scholarly journals THE SUSTAINABILITY OF HERITAGE BUILDINGS: REVITALIZATION OF BUILDINGS IN THE BANDUNG CONSERVATION AREA, INDONESIA

Author(s):  
NURTATI SOEWARNO ◽  
TAUFAN HIDJAZ ◽  
EKA VIRDIANTI
2020 ◽  
Vol 15 (2) ◽  
Author(s):  
Antung Deddy Radiansyah

Gaps in biodiversity conservation management within the Conservation Area that are the responsibility of the central government and outside the Conservation Areas or as the Essential Ecosystems Area (EEA) which are the authority of the Regional Government, have caused various spatial conflicts between wildlife /wild plants and land management activities. Several obstacles faced by the Local Government to conduct its authority to manage (EEA), caused the number and area of EEA determined by the Local Government to be still low. At present only 703,000 ha are determined from the 67 million ha indicated by EEA. This study aims to overview biodiversity conservation policies by local governments and company perceptions in implementing conservation policies and formulate strategies for optimizing the role of Local Governments. From the results of this study, there has not been found any legal umbrella for the implementation of Law number 23/ 2014 related to the conservation of important ecosystems in the regions. This regulatory vacuum leaves the local government in a dilemma for continuing various conservation programs. By using a SWOT to the internal strategic environment and external stratetegic environment of the Environment and Forestry Service, Bengkulu Province , as well as using an analysis of company perceptions of the conservation policies regulatary , this study has been formulated a “survival strategy” through collaboration between the Central Government, Local Governments and the Private Sector to optimize the role of Local Government’s to establish EEA in the regions.Keywords: Management gaps, Essential Ecosystems Area (EEA), Conservation Areas, SWOT analysis and perception analysis


The paper describes the main trends in the development of BIM technologies in the field of restoration and reconstruction of historical and cultural heritage buildings. The practical part of the paper presents the experience in using information modeling technologies when restoring the building, where the VI Congress of the Chinese Communist Party in Moscow took place. The use of laser scanning technologies made it possible to reproduce with high accuracy in the information model the original appearance of the building using Autodesk RevitR software. It is shown, how the use of information modeling technologies affects the duration of restoration process, taking into account the calculation of the structural scheme and bearing structures of the building, ensuring the identity of the decoration and the effective organization of electromechanical installation. Operating in a single BIM information environment makes it possible to continuously obtain reliable information on the project, which provides more effective information interaction and communication of participants compared to using traditional design methods.


2020 ◽  
Vol 65 (1) ◽  
pp. 17-26
Author(s):  
Gergely Olt ◽  
Adrienne Csizmady

AbstractThe growth of the tourism and hospitality industry played an important role in the gentrification of the post-socialist city of Budapest. Although disinvestment was present, reinvestment was moderate for decades after 1989. Privatisation of individual tenancies and the consequent fragmented ownership structure of heritage buildings made refurbishment and reinvestment less profitable. Because of local contextual factors and global changes in consumption habits, the function of the dilapidated 19th century housing stock transformed in the 2000s, and the residential neighbourhood which was the subject of the research turned into the so called ‘party district’. The process was followed in our ongoing field research. The functional change made possible speculative investment in inner city housing and played a major role in the commodification of the disinvested housing stock.


2019 ◽  
Vol 63 (1) ◽  
pp. 77-86 ◽  
Author(s):  
Bogusław Podhalański ◽  
Anna Połtowicz

Abstract The article discusses a project that features the relocation of the historic Atelier building, built by Krakow-based architect Wandalin Beringer (1839–1923) who was active in the early twentieth century, and the regeneration of a plot belonging to the Congregation of the Resurrection since 1885, which is located at 12 Łobzowska Street in Krakow. The method includes cutting the entire structure off at the foundation and then after reinforcing it with a steel structure transporting it in its entirety to the new location. The project included two possible variants of moving the building in a straight line, either by 21 or 59 metres and evaluates two projects of further regeneration, the adaptive reuse of the building as an exhibition and religious space as well as a proposal for the remodelling of the nearby plot that belongs to the Congregation into a space for meditation and as a recreational park. The aim of these measures is to prevent the demolition of this building, now over a century old, as a result of which a forgotten element of the cultural heritage of the city will be saved. This project was based on the results of analyses of the cultural and historical conditions of Krakow. The block of buildings in which the Atelier in question is located is a very attractive location, near to the very centre of Krakow, adjacent to residential, service and educational buildings. It is directly adjacent to the Monastery Complex of the Congregation of the Resurrection, listed as a heritage building under conservation protection (municipal registry of heritage buildings). In the second half of the twentieth century, the building was used as a workroom by artists such as Xawery Dunikowski and later by the sculptress Teodora Stasiak. The case of the Atelier may provide an inspiration for discussion as well as raising awareness among citizens and city authorities to avoid future situations in which cultural heritage may become forgotten or demolished.


