On the definition of thermo-physical properties of drilling mud and cement slurry in well drilling

2020 ◽  
pp. 15-18
Author(s):  
O.I. Gasymov ◽  

A great number of studies are dedicated to the definition of heat conductivity of drilling muds and cement slurries. It should be noted that existing works on the specification of heat conductivity of the drilling mud are based on either experimental or theoretical studies in which well conditions are reflected incompletely. Considering all above-mentioned aspects, the practical interest consists in the definition of thermal conductivity of drilling muds and cement slurries in well drilling on the basis of the data obtained at the wellhead during unsteady processes execution. The paper offers the method of definition of the heat conductivity of drilling mud and cement slurry flows based on the data of temperature change at the well entry and exit through the time, which can be recorded directly at the wellhead. The method is based on the accurate solution of reverse problem of thermal exchange in the movement of drilling mud and cement slurry via Laplas transformation.

2019 ◽  
Vol 12 ◽  
pp. 107-111
Author(s):  
A.N. Ivanov ◽  
◽  
O.V. Kryukov ◽  
Vu Van Hung ◽  
Mai Duy Khanh ◽  
...  
Keyword(s):  

1981 ◽  
Vol 38 (3) ◽  
pp. 268-274 ◽  
Author(s):  
Charles D. Derby ◽  
Jelle Atema

The effects of whole drilling muds on the normal activity of walking leg chemosensory neurons of the lobster, Homarus americanus, were examined using extracellular neurophysiological recording techniques. Exposure of legs for 3–5 min to 10 mg/L drilling mud suspended in seawater altered responses to food odors of 29% of the chemoreceptors examined (data pooled for the two drilling muds tested); similar exposure to 100 mg/L drilling mud resulted in interference with 44% of all receptors studied. The effects of both of these concentrations are statistically significant, although they are not different from each other. Interference was usually manifested as a marked reduction in the number of action potentials in a response. In one preparation, the exposure to drilling mud caused a change in the temporal pattern of the spikes without affecting the total number of spikes. Other chemosensory neurons were excited by 10 mg/L drilling mud itself. However, not all chemoreceptors are inhibited by these drilling muds since responses to feeding stimuli were recorded from the legs of lobsters that had been exposed to drilling mud for 4–8 d before the neurophysiological experiments.Antennular and leg chemoreceptors are important in eliciting normal feeding behavior in lobsters. Although behavioral assays have demonstrated that feeding behavior is altered following exposure to drilling muds and petroleum fractions, there is no conclusive proof for a causal relationship between chemoreceptor interference and behavioral deficits. The two techniques complement each other as pollution detection assays, perhaps reflecting a common interference mechanism.Key words: chemoreception, drilling mud, feeding behavior, lobster, pollution, neurophysiology


2016 ◽  
Vol 2016 ◽  
pp. 1-9
Author(s):  
Marcin Lackowski ◽  
Marek Tobiszewski ◽  
Jacek Namieśnik

This work presents the construction solution and experimental results of a novel desorber for online drilling mud gas logging. The traditional desorbers use mechanical mixing of the liquid to stimulate transfer of hydrocarbons to the gaseous phase that is further analyzed. The presented approach is based on transfer of hydrocarbons from the liquid to the gas bubbles flowing through it and further gas analysis. The desorber was checked for gas logging from four different drilling muds collected from Polish boreholes. The results of optimization studies are also presented in this study. The comparison of the novel desorber with a commercial one reveals strong advantages of the novel one. It is characterized by much better hydrocarbons recovery efficiency and allows reaching lower limits of detection of the whole analytical system. The presented desorber seems to be very attractive alternative over widely used mechanical desorbers.


