3D Modeling and Motion Simulation of Mine Skip Getting through Dump Rail Based on Pro/E
2012 ◽
Vol 557-559
◽
pp. 2176-2180
Keyword(s):
3D modeling, virtual assembly and motion simulation of an up-open fan gate mine skip were completed with Pro/Engineer software. During virtual design, faults of a mine skip such as static and dynamic interference can be found out prior to be made, which is helpful to optimize it. Furthermore, it is effective to shorten design period of mine skip and save development cost and improve design quality.
Keyword(s):
Keyword(s):
2010 ◽
Vol 44-47
◽
pp. 900-904
Collaborative Design Principles From Minecraft With Applications to Multi-User Computer-Aided Design
2016 ◽
Vol 16
(2)
◽
Keyword(s):
2012 ◽
Vol 12
(2)
◽
2011 ◽
Vol 121-126
◽
pp. 4038-4042
Keyword(s):