scholarly journals PERFORMANCE ANALYSIS OF UNSIGNALIZED INTERSECTION ON PERJUANGAN AND VETERAN STREET MARTAPURA BANJAR DISTRICT

CERUCUK ◽  
2021 ◽  
Vol 4 (1) ◽  
pp. 33
Author(s):  
Achmad Fajar ◽  
Yasruddin Yasruddin

The intersection of Jl. Perjuangan – Jl. Veteran is located in Martapura City, Banjar Regency, South Kalimantan Province. At this intersection there are only cautionary street lights or yellow lights, then the Intersection condition which is the road to residential areas, schools, shops, and traditional markets to support the occurrence of traffic jams and accidents            Primary data or data taken from the field include geometric conditions, environmental conditions, side barriers, traffic volume at the Intersection of Jalan Perjuangan - Jalan Veteran Martapura City. Secondary data includes the number of residents in Martapura City and data on the growth of the number of vehicles. Furthermore, the data samples were analyzed using the Indonesian Road Capacity Manual (MKJI, 1997) to find out whether Intersection performance is still feasible or not. If the results of the analysis show that the Intersection performance is no longer feasible, it is necessary to solve the problem.               At the intersection, Jl. Perjuangan - Jl. Veteran, Martapura City, Banjar Regency, on a unsignal condition, obtained a degree of saturation (DS) of 0.76 and delay (D) of all intersections of 12.7 seconds / smp with the Service Level Index at B, which indicates that at the intersection still has good conditions. After forecasting analysis, it is found that in the 6th year the degree of saturation (DS) is 1.11 and the whole delay is 26.21 seconds / smp with the Service Level Index in class D where the intersection has reached a bad condition or must be done intersection management analysis. By analyzing the form of intersection management when applied with a signalized intersection, the alternative 2 phase proposal is the best which is seen from the degree of saturation and delay with the value of Degree Saturation (DS) 0.74 and Delay (D) 18,33 seconds / smp with the intersection service level becomes C.

2020 ◽  
Vol 2 (3) ◽  
pp. 34-40
Author(s):  
Widodo Budi Dermawan ◽  
Putri Oktavian Anwardi

Bekasi Regency is a Regency in West Java Province with a population of ± 3,500,023 Million People (Statistics Indonesia, 2017). Jl. Raya Karang Satria - Bekasi Regency is access to the main road to the city border, besides that access to residential locations, schools, which makes vehicle traffic especially during rush hour more congested by the activities on the side of the road such as the ups and downs of passengers from public transportation, as well as vehicles that stop causing long vehicle queues and can reduce travel time. To get primary data that is by surveying traffic volumes, geometric conditions, and environmental conditions. While secondary data obtained by searching using internet media. The analysis data used is guided by the Indonesian Road Capacity Manual Method (MKJI 1997). With this method, the capacity, degree of saturation, delay, and service level at the intersection can be known. From the results of the study obtained the largest degree of saturation (DS) value of 0.95 pcu / hour means that the value exceeds that required by MKJI (1997) which is <0.75 from the result of the average intersection delay (D intersection) of the largest 17 sec / pcu. This shows that the level of intersection C service is unstable flow because it has limited speed and movement and therefore it is necessary to review the level of intersection service. And researchers provide an alternative to improve the performance of these unsignalized intersections by changing FRSU from 0.98 to 1 and prohibiting right-turn traffic from both Major D to Minor C and from Minor C to Major B and removing side obstacles. For the road section, the highest degree of saturation (DS) value is obtained 0.74. This shows that the level of segment service is not stable. So an alternative is done to improve the level of segment performance by removing the original side obstacle factor of 0.86 to 1 on each arm.


2020 ◽  
Vol 25 (1) ◽  
pp. 32
Author(s):  
Jayanti Rizqi Novianka P ◽  
Khrisna Dwi Hidayati ◽  
Supriyadi Supriyadi ◽  
Junaidi Junaidi

Traffic volume in Semarang City has increased every year due to the increasing number of vehicles. Congestion that occurs at the T-junction intersection Jl. Brigjen Sudiarto - Jl. Majapahit is one of the impacts of high traffic growth and the traffic system is not functioning properly. By considering the geometric conditions of the road, traffic volume, side obstacles and the intersection environment which is a commercial area, it is necessary to analyze the cause of the congestion at the intersection. The research conducted was to conduct a field survey to obtain primary and secondary data which are then processed using intersection management. Planning uses the 1997 Indonesian Road Capacity Manual (MKJI) and uses the Excel 2013 program to process traffic data. Traffic data is obtained from recording the number of vehicles in the field for 3 days (April 29, 01 and May 4, 2019) during peak hours and presented in the form of a vehicle data table, then the behavior of the intersection can be analyzed. From the analysis results obtained value of the degree of saturation (DS) at the intersection of Jl. Brigjen Sudiarto - Jl. Majapahit 0.991. This value has exceeded the required value by the 1997 MKJI, DS ≤ 0.85. The analysis shows that the average traffic delay is 141,320 sec / pcu, so this intersection has a Service Level (LOS) F (&gt; 60).


