Speeding up Based on the Process Optimization of High Voltage Business Expanding

2014 ◽  
Vol 556-562 ◽  
pp. 1950-1953
Author(s):  
Juan Li ◽  
Hai Ying Jiang

As the primary link and the accepting link of power supply and sale, the quality of business expansion is directly related to the economic benefits and social profile of the power company. By many measures, such as reducing the link of process and delayering business expansion process, realizing multi link synchronous operation and integrally operating all qualified links, the process of high voltage business expansion project is optimized. The practice proves that these measures effectively reduce the average time of power access, and improve the level of power supply service. Keywords: power supply company; business expanding; process optimization; average power access time

2021 ◽  
Vol 23 (3) ◽  
pp. 10-17
Author(s):  
Ivan Vujović ◽  
Željko Đurišić ◽  

Telecommunications and computer equipment centralisation trends for the purpose of achieving economic benefits, usage of technological innovations and new technical solutions implementation leads to the requirements for building bigger Data Centres (DCs). An increase in the size of the DC facility i.e. the number of racks inside occupied with equipment and the number of devices that enables the proper functioning of that equipment leads to necessarily power energy requirements increasing for power supply. For the DCs that require a large amount of energy, the building of their own, usually renewable energy sources (RES) is cost-effective. In such a caser, RES are primary and Power System (PS) is secondary and redundant power source. A concept of a DC primary powered from RES is presented in this paper. Generated electrical energy in RES is transmitted in PS through high voltage switch-gears (SGs) while DC is power supplied from PS through low voltage, medium voltage and high voltage SG-s. For the purpose of realisation of such facility, it is necessary to enable adequate conditions related to geographical location, physical access to the facility, possibility of connecting to the PS and possibility of connecting to the telecommunications centres. Based on carried out researches related to RESs potential, available roads, power supply infrastructure and telecommunication infrastructure, development conditions for DC on location near to Belgrade, close to power transformer station „Belgrade 20“ are analysed in this paper. From the aspect of DC power supply, proposed solution includes wind farm, solar plant and landfill gas power plant, as well as related SGs. Telecommunication connections from DC to the PS and other important telecommunication centres are provided. These connections are realised through optical cables placed next to the electrical lines and cables, and, when that is not possible, placed independently in the ground. The design of the DC interior is given and calculations of the required electrical energy for the power supply of the equipment and devices in the facility are performed. Based on calculation results, capacity calculation of the RES and calculation of SGs are performed. Design of the interior optical connections inside DC is also given. A General assessment of the investment and economics of building such DC are given at the end of the paper.


Electronics ◽  
2019 ◽  
Vol 8 (10) ◽  
pp. 1137 ◽  
Author(s):  
Neretti ◽  
Ricco

In this paper a high-voltage sinusoidal power supply controlled by Arduino DUE micro-controller is described. This generator can feed a dielectric barrier discharge (DBD) load with sinusoidal voltages up to 20 kV peak and frequencies in the range 10–60 kHz, with a maximum output power of 200 W. Output voltage can be produced either in a continuous mode, or with on/off modulation cycles, according to treatment/application requirements. This power source is equipped with on-board diagnostics used to measure the output voltage and the charge delivered to the load. With a sample frequency of 500 kHz, Arduino DUE allows to evaluate both the high voltage and the average power feeding the discharge without the use of an expensive external measurement setup. Lissajous techniques are utilized to calculate discharge average power in a quasi-real-time manner. When a load is connected to high-voltage terminals, a self-tuning procedure is carried out to obtain the best working frequency. This parameter allows to minimize power-electronic component stress and to maximize generator efficiency.


Author(s):  
M. Bassoui ◽  
M. Ferfra ◽  
M. Chraygane

In order to validating the new three-phase High voltage power supply for microwave generators with one magnetron by phase, this paper presents a new validation approach to evaluate the proposed model with several evaluations. This approach is based on the calculation and measurement of the performance and the power factor of this new three-phase power supply, also the study of the operation of this new system in case of failure. The design of this power supply is composed of new three-phase transformer with magnetic shunt, supplying by phase a voltage doubler cell composed of a capacitor and a diode. Each cell in turn, supplies a single magnetron. In this paper we have presented the new three-phase transformer by its equivalent model; it’s a π  quadruple  model composed  of  storable  inductances  able  to translating the nonlinear saturation phenomena for stabilization of  the  magnetron  current. The voltage and current curves obtained by simulation with MATLAB SIMULINK are in good conformity with those obtained by experimental of conventional power supply using a single phase transformer for one magnetron.<strong> </strong>The same curves will allow us to plot the instantaneous power absorbed by each magnetron. This leads to determine the average power emitted by each magnetron, and establish the balance of the power microwave generator by computing its performance which is compared to that obtained from experimental. After that we will compute the power factor of this power supply and we will study its operation in case of failure of one or two magnetrons.


