scholarly journals The Analysis of Unsignalized Intersection Road Performance at Manukan Wetan Surabaya City

2020 ◽  
Vol 4 (1) ◽  
pp. 37-46
Author(s):  
Muhan Fahri Irzadi ◽  
Sri Wiwoho Mudjanarko ◽  
Ikhsan Setiawan ◽  
Joewono Prasetijo ◽  
Hary Moetriono

Surabaya is the capital of the province of East Java and is the second largest city in Indonesia after Jakarta. As a city that will continue to develop, the mobility of the people is getting higher, as well as the progress of the current means of transportation which is increasing, causing traffic problems, one of which occurs at intersections. One of the intersections that will be reviewed is the Raya Manukan intersection. This study uses the MKJI 1997 guideline, with primary data collection by means of traffic conditions survey and secondary collection, namely data on the number of vehicle growth from the Department of Population and Civil Registry of Surabaya City. This study aims to determine the performance of the unsigned intersection at the Raya Manukan intersection. With this research data, as well as from the results of traffic analysis at the Raya Manukan intersection with the boundary from the Amd Street Intersection to the Buntaran Street Intersection. From the calculation results, it is obtained that the intersection capacity is 3750.9 pcu / hour, with a degree of saturation value of 0.8254. From the results of the analysis, the calculations that have been carried out have not been able to reach the desired degree of saturation value, which is as suggested by MKJI 1997.Therefore then an alternative is made with road widening engineering and produces a saturation degree value of 0.7493, so that the road widening on Raya Manukan Kulon is the best alternative in solving the capacity problem of Intersection Manukan.

2018 ◽  
Vol 2 (2) ◽  
pp. 36-44
Author(s):  
Riska Hawinuti

The appearanced of the peoples called “Supeltas" (Sukarelawan Pengatur lalulintas=Traffic Regulatory Volunteers) occurs along with the increasing number of queue vehicles that will turn towards the road. Supeltas itself is persons (not official from the government) who manage traffic flow expecting voluntari giffts from people passing through the road. Often, these activities broke the road rules and exacerbate existing congestion. The purpose of this study was to compare the performance of unsignalizes intersections between the existing and non-existent of "Supeltas" it self.             The requirement data needed are the primary data in the form of geometric data, traffic conditions, traffic and environmental conditions data, and secondary data in the form of population and location map. Traffic data collection is done using manual calculation for 2 periods on Tuesday, Wednesday and Thursday at 06.30-08.00 in the morning, noon 12.00-14.00 and afternoon at 16.30-18.30 WITA for each condition of rush hours. The calculation refers to MKJI 1997.             The calculation results obtained by the degree of saturation (DS) without the "Supeltas" amounting to 1,816 and with the provision "Supeltas" of 1,525, this DS value exceeds the IHMC ( Indonesian Highway Manual Capacity) previsions 0,75. It can be concluded that the existence of "Supeltas" made a positive impact to reduce the number of DS where it decreased 16.02%.


2019 ◽  
Vol 2 (1) ◽  
pp. 9
Author(s):  
R. Endro Wibisono ◽  
Adhi Muhtadi ◽  
Donny Cahyono

Krian Bypass intersection is a very crowded route because of its location near Sidoarjo and Mojokerto Regencies for the economic distribution of Surabaya City. There needs to be phase regulation, road widening or fly over so that the intersection traffic volume is not getting saturated. As a benchmark is the forecasting of traffic performance carried out for 3 years from 2018 to 2021. Based on the results of forecasting, the Krian Bypass intersection will decrease its DS value by widening the road so that the green time cycle will be low and turn right impact the DS value below 1 (one). The lowest 2018 DS is 1.61, while the highest DS is 2.49. While the lowest year 2021 DS is 2.72, while the highest DS is 4.85. For the solution with the right turn phase for each intersection to the north DS = 1.02, U-RT = 0.82, S = 1.38, S-RT = 0.69, T = 1.24, T-RT = 0.78, B = 1.79, B-RT = 0.04 . The solution for forecasting the flow of Krian Bypass in 2021. The calculation results made with effective width engineering, turn right and green time can reduce the DS value (Degree of Saturation) still shows DS value> 0.75 - 1, then fly over is constructed with a scenario of 20% vehicles through existing and 80% of vehicles through fly over. Year 2021 The impact of fly over shows North DS = 0.4, South = 0.51, East = 0.56, and West = 0.45


2020 ◽  
Vol 1 (1) ◽  
pp. 1
Author(s):  
Fitriyanti Ui ◽  
Yuliyanti Kadir ◽  
Marike Mahmud

