Establishment and Application of Microseismic Monitoring System to Deep-Buried Underground Powerhouse

2013 ◽  
Vol 838-841 ◽  
pp. 889-893
Author(s):  
Biao Li ◽  
Feng Dai ◽  
Nu Wen Xu ◽  
Chun Sha

The right bank underground powerhouse of Houziyan hydropower station is a typical deep-buried type with high geostress and complicated geological conditions. To monitor and analyze the stability of surrounding rock mass during continuous excavation of the powerhouse excavation and locate the potential failure zones, an ESG (Engineering Seismology Group) microseismic monitoring system manufactured in Canada was installed in April, 2013. The wave velocity of the monitoring system was determined through fixed blasting tests. And the average location error is the minimum while P-wave velocity is 5700m/s, less than 10m and meeting the system request. By combining the temporal and spatial distribution regularity of microseimic events with field excavation, micro-crack clusters and potential instability zones were identified and delineated. The results will provide a reference for later excavations and supports of the underground powerhouse. Furthermore, a new monitoring method can also be supplied for the stability analysis of surrounding rock mass in deep-buried underground powerhouses.

2015 ◽  
Vol 2015 ◽  
pp. 1-9 ◽  
Author(s):  
Feng Dai ◽  
Biao Li ◽  
Nuwen Xu ◽  
Yongguo Zhu ◽  
Peiwei Xiao

To study the stability of underground powerhouse at Houziyan hydropower station during excavation, a microseismic monitoring system is adopted. Based on the space-time distribution characteristics of microseismic events during excavation of the main powerhouse, the correlation between microseismic events and blasting construction is established; and the microseismic clustering areas of the underground powerhouse are identified and delineated. The FLAC3D code is used to simulate the deformation of main powerhouse. The simulated deformation characteristics are consistent with that recorded by microseismic monitoring. Finally, the correlation between the macroscopic deformation of surrounding rock mass and microseismic activities is also revealed. The results show that multiple faults between 1# and 3# bus tunnels are activated during excavation of floors V and VI of the main powerhouse. The comprehensive method combining microseismic monitoring with numerical simulation as well as routine monitoring can provide an effective way to evaluate the surrounding rock mass stability of underground caverns.


2020 ◽  
Vol 2020 ◽  
pp. 1-20
Author(s):  
Meng Wang ◽  
Jia-wen Zhou ◽  
An-chi Shi ◽  
Jin-qi Han ◽  
Hai-bo Li

The stability of the surrounding rock masses of underground powerhouses is always emphasized during the construction period. With the general trends toward large-scale, complex geological conditions and the rapid construction progress of underground powerhouses, deformation and failure issues of the surrounding rock mass can emerge, putting the safety of construction and operation in jeopardy and causing enormous economic loss. To solve these problems, an understanding of the origins and key affecting factors is required. Based on domestic large-scale underground powerhouse cases in the past two decades, key factors affecting the deformation and failure of the surrounding rock mass are summarized in this paper. Among these factors, the two most fundamental factors are the rock mass properties and in situ stress, which impart tremendous impacts on surrounding rock mass stability in a number of cases. Excavation is a prerequisite of surrounding rock mass failure and support that is classified as part of the construction process and plays a pivotal role in preventing and arresting deformation and failure. Additionally, the layout and structure of the powerhouse are consequential. The interrelation and interaction of these factors are discussed at the end of this paper. The results can hopefully advance the understanding of the deformation and failure of surrounding rock masses and provide a reference for design and construction with respect to hydroelectric underground powerhouses.


2006 ◽  
Vol 306-308 ◽  
pp. 1455-1460
Author(s):  
Jing Zeng ◽  
Qian Sheng ◽  
Qing Chun Zhou

The power house of Yantan extended hydropower project, with complex geological conditions such as fault f211 below the power house and quartzite on top of it, is a huge underground cavern with large span and high wall. In order to evaluate the stability of the power house surrounded by such complex geological structure, the numerical simulation excavation of power house with different location schemes were studied by the elasto-plastic 2D FEM method. The deformation and evolutive process of the stress with the progress of excavation were analyzed. On the condition ensuring the whole stability of surrounding rock mass, comparison optimization analyses were conducted on the power house location scheme. The rational location scheme was demonstrated. The final analyses results show that: (1) The mechanical properties of quartzite and its relative location to the power house has no obvious influence to the stability of surrounding rock mass.(2) The f211 is the main bad geological structure which affect the stability of power house. (3) The case of moving 10m upward of power house is the most rational scheme for the whole stability of power house. (4) The Supporting measures, which would has an obvious effect in controlling the influence on the stability of surrounding rock mass by weak geological structure, are suggested at the out-crop of f211.