Author(s):  
M. Bassoui ◽  
M. Ferfra ◽  
M. Chraygane

In order to validating the new three-phase High voltage power supply for microwave generators with one magnetron by phase, this paper presents a new validation approach to evaluate the proposed model with several evaluations. This approach is based on the calculation and measurement of the performance and the power factor of this new three-phase power supply, also the study of the operation of this new system in case of failure. The design of this power supply is composed of new three-phase transformer with magnetic shunt, supplying by phase a voltage doubler cell composed of a capacitor and a diode. Each cell in turn, supplies a single magnetron. In this paper we have presented the new three-phase transformer by its equivalent model; it’s a π  quadruple  model composed  of  storable  inductances  able  to translating the nonlinear saturation phenomena for stabilization of  the  magnetron  current. The voltage and current curves obtained by simulation with MATLAB SIMULINK are in good conformity with those obtained by experimental of conventional power supply using a single phase transformer for one magnetron.<strong> </strong>The same curves will allow us to plot the instantaneous power absorbed by each magnetron. This leads to determine the average power emitted by each magnetron, and establish the balance of the power microwave generator by computing its performance which is compared to that obtained from experimental. After that we will compute the power factor of this power supply and we will study its operation in case of failure of one or two magnetrons.


2020 ◽  
Vol 10 (10) ◽  
pp. 44-51
Author(s):  
Yury Yu. SKOROKHOD ◽  
◽  
Sehgey I. VOL’SKIY ◽  

The power circuit arrangements of on-board high-voltage static converters fed from a 3000 V AC single-phase network that in the general case produce multi-channel AC and DC output voltages are considered. The basic technical requirements posed to such converters are formulated. The general structural diagram of high-voltage converters with improved electric power consumption quality is given. Possible power circuit arrangements for the high-voltage converter input unit based on single-phase input current correction devices are considered. A classification and criteria for comparative evaluation of the possible power circuit arrangements of these devices are proposed. The information presented in the article will be of interest for specialists engaged in designing on-board electrical systems involving high-voltage converters that must comply with strict requirements for the quality of consumed single-phase input current.


2015 ◽  
Vol 9 (1) ◽  
pp. 253-262
Author(s):  
Liu Zhongfu ◽  
Zhang Junxing ◽  
Shi Lixin ◽  
Yang Yaning

As for the wide application of arc suppression coil to the grounding in neutral point of mine high voltage grid, grid leakage fault rules and harmonic characteristics of the neutral point grounding system through arc suppression coil are analyzed, the selective leakage protection program “zero-sequence voltage starts, fifth harmonics of grid zerosequence voltage and zero-sequence current are extracted for phase comparison” is proposed, and corresponding fifth harmonic extraction circuit and power direction discrimination circuit are designed. The experimental results show that the protective principle applies not only to the neutral point insulated power supply system, but also to the power supply system in which neutral point passes arc suppression coil, which can solve selective leakage protection problems under different neutral grounding ways, improving the reliability of selective leakage and guaranteeing the stability of the action value.


Energies ◽  
2018 ◽  
Vol 11 (8) ◽  
pp. 1978 ◽  
Author(s):  
Sanna Uski ◽  
Erkka Rinne ◽  
Janne Sarsama

Microgrids can be used for securing the supply of power during network outages. Underground cabling of distribution networks is another effective but conventional and expensive alternative to enhance the reliability of the power supply. This paper first presents an analysis method for the determination of microgrid power supply adequacy during islanded operation and, second, presents a comparison method for the overall cost calculation of microgrids versus underground cabling. The microgrid power adequacy during a rather long network outage is required in order to indicate high level of reliability of the supply. The overall cost calculation considers the economic benefits and costs incurred, combined for both the distribution network company and the consumer. Whereas the microgrid setup determines the islanded-operation power adequacy and thus the reliability of the supply, the economic feasibility results from the normal operations and services. The methods are illustrated by two typical, and even critical, case studies in rural distribution networks: an electric-heated detached house and a dairy farm. These case studies show that even in the case of a single consumer, a microgrid option could be more economical than network renovation by underground cabling of a branch in order to increase the reliability.


Energies ◽  
2021 ◽  
Vol 14 (2) ◽  
pp. 486
Author(s):  
Marek Stawowy ◽  
Adam Rosiński ◽  
Jacek Paś ◽  
Tomasz Klimczak

The article presents issues related to the determination of the continuity quality of power supply (CQoPS) for hospital electrical devices. The model describing CQoPS takes into account power redundancy. The uncertainty modeling method based on the certainty factor (CF) of the hypothesis was used to establish the single-valued CQoPS factor. CQoPS modeling takes into account multidimensional quality models and physical stages of power. The quality models take into account seven dimensions that make up CQoPS (availability, appropriate amount, power supply reliability, power quality, assurance, responsiveness, security). The model of power stages includes five of these stages (power generation, delivery to recipient, distribution by recipient, delivery to device, power-consuming device). To date, when designing hospital power systems, the applied reliability indicators revealed limitations because they do not consider all the possible factors influencing the power continuity. Estimating the supply continuity quality with the use of the uncertainty modeling proposed in this article allows for taking into account all possible factors (not just reliability factors) that may affect supply continuity. The presented modeling offers an additional advantage, namely, it allows an expanded evaluation of the hospital supply system and a description using only one indicator. This fact renders the evaluation of the supply system possible for unqualified staff. At the end of the article, some examples of calculations and simulations are presented, thus showing that the applied methods give the expected results.


Sign in / Sign up

Export Citation Format

Share Document