The equivalent value of light vehicles (elv) is influenced by the size and speed of the vehicle, the greater the vehicle the equivalent value of light vehicles (elv) the higher, the higher the vehicle speed the equivalent value of light vehicles (elv) will be lower. The purpose of this study is to determine the equivalent value of light vehicles (elv) for motor tricycles vehicle (mtv) as part of the traffic and the performance of the Arif Rahman Hakim Road and Gorontalo City Manggis Road. The location of the study was conducted on Jalan Arif Rahman Hakim and Manggis Street. Primary data collected is data of traffic flow volume. The analysis was carried out using the simple linear regression analysis method and the 2014 Indonesian road capacity guidelines. From the calculation results obtained an equivalent value of light vehicles (elv) for motor  tricycles vehicle (mtv) on the Arif Rahman Hakim Road section of 0.55 and on the Manggis Road section obtained an equivalent value of light vehicles (elv) of 0.46. Then do the calculations to analyze the performance of the Arif Rahman Hakim and Manggis Roads obtained the degree of saturation (DS) <0.85. The DS scores show that both locations are very suitable to serve the flow of traffic during peak hours.Keywords—elv, motor tricycles vehicle , linear regression, road performance


2019 ◽  
Vol 13 (1) ◽  
pp. 36
Author(s):  
Marjono Marjono

Abstract :One of the problems felt by the people of Malang City is the problem of congestion and traffic system irregularities. Borbudur -Soekarno Hatta road, including roads that experience traffic problems, namely frequent traffic jams, especially at the time of departure or return to school, and hours of departure and return to work, this is because the road is the road access to the education area , trade and one of the access roads that lead to the center of Malang City. If this is not done immediately, the traffic problems will increase. A possible alternative to overcome this problem is to reduce motorbike users entering the road, by diverting some motorbike users to non-motorized bikes (bicycles) primarily for purposes of educational facilities, by providing special lanes for bicycles, which above the road (Sky Road). From the results of the analysis it can be seen that by providing a Bicycle Special Path above the Road Body (Sky Road), it can reduce the value of degree of saturation (DS) and can increase the level of service from C to B. Estimated cost of the main Sky road structure Rp. 9. 236,308 000 ,, - (Nine Billion Two Hundred Thirty-Six Million Three Hundred Eight Thousand Rupiahs) Keywords: special bike lanes, sky road, road performance


2018 ◽  
Vol 7 (1) ◽  
pp. 51-60
Author(s):  
Fitri Wulandari ◽  
Nirwana Puspasari ◽  
Noviyanthy Handayani

Jalan Temanggung Tilung is a 2/2 UD type road (two undirected two-way lanes) with a road width of 5.5 meters, which is a connecting road between two major roads, namely the RTA road. Milono and the path of G. Obos. Over time, the volume of traffic through these roads increases every year, plus roadside activities that also increase cause congestion at several points of the way. To overcome this problem, the local government carried out road widening to increase the capacity and level of road services. The study was conducted to determine the amount of traffic volume, performance, service level of the Temanggung Tilung road section at peak traffic hours before and after road widening. Data retrieval is done by the direct survey to the field to obtain primary data in the form of geometric road data, two-way traffic volume data, and side obstacle data. Performance analysis refers to the 1997 Indonesian Road Capacity Manual (MKJI) for urban roads. From the results of data processing, before increasing the road (Type 2/2 UD), the traffic volume that passes through the path is 842 pcs/hour and after road widening (Type 4/2 UD) the traffic volume for two directions is 973 pcs/hour, with route A equaling 528 pcs/hour and direction B equaling 445 pcs/hour. Based on the analysis of road performance before road enhancement, the capacity = 2551 pcs/hour, saturation degree = 0.331, and the service level of the two-way road are level B. Based on the analysis of the performance of the way after increasing the way, the direction capacity A = 2686 pcs/hour and direction B = 2674 pcs /hour, saturation degree for direction A = 0.196 and direction B = 0.166, service level for road direction A and direction B increase to level A


2019 ◽  
Vol 2 (2) ◽  
Author(s):  
Eko Prayitno ◽  
Veronika Veronika

The highway is one of the infrastructure for the smooth traffic. One part of the road that are considered necessary to be analyzed and evaluated is an intersection. Three Gadut intersection is non signalized intersection. The traffic flow is quite dense, and lack of discipline of road user factors competing space to pass the crossing, resulting in congestion is very influential on traffic conditions at peak hours in the morning, afternoon and evening. Prior to conducting the survey, the first to do is survey the condition of the intersection that includes geometric characteristics and traffic volume. From the analysis of environmental data, side friction factor to the junction of three Gadut is the criteria being. Rated capacity (C) the smallest is 3706.3 smp/hour, the degree of saturation of 1.1 smp/hour. This value is over the limit permitted values manually indonesian road capacity of 0.8 to 0.9 (1.1> 0.9), it is concluded that the traffic flow is the crossroads of three Gadut saturated traffic flow. The queue probability value between 128.8% - 157.4% with a total delay largest average 11.57 seconds/smp. It is concluded that the chances of a queue at the intersection of three Gadut very large, so it could cause congestion.


