Study on Deformation and Damage of Rock Mass Subject to High In Situ Stress by Using a Elastoplastic Damage Model and Considering the Impact of Weak Planes

2013 ◽  
Vol 838-841 ◽  
pp. 705-709
Author(s):  
Yun Hao Yang ◽  
Ren Kun Wang

Large scale underground caverns are under construction in high in-situ stress field at Houziyan hydropower station. To investigate deformation and damage of surrounding rock mass, a elastoplastic orthotropic damage model capable of describing induced orthotropic damage and post-peak behavior of hard rock is used, together with a effective approach accounting for the presence of weak planes. Then a displacement based back analysis was conducted by using the measured deformation data from extensometers. The computed displacements are in good agreement with the measured ones at most of measurement points, which confirm the validities of constitutive model and numerical simulation model. The result of simulation shows that damage of surrounding rock mass is mainly dominated by the high in-situ stress rather than the weak planes and heavy damage occur at the cavern shoulders and side walls.

2020 ◽  
Vol 2020 ◽  
pp. 1-14
Author(s):  
Jing Yang ◽  
Xing-Guo Yang ◽  
Jia-Wen Zhou ◽  
Yong Liu ◽  
Bao-Shun Dong ◽  
...  

The rock mass failure induced by high in-situ stresses during the excavation of deep diversion tunnels is one of the key problems in the construction of the Jinping II Hydropower Station. Based on the results of acoustic wave tests and rockburst statistical analysis conducted, this study focuses on the excavation damaged zone (EDZ) and rockburst events in the Jinping II diversion tunnels excavated using the tunnel boring machine (TBM) method and the drilling-blasting method. The unloading failure mechanism and the rockburst induced by the two different excavation methods were compared and analyzed. The results indicate that, due to the different stress adjustment processes, the degree of damage to the surrounding rock mass excavated using the drilling-blasting method was more serious than that using the TBM method. The EDZ induced by the TBM was usually distributed evenly along the edge of the excavation surface. While, the drilling-blasting method was more likely to cause stress concentration, resulting in a deeper EDZ in local areas. However, the TBM excavation method can cause other problems in high in-situ stress areas, such as strong rockbursts. The drilling-blasting method is more prone to structural controlled failure of the surrounding rock mass, while the TBM method would induce high stress concentration near the edge of excavation and more widely distributed of stress adjustment induced failure. As a result, the scale and frequency of the rockburst events generated by the TBM were significantly greater than those caused by the drilling-blasting method during the excavation of Jinping II diversion tunnels. The TBM method should be used carefully for tunnel excavation in high in-situ stress areas with burial depths of greater than 2000 m. If it is necessary to use the TBM method after a comprehensive selection, it is suggested that equipment adaptability improvement, advanced prediction, and prediction technology be used.


2017 ◽  
Vol 2017 ◽  
pp. 1-13 ◽  
Author(s):  
XinPing Li ◽  
JunHong Huang ◽  
Yi Luo ◽  
Qian Dong ◽  
YouHua Li ◽  
...  

Aiming at surrounding rock damage induced by dynamic disturbance from blasting excavation of rock-anchored beam in rock mass at moderate or far distance in underground cavern, numerical model of different linear charging density and crustal stress in underground cavern is established by adopting dynamic finite element software based on borehole layout, charging, and rock parameter of the actual situation of a certain hydropower station. Through comparison in vibration velocity, contour surface of rock mass excavation, and the crushing extent of excavated rock mass between calculation result and field monitoring, optimum linear charging density of blast hole is determined. Studies are also conducted on rock mass vibration in moderate or far distance to blasting source, the damage of surrounding rock in near-field to blasting source, and crushing degree of excavated rock mass under various in situ stress conditions. Results indicate that, within certain range of in situ stress, the blasting vibration is independent of in situ stress, while when in situ stress is increasing above certain value, the blasting vibration velocity will be increasing and the damage of surrounding rock and the crushing degree of excavated rock mass will be decreasing.


