scholarly journals KEBIJAKAN PENGENDALIAN RESIKO KESELAMATAN DAN KESEHATAN KERJA PADA TENAGA KERJA (Studi pada Pekerjaan Pengangkatan di Crane Barge Palong III PT. Tanjungpura Balikpapan)

2019 ◽  
Vol 4 (2) ◽  
Author(s):  
Komeyni Rusba ◽  
Hardiyono Hardiyono ◽  
Sri Purwanti ◽  
Daniel Daniel ◽  
Andi Muh Dzul Fadli

The process of identifying risks and risks is part of policy and risk. Risk control is carried out for efforts to prevent occupational diseases and accidents. To learn about ways to handle risks to the crane barge. This research is a descriptive study, from the time process of this research is a direct research. This research is located at Palong III barge crane PT. Putra Tanjungpura Balikpapan. The method used by researchers in making measurements, information used by companies. In this study, primary data can be used at the same time and direct data that works on location and secondary data obtained from the company. Risk assessment is carried out using the JRA method (Job Risk Assessment and Risk Matrix. In the risk process, finding 12 types of risks, namely 5 risks with low risk levels, 2 risks with moderate levels, 4 risks with risk levels and 1 risk with risk level Things which must be done regularly to achieve different goals, and the results of risks that are effective and efficient. Keywords: Policy, Risk control policy, risk assessment

Author(s):  
Indra Oditya Putra

 The laboratory is a place of activities for research, education and product quality test. The laboratory is also a place to conduct experiments and research that has a source of danger and can cause work accidents. The research objectives are aware of risks and hazards in the laboratory, hence the need to identify hazards, risk assessments, and risk control. Data collection method used is observasional, based on the analysis of properties and data analysis hence this research including descriptive research. In review from the time of the study including cross sectional. The sample of this research is 6 laboratory personnel in 2 laboratories. The data used are the primary data from the observation, interview and questionnaire and secondary data obtained from the Faculty of Pharmacy. The results of the study can identify as many as 8 hazards. In the risk assessment obtained the highest danger level is high risk. High risk risk level of 3 hazards ie HCl solution spills, nitric acid spills, sulfuric acid spills. This laboratory is still quite dangerous because it is still found high risk. The existing risk control in the laboratory is well implemented and needs to be improved by the use of Personal Protective Equipment (PPE). Keywords: hazard identification, risk assessment, risk control


Author(s):  
Teguh Satrio ◽  
M. Robiul Fuadi

 Introduction: Laboratory is a place for the analysis of a material that aims for research, education, quality testing and diagnose diseases. Working in the laboratory will always be faced with a variety of risk and sources of danger that can cause workplace accidents. The purpose of this study was to determine the hazards, hazard identification, risk identification, risk assessments, risk control, and residual risk in working at the clinical pathology laboratory. Method: Data collection method used was observational and descriptive research. When viewed from the time of the study, this study was cross sectional. The data used were primary and secondary data, in which the primary data were obtained by direct observation on site, while secondary data were obtained from SOPs available in the laboratory. Results: The results of the study can identify as many as 9 hazards. In the assessment of risk, it obtained the highest level of danger which was high risk. The level of risk was as high as 3 hazards including needling, splattered patient samples, and reagents or hazardous substances. Conclusion: The conclusion from the study is that this laboratory is classified as dangerous because it finds some of the highest risk levels, which is high risk. The existing risk control in this laboratory is quite complete and good, but it needs to be an improvement in terms of compliance in wearing Personal Protective Equipment (PPE) to minimize the risk.Keywords: clinical pathology laboratory, hazard identification, risk assessment 