2021 ◽  
Vol 66 (05) ◽  
pp. 192-195
Author(s):  
Rövşən Azər oğlu İsmayılov ◽  

The aricle is about the pipe stick problems of deep well drilling. Pipe stick problem is one of the drilling problems. There are two types of pipe stick problems exist. One of them is differential pressure pipe sticking. Another one of them is mechanical pipe sticking. There are a lot of reasons for pipe stick problems. Indigators of differential pressure sticking are increase in torque and drug forces, inability to reciprocate drill string and uninterrupted drilling fluid circulation. Key words: pipe stick, mecanical pipe stick,difference of pressure, drill pipe, drilling mud, bottomhole pressure, formation pressure


Author(s):  
Marcio Yamamoto ◽  
Motohiko Murai ◽  
Shotaro Uto ◽  
Tomo Fujiwara ◽  
Shigeo Kanada ◽  
...  

The pipes are playing an important role in the offshore environment. Risers and pipelines are widely deployed by the petroleum industry for the well drilling and hydrocarbons production. Whereas during drilling, a mixture of drilling mud and solids in suspension (rock cuttings) flows through the drilling riser; during the production, mono or multiphase flow (comprising oil, water and gas) takes place within the production system. However up till now, most of investigations on offshore pipelines and risers have neglected the effects of the internal flow and have focused mainly on the interaction among pipe’s structure, hydro-dynamic forces and offshore platform’s motion. This paper deals with the interaction between the pipe structure and its internal flow. An experimental analysis was carried out, in the Deep Sea Basin of the National Maritime Research Institute (Japan), using a model of 10 m length. In this experiment, a mono-phase fluid of liquid and another bi-phase fluid of liquid and solids in suspension are used as the internal flow fluid and a parametric analysis using the internal flow rate and pipe’s oscillating frequency was carried out. Discussion about the experimental results is also included.


2021 ◽  
Vol 1 (2) ◽  
Author(s):  
Osei H

High demand for oil and gas has led to exploration of more petroleum resources even at remote areas. The petroleum resources are found in deeper subsurface formations and drilling into such formations requires a well-designed drilling mud with suitable rheological properties in order to avoid or reduce associated drilling problems. This is because rheological properties of drilling muds have considerable effect on the drilling operation and cleaning of the wellbore. Mud engineers therefore use mud additives to influence the properties and functions of the drilling fluid to obtain the desired drilling mud properties especially rheological properties. This study investigated and compared the impact of barite and hematite as weighting agents for water-based drilling muds and their influence on the rheology. Water-based muds of different concentrations of weighting agents (5%, 10%, 15% and 20% of the total weight of the drilling mud) were prepared and their rheological properties determined at an ambient temperature of 24ᵒC to check their impact on drilling operation. The results found hematite to produce higher mud density, plastic viscosity, gel strength and yield point when compared to barite at the same weighting concentrations. The higher performance of the hematite-based muds might be attributed to it having higher specific gravity, better particle distribution and lower particle attrition rate and more importantly being free from contaminants. The water-based muds with hematite will therefore be more promising drilling muds with higher drilling and hole cleaning efficiency than those having barite.


Author(s):  
Marcio Yamamoto ◽  
Motohiko Murai ◽  
Katsuya Maeda ◽  
Shotaro Uto

Nowadays pipes are widely deployed in the offshore environment especially in the petroleum industry where rigid and flexible pipes are used for well drilling and hydrocarbon production. Whereas during drilling, a mixture of drilling mud, rock cuttings and sometimes gas flows through the drilling riser, during production mono or multiphase (comprising oil, water and gas) flow takes place within the system. However up till now, most of the studies on offshore pipelines and risers have been focused on the pipe structure and its interaction with hydrodynamic forces and offshore platforms. In particular for numerical computation studies and reduced scale model experiments, the pipe is usually modeled as a tensioned beam and sometimes only the internal pressure is taken into account with other effects due to its internal flow being neglected. This paper deals with the interaction between the pipe structure and its internal flow. In order to verify the internal flow effects, an experimental analysis was carried out not using a reduced scale model. In particular, mono-phase fluid flows into the pipe and a parametric analysis using the flow rate was carried out. Discussion about the experimental results and numerical applications is also included.