Author(s):  
Muhammad Isradi ◽  
Nandhita Aulia Tarastanty ◽  
Widodo Budi Dermawan ◽  
Amar Mufhidin ◽  
Joewono Prasetijo

The unsignalized intersection which is located in Cileungsi District, precisely on Jalan Cileungsi Setu and Jalan Raya Narogong, is a commercial area with dense economic activity and densely populated settlements. As a result of the dense activity, congestion occurs due to the large number of vehicles passing the road, especially during peak hours, namely the morning and evening. Seeing this problem, an analysis is needed that aims to determine the volume, performance of roads, and unmarked intersections as measured by capacity, degree of saturation, and level of service.  In analyzing this study using the Indonesian Road Capacity Manual (MKJI) 1997 method which will determine the performance of roads and intersections without signs. The data needed in this research are primary data in the form of geometric road data, traffic volume, vehicle speed data, and side friction. As well as secondary data in the form of location maps, land use, and population data. From the results of data analysis and processing, the busiest traffic flow at the intersection occurred on Sunday, November 15, 2020 at 17.30 - 18.30 WIB, the saturation degree value was 1.17 with LOS F. By doing an alternative solution, the saturation degree value was 0.68 and LOS B with placing signs are prohibited from stopping around intersections, and prohibiting the flow of traffic turning right either from the main road D to the Minor C road or from the Minor C road to the main road B. On Jalan Raya Narogong, the degree of saturation is 0.74 LOS C service, this shows that the road sections do not exceed the figure required by MKJI 1997, namely ≤ 0.75.


2018 ◽  
Vol 2 (2) ◽  
pp. 36-44
Author(s):  
Riska Hawinuti

The appearanced of the peoples called “Supeltas" (Sukarelawan Pengatur lalulintas=Traffic Regulatory Volunteers) occurs along with the increasing number of queue vehicles that will turn towards the road. Supeltas itself is persons (not official from the government) who manage traffic flow expecting voluntari giffts from people passing through the road. Often, these activities broke the road rules and exacerbate existing congestion. The purpose of this study was to compare the performance of unsignalizes intersections between the existing and non-existent of "Supeltas" it self.             The requirement data needed are the primary data in the form of geometric data, traffic conditions, traffic and environmental conditions data, and secondary data in the form of population and location map. Traffic data collection is done using manual calculation for 2 periods on Tuesday, Wednesday and Thursday at 06.30-08.00 in the morning, noon 12.00-14.00 and afternoon at 16.30-18.30 WITA for each condition of rush hours. The calculation refers to MKJI 1997.             The calculation results obtained by the degree of saturation (DS) without the "Supeltas" amounting to 1,816 and with the provision "Supeltas" of 1,525, this DS value exceeds the IHMC ( Indonesian Highway Manual Capacity) previsions 0,75. It can be concluded that the existence of "Supeltas" made a positive impact to reduce the number of DS where it decreased 16.02%.


2018 ◽  
Vol 2 (1) ◽  
pp. 10
Author(s):  
Riska Hawinuti

Jalan Martapura Lama is an alternative road connecting Banjarmasin, Martapura and Banjarbaru city and it is under the administration of Banjar Regency. The existence of Sungai Lulut Market in Kilometer 05 consistently causing congestion to the area, especially during peak hours. The purpose of this study is to determine the impact of market activities on the performance of Jalan Martapura Lama KM 05 indicated by the degree of saturation (DS) and the value of the level of road service. The method of primary data collection was by conducting traffic surveys and measuring geometric conditions in the site manually on Tuesday to Thursday, 06-08 February 2018 during the morning rush hour (07.00-08.00 a.m), the noon hour (12.00-14.00 p.m) and afternoon rush hour (16.00 to 18.00 p.m) while the secondary data was obtained from the internet. The calculation refers to Indonesian Highway Capacity Manual (MKJI) 1997. From the calculation results it can be concluded that the impact of market activities on the performance of Jalan Martapura Lama KM 05 indicated by the degree of saturation (DS) and the value of road level of service with the optimum DS is 0,68 with the value of level of road service is C on Thursday’s afternoon rush hour and the minimum DS is 1.34 with the value of level of road service is F on Wednesday’s morning rush hour. With a total frequency of occurrences and side friction class of 571 frequencies, the maksimum friction is incoming and outgoing vehicles on area alongside roads (EEVs) of 446 occurrences on Tuesday in the morning rush hour.


