Critical Path Method–Line of Balance Model for Efficient Scheduling of Repetitive Construction Projects

2001 ◽  
Vol 1761 (1) ◽  
pp. 124-129 ◽  
Author(s):  
Tarek Hegazy
2021 ◽  
Vol 9 (1) ◽  
pp. 17-24
Author(s):  
Mia Syafrina ◽  
Fandy Bestario Harlan

Construction projects are generally the most high-risk businesses, especially shipbuilding projects. Efforts to reduce the risk can be done by minimizing the potential risk. This study aims to see potential high risk and prevent delays in the completion of ship construction using the Critical Path Method CPM at PT. XYZ. By using the Critical Path Method CPM critical paths can be given more attention so that they will not interfere ship construction projects. In addition, it is also a form of anticipation if there is a delay, it is possible to reschedule.


2020 ◽  
Vol 12 (21) ◽  
pp. 8918
Author(s):  
Kyunghwan Kim

Delays by limited supply of resources are common in many construction projects and may cause serious monetary disputes between project participants. Since the dispute resolution may require unnecessary additional time and cost, preventing delays in advance is an important goal in sustainable construction project management. To prevent delays, a feasible plan must be implemented, which reflects limited resources and provides reliable activity information. For this purpose, this study proposes a generalized resource-constrained critical path method (eRCPM). It consists of three steps to identify resource-dependent activity relationships (resource links) based on the result of resource-constrained scheduling (RCS) under multiple resource constraints. Compared to the existing resource-constrained critical path methods, the eRCPM has the advantage of identifying resource links irrespective of the applied RCS technique because it is based on the result rather than the RCS process. Further, this study presents a Microsoft (MS) Excel-based half-automated prototype system that is linked using file export and import functions to both P6 and MS Project software packages. The detailed process of the eRCPM algorithm and the operation process of the prototype system are described using an example schedule. Through a case study, it was demonstrated that eRCPM appropriately identifies the necessary resource links and provides reliable total floats.


1999 ◽  
Vol 26 (2) ◽  
pp. 242-247 ◽  
Author(s):  
Paul Wing Ming Tam ◽  
Ekambaram Palaneeswaran

Scheduling of construction projects is normally performed with the critical path method (CPM). The popular CPM/PERT network techniques are based on the assumption that sufficient resources will be available when needed to complete all project activities on schedule. This unrealistic assumption can lead to ineffective resource usage and project delays. For scheduling of the project activities with resource constraints, other algorithms have to be used. This technical note first outlines the suitability of ranked positional weight method (RPWM), a heuristic resource scheduling method, to construction project scheduling. It then focuses on a new heuristic technique, the enhanced positional weight method (EPWM), which is an improved version of the RPWM. Some interesting comparisons between the results given by Primavera, Microsoft Project, RPWM, and EPWM are also presented.Key words: ranked positional weight method, enhanced positional weight method, and critical path method.


2015 ◽  
Vol 22 (7) ◽  
pp. 944-953 ◽  
Author(s):  
Donghoon LEE ◽  
Dong-Sub KIM ◽  
Gwang-Hee KIM ◽  
Sunkuk KIM

The finish work on high-rise residential buildings is performed simultaneously with mechanical and electrical construction work, which results in frequent work interference and delay. This significantly hinders efficient schedule management. Critical Path Method (CPM) is inefficient when applied to high-rise residential building projects in which work is repeatedly carried out for each floor. Line-of-Balance (LOB) is widely used for its effectiveness in managing repetitive work. LOB was developed into TACT and eTACT (enhanced-TACT) to combine heterogeneous works con­tinuously. In particular, the eTACT schedule management method has an advantage in that it is capable of systemati­cally connecting detailed construction, mechanical and electrical construction projects using a work planning template. This study evaluates the time reduction effect of the eTACT method for a high-rise residential building. A comparative analysis of data on 102 cases of non-applied projects and 44 cases of projects using the eTACT method over a period of 10 years is presented to verify its effectiveness. The result shows that finish work time was reduced by 25% or about 53 days on average.


2015 ◽  
Vol 17 (4) ◽  
Author(s):  
Sutanto Sutanto

Sutanto, in this paper explain that line of Balance is a variation of the linear scheduling method that allows the operating balance so that all activities can continue. In the various International leteratur usually shown as Line of Balance scheduling tool that is only suitable for the project - a project that is composed of repetitive activities, and is not suitable for non-repetitive projects. Network method is introduced towards the end of the 1950s by a team of engineers and mathematicians from Dupont company is working with the Rand Corporation, in an effort to develop a management control system. These systems are intended to plan and control a large number of which have a complex dependency relationship in the construction of engineering design problems and maintenance. Businesses - emphasized efforts to seek methods to minimize the costs, in conjunction with the completion of a period of activity. The system was then known as the critical path method (Critical Path Method/CPM). Research application method Line of Balance (LOB) and Critical Path Method (CPM) scheduling activities in residential construction and the impact on the field of technical constraints is one solution . Conclusions obtained from the results of the research, the use of residential construction projects activities scheduling with Line of Balance method combined with the Critical Path Method method would have added value. Keywords: Housing Development, Application lob and CPM scheduling method.


2014 ◽  
Vol 20 (4) ◽  
pp. 537-547 ◽  
Author(s):  
Atilla Damci ◽  
Gul Polat

A review of the recent literature on the models that focus on resource leveling in Critical Path Method networks shows that different objective functions have been used to optimize resource utilization. The main objective of this study is to investigate the impacts of using different objective functions on resource utilization histograms in Critical Path Method networks. For this purpose, nine different resource leveling objective functions were optimized via a genetic algorithm-based model. The model was developed using actual data obtained from a steel framed industrial building construction project. It was found that each of these objective functions generates different resource utilization histograms. In order to determine the improvement levels achieved by resource leveling using nine different objective functions, the improvement percentage in each parameter and the average improvement percentage for each objective function were calculated. Even though the objective function that involves the minimization of the sum of the square of the deviations in daily resource usage provided the best average improvement percentage in the studied case, another objective function(s) may provide better average improvement percentage in different projects. The contractor should consider all objective functions for resource leveling and select the one(s) that provides the best average improvement percentage.


1998 ◽  
Vol 25 (3) ◽  
pp. 424-436 ◽  
Author(s):  
Paul Wing Ming Tam ◽  
Pujitha Bandara Gamagedera Dissanayake

Construction projects are commonly scheduled by the critical path method or its similar methods, with the assumption that resources are unlimited. The ranked positional weight method, which may be used for project scheduling and resource allocation for both constrained and unconstrained resource scheduling, is found to be relatively easy in application. In construction, the availability of resources is sometimes limited and this leads to an extension of project duration. The critical path method and similar approaches cannot provide an answer in this scenario. A bridge construction project is used to illustrate how the method can be applied.Key words: scheduling, resource allocation, ranked positional weight method.