2006 ◽  
Vol 306-308 ◽  
pp. 1473-1478
Author(s):  
Wei Shen Zhu ◽  
Jian Hua Liu ◽  
Shu Cai Li

A brief description is given to the visco-plastic constitutive model of 3-D FLAC software and some treating methods for the numerical analysis. The excavation steps and the exerting time of excavation loads are determined in the light of the real construction process. The rockmass mechanical parameters are determined according to back analysis of in-situ measured displacement data. The analysis results of displacement and stability of the opening complex surrounding rocks in the construction process and in a long period of time after excavation completion are given.


Author(s):  
Ismail Zaki, Et. al.

The characterization of rock massifs is a delicate job; indeed, it is possible to understand the behaviour of intact rocks individually by laboratory tests but it is difficult to characterize them on the whole rock mass, which has undergone a complex geological history. Empirical approaches play an important role in the excavation of galleries and the design of support systems. These approaches are considered very effective in optimizing the tunnel excavation process. Several reliable empirical approaches have been developed, but the selection or use of an appropriate empirical method to design the tunnel excavation remains a difficult task. Therefore, in this work, the analysis of four approaches, the most used, of different empirical design was carried out to determine the behaviour of the rock mass during its excavation in a state of high in situ stress. This study was carried out on the scale of the ST2 rock mass of the worksite (BAE well 3) at the Bouazzer mine. These approaches include the AFTES classification, rock mass index (RMR), rock mass quality (Q) and geological resistance index (GSI). Based on the simulated statistical results obtained from said empirical approaches, through the finite element calculation, it was found that the application of the rock mass quality approach is very efficient in the excavation of the rock mass. gallery of size because it makes it possible to take into account the equivalent dimensions of the gallery, the stress condition in situ due to the excavation and the heights of overburden which are considered as major elements of the stability of the gallery. The method provides an optimized reinforcement and support design. In addition, this study will serve as a valuable basic document for the geotechnical engineer to design and plan support systems in the excavation of galleries under high in-situ stress.


2018 ◽  
Vol 22 ◽  
pp. 5-9
Author(s):  
Krishna Kanta Panthi

Tunnels and underground caverns located at greater depth (high rock cover or overburden) are subjected to high in-situ stress environment. Those rock mass that are relatively unjointed and massive are exposed to the brittle failure, which is famously known as rock spalling/ rock bursting phenomenon. Establishing state of the stress and evaluating stress-induced instability in tunnels passing through such rock mass at relatively greater depth is therefore a challenge. The aim of this manuscript is to describes existing brittle failure (rock burst) prediction methods that are being practiced worldwide and propose necessary editions so that quality of assessment is enhanced. The methods described are very practical and the author is confident that professional engineers will use them to evaluate and predict potential rock burst/ rock spalling scenario in the tunnels during planning, design and construction phases. Each method of prediction is explained, applicability extent is highlighted and comparisons between the methods are made.  HYDRO Nepal JournalJournal of Water Energy and EnvironmentIssue No: 22Page: 5-9Uploaded date: January 14, 2018


2014 ◽  
Vol 941-944 ◽  
pp. 2558-2564
Author(s):  
Yu Kai Lv ◽  
Cong Jiang ◽  
Yao Dong Jiang

Coal bumps happened many times in mining at No.5 seam of Tangshan coal mine. Strengthen the roadway’s support of working face can effectively reduce disaster losses. With the research background of the 3654 working face, the mine pressure monitoring for the existing support form of roadway has been carried on. Perform a numerical simulation for the original roadway support, base on the in-situ stress and physical and mechanical characteristics of surrounding rock in experimental; study the impact of the stability of roadway’s surrounding rock, while the space change of trellis and change of supporting intensity; optimizing the original support form, so as to maximum reducing the impact of the coal bumps.


Sign in / Sign up

Export Citation Format

Share Document