2019 ◽  
Vol 2 (1) ◽  
pp. 23
Author(s):  
Eko Adi Prayitno ◽  
Zainal Abidin ◽  
Miftachul Huda

Jl. Raya Nginden - Jl. Raya Panjang Jiwo intersection is an intersection that has a high density level, especially at peak hour, it can be seen from the length of the queue. The aim of this study is to determine the intersection performance in existing conditions and the next 5 (five) years and give a recommendation for improving an intersection performance. For analyzing intersection traffic performance using Indonesian Road Capacity Guidelines method (PKJI 2014). Primary data in this study are traffic volume, intersection geometric conditions, and cycle times. While secondary data in this study are population data, vehicle growth data, and traffic data from CCTV. Data retrieval in one day of weekday and one day of weekend. The results show that the degree of saturation (DJ) of existing (in 2018) on Wednesday, North approach is 1.45, South 1.35, West 0.76, East 1.49 and existing DJ on Sunday approaching North 0.80, South 0.88, West 0.69 and East 1.12. For traffic performance in the next five years (in 2023) with existing cycle and phase times, DJ on Wednesday, North approach is 2.36, South 2.20, West 1.24, East 2.43 and DJ values on Sunday, North approach is 1.30, South 1.42, West 0.95 and East 1.81. For traffic performance improving at the intersection is made an alternative with changing the cycle time and movement phase which show the results in existing DJ (2018) on Wednesday for North approach is 0.86, South 0.92, West 0.77, East 0.43 and DJ on Sunday for North approach is 0.52 , South 0.67, West 0.52 and East 0.28. For the next five years' traffic performance (in 2023), DJ on Wednesday for North approach is 1.45, South 1.67, West 1.35, East 0.91 and existing DJ on Sunday for North approach is 0.88, South 1.22, West 0.92 and East 0.60.


2021 ◽  
Vol 8 (2) ◽  
pp. 110
Author(s):  
Ema Hidayati ◽  
Suzanna Ratih Sari

Rumah sebagai tempat yang layak huni untuk memenuhi kebutuhan penggunanya hingga dapat menjadi aset bagi pemiliknya. Kebutuhan hunian merupakan kebutuhan pokok yang harus dipenuhi pada setiap keluarga. Pembangunan rumah didalam kawasan perumahan dapat menjadi alternatif bagi keluarga atau masyarakat untuk memenuhi kebutuhan tersebut. Pihak developer mendirikan perumahan dengan menyediakan rumah untuk masyarakat berpenghasilan rendah. Fasilitas – fasilitas yang mendasar seperti jaringan jalan, jaringan listrik, jaringan air bersih dan kotor sudah disediakan oleh pihak developer. Fasilitas ini dapat berkembang dengan bertambahnya penghuni untuk membuat kehidupan pada perumahan ini. Tujuan dari penelitian ini untuk mengevaluasi sarana dan prasarana kondisi eksisting dengan standar SNI dan mengembangkan atau menambah kebutuhan sarana dan prasarana yang belum sesuai atau belum ada di perumahan ini. Penelitian ini menggunakan metode kualitatif pendekatan deskriptif evaluatif dengan membandingkan kondisi eksisting dengan standar SNI. Pengumpulan data dilakukan dengan data primer dan sekunder. Data primer diperoleh dari obesrvasi dan wawancara dengan warga perumahan sedangkan data sekunder diperoleh dari standar SNI, buku dan jurnal terkait. Hasil dari penelitian ini yaitu sarana yang belum sesuai dengan standar SNI yaitu sarana pendidikan, sarana olahraga dan RTH. Sedangkan prasarana yang belum sesuai yaitu jaringan jalan dan jaringan air bersih.THE QUALITY OF HOUSING INFRASTRUCTURE AND FACILITIES GRIYA HARAPAN WELERI The house as a livable place to meet the needs of its users so that it can become an asset for the owner. Housing needs are basic needs that must be met in every family. The construction of houses in residential areas can be an alternative for families or communities to meet these needs. The developer builds housing by providing houses for low-income people. Basic facilities such as road networks, electricity networks, clean and dirty water networks have been provided by the developer. This facility can expand with more residents to make a living in this housing. The purpose of this study is to evaluate the existing condition facilities and infrastructure with SNI standards and to develop or add to the need for facilities and infrastructure that are not appropriate or do not exist in this housing. This study uses a qualitative descriptive evaluative approach by comparing the existing conditions with SNI standards. Data collection is done with primary and secondary data. Primary data were obtained from observations and interviews with housing residents, while secondary data were obtained from SNI standards, related books and journals. The results of this study are facilities that are not in accordance with SNI standards, namely educational facilities, sports facilities and green open space. Meanwhile, the infrastructure that is not suitable is the road network and clean water network.


