interviews revealed effects of BIM in both projects and potential improvement in implementing BIM in construction projects in Malaysia. A literature review and the interviews revealed that BIM is increasingly used and accepted by construction players in Malaysia, and is expected to grow in future.