Author(s):  
Muhammad Ayung Tama ◽  
M. Ikhsan Setiawan ◽  
Sapto Budi Wasono

Along with the increasing number of the population of Sidoarjo, this has an i mpact on traffic volume, it occurs on the road of Gedangan roads to Buduran, therefore carried out the transfer of road access to the East Ring Road with specialized for heavy vehicles, due to the transfer of the road, it is necessary to perform the analysis of the East circumference road performance. The research aims to determine the magnitude of the influence of heavy vehicle volumes on the road performance of the East Ring road. The performance Of the east circumference traffic by counting the Level Of Service (LOS) and calculating the volume Of the vehicle compared to the road capacity (degree Of saturation). Traffic volume Data surveyed for 2 days (6 and 10 August 2020), for 6 hours per day at 06.00 – 08.00, 12.00 – 14.00, and 16.00 – 18.00. The analysis of road performance is using the Manual road Capacity (MKJI) method with a degree of saturation (DS) as the main indicator of road performance. The results of the analysis showed the performance of the road on the condition of the excitation point 1 the value of saturation of 0.61 and in point 2 of the value of saturation 0.97 and the result of service level of roadway 1 is C (steady current speed and motion-controlled vehicles) and in point 2 is E (current unstable speed sometimes stalled close request of capacity).


2012 ◽  
Vol 594-597 ◽  
pp. 1402-1406 ◽  
Author(s):  
Yue Zhang ◽  
Yun Long Zhao ◽  
Bao Yang Yu

In order to overcome the weakness of semi-rigidity base layer,the road performance of the SRX(Solution Road RomixSoilfix) stabilized base material and the mechanics response of asphalt pavement with the base layer stabilized by SRX have been studied in this paper. The CBR value and resilient modulus of SRX stabilized base material were given by indoor test. Based on the multiple layer elastic theory, both the mechanical responses of asphalt pavement structure with the SRX stabilized base and semi-rigid base were given, and according to the calculation results, the two kinds of pavement structure fatigue life were analyzed. The results have shown that the CBR value of SRX flexible material is greater than that of graded crushed stone; the SRX stable material can be used as pavement base layer, but the fatigue performance of SRX flexible base materials should be paid much attention.


2018 ◽  
Vol 7 (1) ◽  
pp. 11-23
Author(s):  
Cut Mutiawati ◽  
Lulusi Lulusi ◽  
Fitrika Mita Suryani ◽  
Sugiarto Sugiarto

On-street parking leads to reduced road capacity and decreased traffic performance of the certain road. Therefore, this study was conducted to evaluate the feasibility of on-street parking based on road performance. The study was conducted at Central Business District namely Peunayong, Banda Aceh. Based on the Indonesian Highway Capacity Manual (IHCM) one of the performance parameter values is Degree of Saturation (DS). The data needed for calculation of DS are the geometric conditions, traffic volume and the side frictions. The results indicate that on-street parking facilities on segment 2 of Khairil Anwar Street should be evaluated, as the DS value is greater than 0.75 (unstable road condition), by changing parking patterns into a parallel configuration or eliminating parking facilities. Furthermore, the parking configuration of R.A. Kartini Street also needs to be rearranged. Despite the stable road performance, this road is uncomfortable to pass because there is only one lane remained due to unfeasible parking patterns and existence of street market along the segment. The road performance of Khairil Anwar Street (segment 1), Ahmad Yani Street, W.R Supratman Street, T.P. Polem Street, Twk. Daudsyah Street and Ratu Safiatuddin Street is in stable condition, with DS < 0.75. This indicating that on-street parking facilities can be maintained. While as for the W.R. Supratman and Ahmad Yani Street should be evaluated in year of 2019 to avoid traffic jam along this corridors. 


CERUCUK ◽  
2021 ◽  
Vol 4 (1) ◽  
pp. 33
Author(s):  
Achmad Fajar ◽  
Yasruddin Yasruddin

The intersection of Jl. Perjuangan – Jl. Veteran is located in Martapura City, Banjar Regency, South Kalimantan Province. At this intersection there are only cautionary street lights or yellow lights, then the Intersection condition which is the road to residential areas, schools, shops, and traditional markets to support the occurrence of traffic jams and accidents            Primary data or data taken from the field include geometric conditions, environmental conditions, side barriers, traffic volume at the Intersection of Jalan Perjuangan - Jalan Veteran Martapura City. Secondary data includes the number of residents in Martapura City and data on the growth of the number of vehicles. Furthermore, the data samples were analyzed using the Indonesian Road Capacity Manual (MKJI, 1997) to find out whether Intersection performance is still feasible or not. If the results of the analysis show that the Intersection performance is no longer feasible, it is necessary to solve the problem.               At the intersection, Jl. Perjuangan - Jl. Veteran, Martapura City, Banjar Regency, on a unsignal condition, obtained a degree of saturation (DS) of 0.76 and delay (D) of all intersections of 12.7 seconds / smp with the Service Level Index at B, which indicates that at the intersection still has good conditions. After forecasting analysis, it is found that in the 6th year the degree of saturation (DS) is 1.11 and the whole delay is 26.21 seconds / smp with the Service Level Index in class D where the intersection has reached a bad condition or must be done intersection management analysis. By analyzing the form of intersection management when applied with a signalized intersection, the alternative 2 phase proposal is the best which is seen from the degree of saturation and delay with the value of Degree Saturation (DS) 0.74 and Delay (D) 18,33 seconds / smp with the intersection service level becomes C.


Sign in / Sign up

Export Citation Format

Share Document