2019 ◽  
Vol 2 (1) ◽  
pp. 41-50
Author(s):  
Helwiyah Zain ◽  
Meliyana Meliyana ◽  
Muhaimin Muhaimin

Simpang Lamlo is one of No-Signal Three-way Junctions in National Road from Banda Aceh to Medan as a Main road and is connected directly to the Cross-Regional Road that is from Beureuneun to Geumpang as the Minor Road and vice versa. The purpose of this study is to analyze the performance of the No-Signal Three-Way Junctions by using the Indonesian Highway Capacity Manual 1997. Data required in this study are primary and secondary data. The primary data is in the form of the condition data of traffic, intersection geometric, and environment. Secondary data includes the population growth and the map of the road network. Traffic data were collected by using video recording on Monday, Wednesday and Saturday at 7.00 a.m. – 9.00 a.m., 12.00 p.m. – 2.00 p.m and 5.00 p.m. – 7.00 pm. These data were processed by using Microsoft Excel based on MKJI 1997 and and the results were made in the form of tables and graphics. From the tables and graphics, it could be known for the traffic volume, composition, and the peak hours occured in the intersections. The calculation on the peak hour with the current highest peak is on Monday, 5.00 p.m. - 6:00 p.m. in which the traffic volume at the intersection is 2737 (smp / hour). The capacity value of the existing condition in Simpang Lamlo is 2762 (smp / hour). The traffic delay in the intersection is 11,63 (det / smp). The degree of saturation at the existing condition is 0.99, higher than the provision in Indonesian Highway Capacity Manual which is 0,75. The intersection delay value is 15.64 (det / smp) and the queue chance at the intersection is 39,43% to 77,98%,


2018 ◽  
Vol 7 (1) ◽  
pp. 51-60
Author(s):  
Fitri Wulandari ◽  
Nirwana Puspasari ◽  
Noviyanthy Handayani

Jalan Temanggung Tilung is a 2/2 UD type road (two undirected two-way lanes) with a road width of 5.5 meters, which is a connecting road between two major roads, namely the RTA road. Milono and the path of G. Obos. Over time, the volume of traffic through these roads increases every year, plus roadside activities that also increase cause congestion at several points of the way. To overcome this problem, the local government carried out road widening to increase the capacity and level of road services. The study was conducted to determine the amount of traffic volume, performance, service level of the Temanggung Tilung road section at peak traffic hours before and after road widening. Data retrieval is done by the direct survey to the field to obtain primary data in the form of geometric road data, two-way traffic volume data, and side obstacle data. Performance analysis refers to the 1997 Indonesian Road Capacity Manual (MKJI) for urban roads. From the results of data processing, before increasing the road (Type 2/2 UD), the traffic volume that passes through the path is 842 pcs/hour and after road widening (Type 4/2 UD) the traffic volume for two directions is 973 pcs/hour, with route A equaling 528 pcs/hour and direction B equaling 445 pcs/hour. Based on the analysis of road performance before road enhancement, the capacity = 2551 pcs/hour, saturation degree = 0.331, and the service level of the two-way road are level B. Based on the analysis of the performance of the way after increasing the way, the direction capacity A = 2686 pcs/hour and direction B = 2674 pcs /hour, saturation degree for direction A = 0.196 and direction B = 0.166, service level for road direction A and direction B increase to level A


2019 ◽  
Vol 33 (1) ◽  
pp. 39-50
Author(s):  
Sakinah Fathrunnadi Shalihati ◽  
Esti Sarjanti

The occurrence of animal accidents is one of the consequences of physical environmental interaction of animal in terms of their movement from one place to another and non physical environment in the form of transportation usage by human. Accidents happened to animals can affect the structure of the food chain. It would be a matter if it occurred continuously because some species of animals that were important to the ecosystem would not exist anymore. The records of the frequency of animal accident and habitat along Jalan Padamara-Karangcegak by geospatial could be used to analyze the correlation between the dominance of animal species getting the accidents and the potential width of the habitat owned along the road. Qualitative description was used as the method of the research. It was from the primary data analysis of the distribution of accident and secondary data of the land use from Google Earth of  satellite image which was then processed by Geographic Information System. The results obtained during observations from April to July 2016 showed that there was a correlation between the animal habitat and the accidents happened. The animal with a wider habitat dominated the accidents occurred than animals with no extensive habitat.


Sign in / Sign up

Export Citation Format

Share Document