Author(s):  
Vadim B. Alekseev ◽  
Nina V. Zaitseva ◽  
Pavel Z. Shur

Despite wide legislation basis of regulating relations in work safety and workers’ health, one third of workplaces demonstrate exceeded allowable normal levels of workers’ exposure to occupational hazards and present occupational risk for health disorders.In accordance to national legislation acts, evaluation should cover factors of occupational environment and working process, and occupational risk is understood in context of mandatory social insurance. This approach has been formed due to mostly compensatory trend in legal principles of work safety in Russia by now. Implementation of new preventive concept of work safety, based on idea of risk management for workers, necessitates development of legal acts that regulate requirements to evaluation of occupational risk and its reports with consideration of changes in Federal Law on 30 March 1999 №52 FZ “On sanitary epidemiologic well-being of population”.Those acts can include Sanitary Rules and Regulations “Evaluation of occupational risk for workers’ health”, that will contain main principles of risk assessment, requirements to risk assessment, including its characteristics which can serve as a basis of categorizing the risk levels with acceptability.To standardize requirements for informing a worker on the occupational risk, the expediency is specification of sanitary rules “Notifying a worker on occupational risk”. These rules should contain requirements: to a source of data on occupational risk level at workplace, to informational content and to ways of notifying the worker. Specification and implementation of the stated documents enable to fulfil legal requirements completely on work safety — that will provide preservation and increase of efficiency in using work resources.


Author(s):  
Grant Duwe

As the use of risk assessments for correctional populations has grown, so has concern that these instruments exacerbate existing racial and ethnic disparities. While much of the attention arising from this concern has focused on how algorithms are designed, relatively little consideration has been given to how risk assessments are used. To this end, the present study tests whether application of the risk principle would help preserve predictive accuracy while, at the same time, mitigate disparities. Using a sample of 9,529 inmates released from Minnesota prisons who had been assessed multiple times during their confinement on a fully-automated risk assessment, this study relies on both actual and simulated data to examine the impact of program assignment decisions on changes in risk level from intake to release. The findings showed that while the risk principle was used in practice to some extent, the simulated results showed that greater adherence to the risk principle would increase reductions in risk levels and minimize the disparities observed at intake. The simulated data further revealed the most favorable outcomes would be achieved by not only applying the risk principle, but also by expanding program capacity for the higher-risk inmates in order to adequately reduce their risk.


Author(s):  
Raditya Angga Pradipta

Logging the forest production is a high risk work. The condition of the forest acreage is difficult, the imbalance between the tools used by condition of the field and the skills of workers can lead to accidents. One of supporting job in the process of logging the forest production is the operation of the chainsaw that has hazards and risks which must be controlled. The main objective of this research was to risk assessment in the operational of the chainsaw in the work to cutting down trees in Perhutani KPH Madiun. This research was an observational research that conducted using cross sectional design and descriptive analysis. Data were used primary data based on interviews, observations and secondary data collected from the company. This research performed based on work activities of operating chainsaw. The result showed that based on idetification of hazards in activities of operating chainsaw in cutting trees, there were18 hazards Risk assessment showed that from 18 pure risks, there were 4 low risks,7 medium risks and 7 high risks. The conclusion from this research is the risk most dominant obtained from the risk assessment is high risk and risks while each one had the amount of 7 danger or 39 % of all the potential here hazards, to at a job should not be continued, work that needs to be set repeated or attempts to control at work to reduce the risk. Control must be reviewed for conformity before work began.Keywords: cut timber, identification hazards, risk assessment


2021 ◽  
Vol 6 (2) ◽  
Author(s):  
Alfina Fitri Damayanti ◽  
Nina Aini Mahbubah

Zero accident was considered as the primary occupational health and safety value in manufacturing and service enterprises.  PT. ABC provided  electrical and instrument services, including a low-voltage installation, high-voltage installation and an instrument installation. This company is known to excellent electricity and instrument service providers across the country . Moreover, men’s power is used as a primary source to maintain  these kind  of services. Installation projects depend not only on the high working speed, but also on  high working  accuracy within  certain timeframes . As a result, work  accidents  have occurred with a classification varying from minor to fatal accidents.  The purpose of this research is to identify potential hazards to assess risk levels and  obtain recommendations for  preventing accident. The HIRARC method is employed as a research approach. This research is initiated through Hazard Identification, Risk Assessment and Risk Control.  This research identified that two hazards were classified as  extreme risk, three hazards as high- risk, eight hazards as moderate risk , and two hazards have been identified as low risk . Furthermore, a number of action lists have been suggested in order to minimize accident rates and finally the working conditions are designed to maintain zero accidents.