2021 ◽  
Author(s):  
Raymond Saragi ◽  
Mohammad Husien ◽  
Dalia Salim Abdullah ◽  
Ryan McLaughlin ◽  
Ian Patey ◽  
...  

Abstract A study was carried out to examine formation damage mechanisms caused by drilling fluids in tight reservoirs in several onshore oil fields in Abu Dhabi. Three phases of compatibility corefloods were carried out to identify potential to improve hydrocarbon recovery and examine reformulated/alternate drilling muds and treatment fluids. Interpretation was aided by novel Nano-CT quantifications and visualisations. The first phase examined the current drilling muds and showed inconsistent filtrate loss control alongside high levels of permeability alteration. These alterations were caused by retention of drilling mud constituents in the near-wellbore and incomplete clean-up of drilling mud-cakes. Based upon these results, reformulated and alternate drilling muds were examined in Phase 2, and there was a positive impact upon both filtrate loss and permeability, although the Nano-CT quantifications and visualisations showed that drilling mud constituents were still having an impact upon permeability. Candidate treatment fluids were examined in Phase 3, with all having a positive impact and the best performance coming from 15% HCl and an enzyme-based treatment. The interpretative tools showed that these treatments had removed drilling mud-cakes, created wormholes, and bypassed the areas where constituents were retained. The compatibility corefloods on tight reservoir core, alongside high-resolution quantifications and visualisations, therefore identified damaging mechanisms, helped identify potential to improve hydrocarbon recovery, and identify treatment fluid options which could be used in the fields.


2021 ◽  
Author(s):  
Ajita Ang C K Ang ◽  
Avinash A Kumar Kumar ◽  
Syazwan B A Ghani Ghani ◽  
Nann N N Maung Nann ◽  
M Hanif Yusof Yusoff ◽  
...  

Abstract Infill well drilling was planned and executed to increase production in a significantly depleted field. A total of 3 infill wells were drilled in 2 different layers of reservoir for an offshore operator in Myanmar. In the offset wells, water production had become significantly higher throughout. Previously all offset wells in this field were completed with open hole sand screens was chosen to isolate the water bearing sand in the sand reservoir below. Pore pressure prognosis were calculated from offset well depletion rate. Reservoir formation properties is assumed to be same throughout the field. The first well was drilled and was found that there were two gas water contacts through the 3 targeted sand layers. The gas water contact and WUT (Water Up To) in this well were unexpected and it was prognosed that these gas water contact are there due to compartmentalization. The 7" liner were set and cemented throughout these reservoirs. The cement job went as per the plan and there were no losses recorded during cementing. However, initial cement log did not show isolation. 2 more runs of cement log were performed 6 days and 10 days later while conducting intervention activities on other wells. All three cement log came to the same conclusion, showing no isolation throughout the annulus of the 7" production liner. Significant amount of gas had percolated into the annulus over time. Despite no evidence of poor cement slurry design observed during running various sensitivity studies and post-job lab tests final cement log, which was conducted under pressure and confirmed no hydraulic isolation. A cement remedial job was planned and an investigation was conducted to identify the plausible root causes. This paper explains on the root causes of poor cement presence in the annulus, and the remedial work that took place to rectify the issue.


2020 ◽  
pp. 26-29
Author(s):  
T.Sh. Salavatov ◽  
◽  
Y.I. Safarov ◽  
S.A. Musayeva ◽  
◽  
...  

The paper makes an effort to specify the relaxation time of subsurface rocks composing the borehole wall during geothermal well drilling justifying theoretical and practical researches. To solve mentioned issues, a theory of dumping of pressure fluctuations in non-stationary motion of drilling mud in the circulation system of well, based on the data of change of pressure and time consumption is applied and as a result a calculation formula obtained. The method has been tested in the well No 245 in Muradkhanly area.


Sign in / Sign up

Export Citation Format

Share Document