Impact of Sedimentation Counter Measure on the Performance of Flood Control: A Case Study of Wonogiri Reservoir

2018 ◽  
Vol 881 ◽  
pp. 78-85 ◽  
Author(s):  
Rachmad Jayadi ◽  
Istiarto ◽  
Ansita Gukitapingin Pradipta

The Wonogiri Reservoir with 1.343 km2 catchment area has a major problem of sedimentation. To overcome this issue, a new spillway has been built and closure dike is being constructed to localize sediment inflow from the Keduang watershed. Study on the effect of the closure and overflow dike on the reservoir operation in flood period is necessary to evaluate the performance of flood control related to the flood risk in the downstream area of the reservoir. For this purpose, the reservoir routing simulation model was developed under two condition, namely old condition and new condition with the new spillway and closure dike. The reservoir routing simulation was conducted for three inflow hydrographs of 60 and 500 years return period, and probable maximum flood (PMF). The results show that the presence of closure dike causes the peak outflow discharge increases to 1.45%, 75.18% and 56.28% for inflow hydrograph of 60 years, 500 years return period and PMF, respectively. Furthermore, the maximum water level also increases by 0.3 m, 1.9 m and 0.9 m for those three new design floods respectively. In order to reduce the dam overtopping failure chance of the 500 years return period flood, it is recommended to operate full opening of the new spillway gate when the water level reaches elevation +135.6 m MSL.

2018 ◽  
Vol 18 (5) ◽  
pp. 1852-1860 ◽  
Author(s):  
Yuqin Gao ◽  
Yu Yuan ◽  
Huaizhi Wang ◽  
Zhenxing Zhang ◽  
Liu Ye

Abstract Flood control with polders is prevalent in East China. Their impact on flood processes is critically important for flood control, but has not been well documented. The Qinhuai River Basin was selected as the study area. A Hydrologic Engineering Center – River Analysis System (HEC-RAS) hydraulic model was developed to simulate and predict storm flood processes and the associated impact of polders. The study shows that the HEC-RAS model is capable of simulating the impact of polders on flood processes in the Qinhuai River Basin. The polders increased the water level outside of the polders. The polders in upstream watersheds have a greater impact on the water level than polders close to basin outlets when individually distributed. The maximum water level at Dongshan section shows an increasing trend for different sized flood with the increasing number of polders in the basin, and a linear increasing trend associated with urbanization. The smaller the flood scale is, the greater the maximum water level changes.


2013 ◽  
Vol 17 (8) ◽  
pp. 3023-3038 ◽  
Author(s):  
A. I. Requena ◽  
L. Mediero ◽  
L. Garrote

Abstract. A multivariate analysis on flood variables is needed to design some hydraulic structures like dams, as the complexity of the routing process in a reservoir requires a representation of the full hydrograph. In this work, a bivariate copula model was used to obtain the bivariate joint distribution of flood peak and volume, in order to know the probability of occurrence of a given inflow hydrograph. However, the risk of dam overtopping is given by the maximum water elevation reached during the routing process, which depends on the hydrograph variables, the reservoir volume and the spillway crest length. Consequently, an additional bivariate return period, the so-called routed return period, was defined in terms of risk of dam overtopping based on this maximum water elevation obtained after routing the inflow hydrographs. The theoretical return periods, which give the probability of occurrence of a hydrograph prior to accounting for the reservoir routing, were compared with the routed return period, as in both cases hydrographs with the same probability will draw a curve in the peak-volume space. The procedure was applied to the case study of the Santillana reservoir in Spain. Different reservoir volumes and spillway lengths were considered to investigate the influence of the dam and reservoir characteristics on the results. The methodology improves the estimation of the Design Flood Hydrograph and can be applied to assess the risk of dam overtopping.


Author(s):  
I G. Suryadinata P ◽  
I N. Norken ◽  
I G. B. Sila Dharma

Tukad Mati is one of the rivers in the province of Bali that unfolds and flows in Badung regency and Denpasar. Inundation due to flooding is a problem that often occurs in this region during the rainy season. In an effort to overcome problems of flooding have been many studies carried out so as to produce flood control alternatives such as normalization, diversion channels and retarding basins. Retarding basin is one of flood control alternative that has not been much studied. In this study conducted a simulation of flood prevention alternative with retarding basin at Tukad Mati, by the hydrology approach method and hydraulics using HEC-RAS 4.0 program applications. Simulations performed on the current river flow conditions (existing condition) and to the existing conditions with the retarding basin, according to the detail design of retarding basin in the city of Denpasar and evaluate the effectiveness of the retarding basin in the river basin flood control of Tukad Mati. Flood control by retarding basin based on simulations with the 2 (two) years flood return period, resulting in a reduction of water level by an average of 0.42 meters or an average of 12% of the maximum water level in the conditions without retarding basin, which occurred in along the grooves on the lower reaches of the retarding basin and inundation waters still occur in some places, particularly in the downstream of Umadui Dam. Economic analysis of both the analysis of Benefits/Cost produces a parameter of BCR, NPV and IRR are not meet the feasibility requirements. The effective retention of retarding basin based on simulation results are 282,630.00 m3 with the ability to flood accommodate for 3-4 hours. In terms of economic development retarding basin is not feasible in terms of comparative costs and benefits


