Experimental Study on a Solar Powered Two-Stage Solid Wheel Desiccant Air Conditioning System

2012 ◽  
Vol 516-517 ◽  
pp. 1111-1116 ◽  
Author(s):  
Tong Hua Zou ◽  
Rong Yu ◽  
Lei Yan ◽  
Fa Li Cao

A new formulation, that employs both two-stage dehumidification and intercooler to effectively enhance system performance is proposed and investigated experimentally. The paper briefly describes desiccant wheel including the coupled fundamental principle and overall structure originally. An experimental setup is subsequently designed and built to evaluate the system performance under various operation conditions. The effects of different fresh air intake temperature at various regeneration temperature under given conditions are numerically analyzed and explained. Finally, results of a test-case are presented, indicating compared with the common single-stage system, an increase in humidity removal. Meanwhile, increasing regeneration air volume and temperature can significantly improve the dehumidification ability for sorbent materials and coefficient of performance of the system respectively, as well as save indirectly electric energy consumption, which is derived from the energy-intensive regeneration blower.

2018 ◽  
Vol 141 (1) ◽  
Author(s):  
Gaurav Singh ◽  
Ranjan Das

A building energy simulation study is carried out to analyze the performance of a triple-hybrid single-effect vapor absorption cooling system (VACS) operated by solar, natural gas, and auxiliary electricity-based cogeneration. A high capacity small office building subjected to different climatic conditions is considered. The system is designed to continuously maintain a specified building comfort level throughout the year under diverse environmental conditions. Simulations are done at different generator temperatures to investigate the performance in terms of total annual electric energy consumption, heating energy, and the coefficient of performance (COP). The performance of the present VACS is compared with the conventional compression-based system, which demonstrates the electric energy and cost saving potentials of the proposed VACS. Simulation outcomes are well-validated against benchmark data from national renewable energy laboratory and energy conservation building code. Interestingly, it is found that beyond a certain collector area, surplus energy savings can be acquired with the present triple-hybrid VACS as compared to the compression-based cooling. Results also show that COP of the simulated system is in line with experimental values available in the literature. Finally, recommendations are given to operate the complete system on solar and biomass resources, which provide encouraging opportunity for agriculture-based countries.


Author(s):  
Dimitrije Ninković ◽  
◽  
Uroš Milovančević ◽  
Milena Otović ◽  
Vladimir Černicin

The paper analyzes electric energy consumption of three different refrigeration installations: cascade refrigeration system with R134a in the high temperature circuit and CO2 in the low temperature circuit, single stage refrigeration system operating with R404A and two-stage transcritical CO2 system. The indirect impact of the refrigeration system on global warming through electric energy consumption was examined. Thermodynamic cycles of these installations have been described and models have been developed to analyze the electric energy consumption required to drive the compressor as the largest consumer, for the cooling capacity of the evaporator 5,7 kW at evaporation temperature -30 °C for meteorological 2017, in the city of Belgrade. As a basis for comparative analysis, the existing cascade refrigeration system, which is located in the Laboratory for Thermal Science at the Faculty of Mechanical Engineering in Belgrade, was selected.


2012 ◽  
Vol 7 (3) ◽  
pp. 23-32 ◽  
Author(s):  
Miloslav Bagoňa ◽  
Dušan Katunský ◽  
Martin Lopušniak ◽  
Marián Vertaľ

2021 ◽  
Vol 13 (8) ◽  
pp. 4180
Author(s):  
Andrzej Czerepicki ◽  
Tomasz Krukowicz ◽  
Anna Górka ◽  
Jarosław Szustek

The article presents an analysis of priority solutions for trams at a selected sequence of intersections in Warsaw (Poland). An analysis of the literature has shown the topicality of this issue. A computer simulation model of a coordinated sequence of intersections was constructed. Three test scenarios were designed: the existing control system, the new coordinated fixed-time control system, and the adaptive control system with active priority. In the simulation process, detailed travel characteristics of trams and other traffic participants in a selected section were obtained for the three varying scenarios. Electric energy consumption for traction needs and pollutant emissions was then estimated for each of the variants. It was concluded that for the analyzed configuration, implementation of the adaptive priority will result in a reduction of tram time losses by up to 25%, a reduction in energy consumption by up to 23%, and a reduction in the emission of pollutants from individual vehicles by up to 3% in relation to the original variant. The conducted research may be the basis for a comprehensive method of assessing the effectiveness of applying the adaptative priority when designing new tramway lines and modernizing the existing ones.


2012 ◽  
Vol 16 (3) ◽  
pp. 131
Author(s):  
Didik Ariwibowo

Didik Ariwibowo, in this paper explain that energy audit activities conducted through several phases, namely: the initial audit, detailed audit, analysis of energy savings opportunities, and the proposed energy savings. Total energy consumed consists of electrical energy, fuel, and materials in this case is water. Electrical energy consumption data obtained from payment of electricity accounts for a year while consumption of fuel and water obtained from the payment of material procurement. From the calculation data, IKE hotels accounted for 420.867 kWh/m2.tahun, while the IKE standards for the hotel is 300 kWh/m2.tahun. Thus, IKE hotel included categorized wasteful in energy usage. The largest energy consumption on electric energy consumption. Largest electric energy consumption is on the air conditioning (AC-air conditioning) that is equal to 71.3%, and lighting and electrical equipment at 27.28%, and hot water supply system by 4.44%. Electrical energy consumption in AC looks very big. Ministry of Energy and Mineral Resources of the statutes, the profile of energy use by air conditioning at the hotel by 48.5%. With these considerations in the AC target for audit detail as the next phase of activity. The results of a detailed audit analysis to find an air conditioning system energy savings opportunities in pumping systems. Recommendations on these savings is the integration of automation on the pumping system and fan coil units (FCU). The principle of energy conservation in the pumping system is by installing variable speed drives (VSD) pump drive motor to adjust speed according to load on the FCU. Load variations FCU provide input on the VSD pumps to match. Adaptation is predicted pump can save electricity consumption up to 65.7%. Keywords: energy audit, IKE, AC


2011 ◽  
Vol 314-316 ◽  
pp. 2071-2075
Author(s):  
Jia Hai Wang ◽  
Wen Tao Gong

Discrete machine manufacture enterprises have to induce new low-carbon manufacturing model in order to solve a dilemma of mutual restraint between development and electric energy consumption. The paper presents an approach to solve JSP with the objective of minimizing the energy consumption by shortening the distance between electricity peak and valley according to theory of load shifting in electricity. The mathematical model is proposed for JSP with objective of minimizing the energy consumption and processing time of entire batch, then the idea of time division is introduced, and a solving method based on GA built-in eM-Plant is employed to verify the model and get satisfactory scheduling results.Discrete machine manufacture enterprises have to induce new low-carbon manufacturing model in order to solve a dilemma of mutual restraint between development and electric energy consumption. The paper presents an approach to solve JSP with the objective of minimizing the energy consumption by shortening the distance between electricity peak and valley according to theory of load shifting in electricity. The mathematical model is proposed for JSP with objective of minimizing the energy consumption and processing time of entire batch, then the idea of time division is introduced, and a solving method based on GA built-in eM-Plant is employed to verify the model and get satisfactory scheduling results.


Sign in / Sign up

Export Citation Format

Share Document