Author(s):  
Jean Jacques KUBWIMANA

Due to the perishable nature and biological nature of the production process there is difficulty in scheduling the supply of vegetables to market demand. The vegetables are subjected to higher prices and quantity risks with changing consumers’ demand and production conditions. The core focus of this study was to reach, measure, and analyzing the marketing risk level of vegetables produced in Rubavu District, Rwanda. The study based on a survey of 90 vegetable sellers. At least 30 couple of wholesalers and middlemen visited Rubavu District to trade the vegetables for various retails. Primary data collected through structured questionnaires and secondary data sources used. A Five-point Likert associated with the bivariate analysis was used to rank the risk level while the full model of Linear Regression Analysis and factor analysis were used to identifier the majors’ factors associated with the risk in vegetable marketing in Rwanda. The mean score results derived based on Likert-Scales, indicated that “low seasonal product prices, weak market channels, poor logistics, and market communications, poor product handling and packaging, lack of storage and higher perishability’ identified to be the most important sources of risk. Therefore, the use of forwards’ contracts; getting market information, sell at crude prices due to perishability, contractual arrangements, maintaining good relationships and restoring the storage network system were of significant concerns for overcoming the recognized risks.   Keywords: Risk, Risk analysis, Likert Scale, Marketing risk, Vegetable Marketing risk, and Risk Management.


Author(s):  
Arini Amalia Rahma ◽  
Siti Mutmainah

<em>Internal control is a process carried out by the company to provide adequate guarantees for achieving control objectives. The objective of this Research is to find out the current internal control system that is applied at PT Pegadaian (Persero) Kaliwungu Branch Service in the process of granting credit. The next objective is to identify whether the components of internal control applied are according to COSO. The data used are qualitative data, primary data, and secondary data. The methods of collecting data are interview, observation, and questionnaire. For writing the Research uses descriptive and exposition methods. There are five components of internal control according to the Committee of Sponsoring Organization (COSO), they are Control Environment, Risk Assessment, Control Activities, Information and Communication, and Monitoring. The results of the discussion in the Research shows that the application of the internal control system for granting credit at PT Pegadaian (Persero) Kaliwungu Branch Service is in accordance with COSO internal control component, but the Control Environment and Control Activities has not been fully implemented.</em>


2021 ◽  
Vol 2021 ◽  
pp. 1-9
Author(s):  
Guo Yangyudongnanxin

In order to improve the effectiveness of financial credit risk control, a financial credit risk control strategy based on weighted random forest algorithm is proposed. The weighted random forest algorithm is used to classify the financial credit risk data, construct the evaluation index system, and use the analytic hierarchy process to evaluate the financial credit risk level. The targeted risk control strategies are taken according to different risk assessment results. We compared the proposed method with two other methods, and the experimental results show that the proposed method has higher classification accuracy of financial credit data and the risk assessment threshold is basically consistent with the actual results.


2020 ◽  
Vol 5 (1) ◽  
pp. 29
Author(s):  
Nidya Wisudawati ◽  
Rurry Patradhiani

Risiko kecelakaan kerja merupahal hal yang tak dapat dihindari dari kegiatan proyek pembangunan. PT Gran Anugerah Wijaya merupakan pengusaha pengembang perumahan yang sedang mengerjakan proyek pembangunanan 58 unit rumah tipe 36 yang berlokasi di daerah Palembang. Dari hasil pengamatan lapangan, alur proses pembangunan rumah yang dikerjakan meliputi pemasangan pondasi, pemasangan dinding, pemasangan kusen kayu, pemasangan rangka atap dan finishing. Hazard Identification, Risk Assessment dan Risk Control telah dilakukan dlaam penelitian ini. Hasil yang didapat bahwa terdapat 27 potensi risiko dengan risk level diantara rendah hinggi tinggi. Pengendalian risiko yang bisa dilakaukan untuk mengurangi bahaya kerja terhadap karyawan bangunan diantaranya substitusi, administrasi dan Alat Pelindung Diri (APD).