2006 ◽  
Vol 86 (1) ◽  
pp. 47-54 ◽  
Author(s):  
Ana Milanovic

Lepenica river basin territory has became axis of economic and urban development of Sumadija district. However, considering Lepenica River with its tributaries, and their disordered river regime, there is insufficient of water for water supply and irrigation, while on the other hand, this area is suffering big flood and torrent damages (especially Kragujevac basin). The paper presents flood problems in the river basin, maximum water level forecasts, and flood control measures carried out until now. Some of the potential solutions, aiming to achieve the effective flood control, are suggested as well.


2019 ◽  
Vol 27 (1) ◽  
pp. 344-353
Author(s):  
Abdul-Hassan K. Al-Shukur ◽  
Ranya Badea’ Mahmoud

One of the most common type of embankment dam failure is the dam-break due to overtopping. In this study, the finite elements method has been used to analyze seepage and limit equilibrium method to study stability of the body of an earthfill dam during the flood condition. For this purpose, the software Geostudio 2012 is used through its subprograms SEEP/W and SLOPE/W. Al-Adhaim dam in Iraq has been chosen to analysis the 5 days of flood. It was found that the water flux of seepage during the flood reaches about 8.772*10-5. m3/sec when the water level 146.5 m at 2nd day. Seepage through the embankment at maximum water level increased by 55.1 % from maximum water level. It was concluded that the factor of safety against sliding in downstream side decrease with increasing water level and vice versa. It was also concluded that the deposits are getting more critical stability during the conditions of flood when the factor of safety value reaches 1.219 at 2nd day.


2018 ◽  
Vol 4 (3) ◽  
pp. 189
Author(s):  
Dian Wahyu Jatmiko

Madukoro area located on the northern coast of Semarang City has been prone to flooding caused by rainfall and seawater high-tide. Ineffective flood control management and land subsidence are considered as the cause of this problem. In order to understand land subsidence effect and flood control performance, location, water surface height of the inundation in West Flood Canal, western part of Madukoro area need to analyze. Flood analysis was conducted using HEC-HMS software and rational method. Flow hydraulics on five channels, i.e. the West Flood Canal, Ronggolawe River, Karangayu River, Arterial Channel and Madukoro were analyzed using HEC-RAS software. Increasing levee level and additional water pumps in Madukoro and Ronggolawe were chosen as flood control alternatives. Its performance was investigated through software simulation. The results showed total runoff volume in all drainage channels for 2-years return period discharge was about 80% of capacity with 0.7 m water depth. Runoff volume in West Flood Canal with 50-years return period discharge was about 40%. Land subsidence 4 cm/year affected the water level increase on West Flood Canal. Operation of 2 - 4 pump units could not significantly decrease water level at flood peak, yet increase flood recession time 6 - 8 hours. 


2021 ◽  
Vol 10 (1) ◽  
pp. 1-8
Author(s):  
Dyah Pratiwi Kusumastuti ◽  
Husna Alghoida