2019 ◽  
Vol 1 (2) ◽  
pp. 142
Author(s):  
Saiful Kholik ◽  
Imas Khaeriyah

Inconsistency Regional Regulation No.14 of 2006 about marine conservation area of the island of Biawak, Gososng, which Cendekian provides protection but in fact failed to provide protection as evidenced by dredging island sandbar and cendekian conducted PT.Pertamina UP VI Balongan INDRAMAYU. The problem in this research How Formulation Policy Act No. 10 Year 2009 on the Indonesian Tourism with the Indramayu Regional Regulation No. 14 of 2006 regarding marine conservation area of the island of Biawak, Gososng, Cendekian And How Harmonization Act No. 10 of 2009 with the Indramayu Regional Regulation No. 14 of 2006 regarding formulation Act No. 10 Year 2009 on the Indonesian Tourism with the Indramayu Regional Regulation No. 14 of 2006 about marine conservation area of the island of Biawak, Gososng, Cendekian, the purpose of this research to understand and analyze the extent to which policy The findings of the community or field of law local governments about the environmental damage done by companies or individuals are not equal accordance with regional regulations in force, nor the Law in force so that the function of law in society indramayu not fit the mandate to establish a change and justice based Formulation public corporate criminal liability.Inskonsitensi happens to local regulation No.14 of 2006 makes no harmonized with the regulations of each other so that the impact of this inskonsistensi makes the sector particularly environmental law enforcement get uncertainties that result in coastal communities Indramayau.Conclusion Harmonization of regulations of the center and regions delivering the policy formulation of the rule of law area to comply with the regulations above in order to avoid inconsistency, the occurrence of this inconsistency resulted in the rule of law and justice for the indramayu, suggestion that the government should was nearly revise regulations related area, especially the government must dare to take action to give effect to the perpetrator deterrent effect rule-based running as well as possible.


2018 ◽  
Vol 2 (3) ◽  
pp. 84-92
Author(s):  
R. Obour, D. Amankwaa, A. Asare

Protected Areas (PAs) are created for the protection and maintenance of biological diversity, but many of Ghana’s PAs are subjectto severe pressures and threats, the main pressures being the illegal extraction of natural resources. Rattans are indisputablyone of the most important Non-Timber Forest Products (NTFPs) in Ghana’s Protected Areas that is without doubt one of thereasons for which it has drawn the attention of researchers. In this study the illegal rattan extraction patterns in the AnkasaConservation Area (ACA) in Ghana was inspected. Simple random sampling and Snowball sampling techniques were used. Datacollection employed the use of semi-structured questionnaires, interviews and field enumeration of rattans as well as an analysisof Effective Patrol Man-days (EPMDS) from 2004 to 2012. The results showed a significant positive correlation (r = 0.75, p<0.05, r2 = 0.557) between patrol effort and rattan extraction encounters. In addition, there was a general reduction in illegalrattan extraction encounters from 2004 to 2012 at a rate of 4.3 per year. The highest illegal rattan extraction incidences wererecorded in 2006 (76 encounters), 2005 (35 encounters), 2008 (22 encounters), 2004 (18 encounters) and the least incidencewere recorded in both 2010 (3 encounters) and 2011 (3 encounters).The research also revealed that Eremospatha macrocarpawas the most extracted rattan species followed by Laccosperma secundiflorum. The major rattan extraction and trade routesoriginate in the northern parts and in the area east of the reserve and also south of Draw River Forest Reserve. Generally, rattanpoaching in Ankasa Conservation Area has declined, but there are still human incursions in the northern part of the reserve. Thestudy recommended an intensification of patrols in the north of the reserve. Also, enrichment planting and Agroforestry practicesof inter-cropping rattans with seasonal crops should be pursued vigorously for the local communities.


1970 ◽  
Vol 11 (1) ◽  
Author(s):  
Mohan P. Devkota ◽  
Gerhard Glatzel

Effects of infection by the mistletoe Scurrula elata (Edgew.) Danser, on wood properties of its common host Rhododendron arboreum Sm., were studied in the Annapurna Conservation Area of Central Nepal Himalaya. Heavy infection by mistletoes invariably causes decline of the host. Infested branches show inhibition of growth, defoliation and eventual death of branch parts distal to the site of infection. Anatomical properties of wood were compared in samples of branches proximal to the infection and in uninfected branches. The hypothesis that infection induces changes in basic wood anatomy could not be proven. Vessel density, vessel area, percentage lumen area and mean vessel diameter of the wood of infested and uninfected branches did not show any significant differences. The studied anatomical parameters were not correlated to the diameter of the host branch. These results show that infection by S. elata did not cause any changes in basic wood anatomy of its host R. arboreum. It appears that the studied anatomical parameters of Rhododendron wood are fairly stable and are not changed by stress due to infection by mistletoes. The damage to the host distal to the infected area most likely results from an insufficiency of total conductive area to supply both mistletoe and host. Unfortunately we could not determine annual conductive area increment, because R arboreum does not develop usable annual tree rings in the climate of the study area. Key words: Himalayas, mistletoe. Rhododendron arboreum, Scurrula elata, water stress, wood anatomy. Ecoprint Vol.11(1) 2004.


Sign in / Sign up

Export Citation Format

Share Document