Abstract Dams have many benefits such as irrigation, flood prevention, power generation and even tourism, especially in areas where the dam is located. So that the benefits received can last a long time, in the planning, it must be analyzed for stability, seepage discharge that occurs and the safety of the piping. The piping hazard safety figures in this study were calculated using the Harza method for maximum water level conditions, normal water levels, fast receding and empty dams at sta 0 + 150, sta 0 + 200, sta 0 + 250 and sta 0 + 300. Based on the calculation results, it is found that the safety of piping hazards without filters with the grouting method do not meet the requirements safety factor, especially in conditions of maximum water level, normal water level and fast receding. In order for the safety of piping hazard in order to meet the requirements, a filter is applied under the dams. The filter is applied so that the piping hazard safety figure meets the requirements of all water level conditions and all station is 80 cm deep.   Keywords: safety factor, piping, Harza method, filter   ABSTRAK Bendungan memiliki banyak manfaat seperti irigasi, pencegah banjir, pembangkit listrik bahkan pariwisata khususnya pada wilayah dimana bendungan tersebut berada. Agar manfaat yang diterima dapat berlangsung lama maka dalam perencanaannya wajib dianalisis terhadap stabilitas, debit rembesan yang terjadi maupun keamanan dari piping. Angka keamanan bahaya piping pada penelitian ini dihitung dengan menggunakan metode Harza untuk kondisi muka air maksimum, muka air normal, surut cepat dan bendungan kosong di sta 0+150, sta 0+200, sta 0+250 serta sta 0+300. Berdasarkan hasil perhitungan didapatkan bahwa angka keamanan bahaya piping tanpa penggunaan filter dengan metode grouting tidak memenuhi persyaratan angka keamanan khususnya pada kondisi muka air maksimum, muka air normal dan surut cepat. Agar angka keamanan bahaya piping memenuhi persyaratan maka diaplikasikan filter dibawah tubuh bendungan. Filter yang diaplikasikan agar angka keamanan bahaya piping memenuhi persyaratan diseluruh kondisi muka air dan seluruh sta adalah dengan kedalaman 80 cm.   Kata kunci: angka keamanan, piping, metode Harza, filter Abstract Dams have many benefits such as irrigation, flood prevention, power generation and even tourism, especially in areas where the dam is located. So that the benefits received can last a long time, in the planning, it must be analyzed for stability, seepage discharge that occurs and the safety of the piping. The piping hazard safety figures in this study were calculated using the Harza method for maximum water level conditions, normal water levels, fast receding and empty dams at sta 0 + 150, sta 0 + 200, sta 0 + 250 and sta 0 + 300. Based on the calculation results, it is found that the safety of piping hazards without filters with the grouting method do not meet the requirements safety factor, especially in conditions of maximum water level, normal water level and fast receding. In order for the safety of piping hazard in order to meet the requirements, a filter is applied under the dams. The filter is applied so that the piping hazard safety figure meets the requirements of all water level conditions and all station is 80 cm deep.   Keywords: safety factor, piping, Harza method, filter   ABSTRAK Bendungan memiliki banyak manfaat seperti irigasi, pencegah banjir, pembangkit listrik bahkan pariwisata khususnya pada wilayah dimana bendungan tersebut berada. Agar manfaat yang diterima dapat berlangsung lama maka dalam perencanaannya wajib dianalisis terhadap stabilitas, debit rembesan yang terjadi maupun keamanan dari piping. Angka keamanan bahaya piping pada penelitian ini dihitung dengan menggunakan metode Harza untuk kondisi muka air maksimum, muka air normal, surut cepat dan bendungan kosong di sta 0+150, sta 0+200, sta 0+250 serta sta 0+300. Berdasarkan hasil perhitungan didapatkan bahwa angka keamanan bahaya piping tanpa penggunaan filter dengan metode grouting tidak memenuhi persyaratan angka keamanan khususnya pada kondisi muka air maksimum, muka air normal dan surut cepat. Agar angka keamanan bahaya piping memenuhi persyaratan maka diaplikasikan filter dibawah tubuh bendungan. Filter yang diaplikasikan agar angka keamanan bahaya piping memenuhi persyaratan diseluruh kondisi muka air dan seluruh sta adalah dengan kedalaman 80 cm.   Kata kunci: angka keamanan, piping, metode Harza, filter


2017 ◽  
Vol 2 (3) ◽  
pp. 215
Author(s):  
Arif Sidik

Konaweeha watershed is the largest watershed in Southeast Sulawesi with Konaweeha River as the main river. The main issues in Konaweeha Watershed is floods that occur caused damage to infrastructure and public facilities, lowering agricultural production, and cause fatalities. One of the government's efforts to cope with the flooding problem in Konaweeha Watershed is planning the construction of multi-purpose dams in the upstream of Konaweeha Watershed that is Pelosika Dam and Ameroso Dam. Necessary to study the flood control performance of the two dams. Analyses were performed with hydrologic-hydraulic modeling using HEC-HMS software (Hydrologic Modelling System) version 4.0 and HEC-RAS (River Analysis System) version 4.1. The design rainfalls that were used as input to the model were 2 year, 5-year, 10-year and 25 year. Scenarios used in this study are: (1) Existing Scenario (2) Pelosika Dam Scenario; (3) Ameroro Dam Scenario; (4) Pelosika and Ameroro Dams Scenario. The results showed the maximum water surface elevation along the downstream of Konaweeha River in Scenario (2) and (4) were almost the same in the 2 and 5 years return period design flood. However, in case of 10 and 25 years return period, the difference of maximum water surface elevation at downstream of Konaweeha River was slightly significant. Furthermore, the damping efficiency of the peak discharge (at Probably Maximum Flood or PMF) was found to be 71.70% and 18.18% for the individual Pelosika Dam and Ameroro Dam respectively. Further discussion suggests the development of Pelosika Dam as the higher priority rather than that of the Ameroro Dam.


Sign in / Sign up

Export Citation Format

Share Document