2018 ◽  
Vol 2018 ◽  
pp. 1-14 ◽  
Author(s):  
Mingshi Gao ◽  
Hongchao Zhao ◽  
Yichao Zhao ◽  
Xiaojun Gao ◽  
Xiangyu Wang

Rock burst is a physical explosion associated with enormous damage at a short time. Due to the complicity of mechanics of rock burst in coal mine roadway, the direct use of traditional investigation method applied in tunnel is inappropriate since the components of surrounding rock are much more complex in underground than that of tunnel. In addition, the reliability of the results obtained through these methods (i.e., physical simulation, theoretical analysis, and monitoring in filed application) is still not certain with complex geological conditions. Against this background, present experimental study was first ever conducted at initial site to evaluate the effect of shock wave during the rock burst. TDS-6 microseismic monitoring system was set up in situ to evaluate the propagation of shock wave resulting in microexplosions of roadway surrounding rock. Various parameters including the distance of epicentre and the characteristic of response have been investigated. Detailed test results revealed that(1)the shock wave attenuated exponentially with the increase of the distance to seismic source according to the equation ofE=E0e-ηl; particularly, the amplitude decreased significantly after being 20 m apart from explosive resource and then became very weak after being 30 m apart from the seismic source;(2)the response mechanics are characteristic with large scatter based on the real location of surrounding rock despite being at the same section. That is, the surrounding rock of floor experienced serious damage, followed by ribs, the roof, and the humeral angles. This in situ experimental study also demonstrated that microseismic monitoring system can be effectively used in rock burst through careful setup and data investigation. The proposed in situ monitoring method has provided a new way to predict rock burst due to its simple instalment procedure associated with direct and reasonable experimental results.


2010 ◽  
Vol 44-47 ◽  
pp. 1189-1192
Author(s):  
Zhong Chang Wang

The rose diagram of joint is generalized by grouping the attitude of disclosed discontinuous faces in detecting cavern and measuring point coordinate. The search of movable and key blocks of surrounding rock mass for underground powerhouse is implemented, the combinations of discontinuous faces and sliding faces, the location and the parameter of stability of movable and key blocks are obtained by used of the method of stereographic projection and vector analysis of the block theory. It is shown that the numbers of movable and key blocks in the location of downriver right side wall and vault are larger than those in other location owing to numerous discontinuous faces, and the faults of F34 and F33 play a main role in the stability of movable and key blocks. The guidance for excavation and reinforce of underground caverns is provided.


2021 ◽  
Vol 12 (1) ◽  
pp. 149
Author(s):  
Xiang Zhou ◽  
Biao Li ◽  
Chunming Yang ◽  
Weiming Zhong ◽  
Quanfu Ding ◽  
...  

The diversion tunnel of a hydropower station is characterized by low quality surrounding rock and weak structural planes. During excavation, rock mass spalling and cracking frequently occur. To evaluate the stability of a rock mass during tunnel excavation, high-precision microseismic monitoring technology was introduced to carry out real-time monitoring. Based on the temporal and spatial distribution characteristics of microseismic events, the main damage areas and their influencing factors of tunnel rock mass were studied. By analyzing the source characteristic parameters of the concentration area of microseismic activities, the rock fracture mechanism of the concentration area was revealed. The 3D numerical model of diversion tunnel was established, and the deformation characteristics of the rock mass under the control of different combination types of weak structural planes were obtained. The results showed that the microseismic event was active between 29 October 2020 and 6 November 2020, and the energy release increased sharply. The main damage areas of the rock mass were located at Stakes K0 + 500–K0 + 600 m. Microseismic source parameters revealed that shear failure or fault-slip failure induced by geological structures had an important influence on the stability of the surrounding rock. The numerical simulation results were consistent with the microseismic monitoring results and indicated that among the three kinds of structural plane combination types, including “upright triangle”, “inverted triangle” and “nearly parallel”, the “upright triangle” structure had the most significant influence on the stability of the surrounding rock. In addition, the maximum displacement of the surrounding rock had a trend of lateral migration to the larger dip angle in the three combined structural plane types. The research results will provide significant references for the safety evaluation and construction design of similar tunnels.


2019 ◽  
Vol 136 ◽  
pp. 04023
Author(s):  
Ming Zhao ◽  
Ke Li ◽  
Hong Yan Guo ◽  
KaiCheng Hua

Based on the special geological conditions of a tunnel in Qingyuan section of Huizhou-Zhanzhou Expressway, FLAC3d numerical simulation software is used to simulate the rheological properties and instability of surrounding rock in large-section fully weathered sandstone section, and the stability and loss of surrounding rock are analyzed. The deformation of the dome and the face at steady state is analyzed. It is found that: 1) when the surrounding rock is in a stable state, the deformation curve of the dome is smooth. When the surrounding rock of the face is unstable, the front of the face appears ahead. Deformation should be first strengthened on the surrounding rock in front of the face. 2) The arched foot is an important part of the instability of the surrounding rock. In order to prevent the expansion of the collapsed part, the arched part should be reinforced. 3) In order to obtain the limit state of surrounding rock stability, the strength of surrounding rock is reduced, and the strength reduction coefficient corresponding to the displacement sudden point is taken as the safety factor of rock stability around the hole, and the stability safety coefficients of surrounding rock of each construction step are greater than 1.2. 4) The dynamic standard values of deformation control in the whole construction stage are obtained by analyzing the deformation curves of each data monitoring point with time in the corresponding time period of each construction step.


2013 ◽  
Vol 405-408 ◽  
pp. 402-405 ◽  
Author(s):  
Yun Jie Zhang ◽  
Tao Xu ◽  
Qiang Xu ◽  
Lin Bu

Based on the fluid-solid coupling theory, we study the stability of surrounding rock mass around underground oil storage in Huangdao, Shandong province, analyze the stress of the surrounding rock mass around three chambers and the displacement change of several key monitoring points after excavation and evaluate the stability of surrounding rock mass using COMSOL Multiphysics software. Research results show that the stress at both sides of the straight wall of cavern increases, especially obvious stress concentration forms at the corners of the cavern, and the surrounding rock mass moves towards the cavern after excavation. The stress and displacement of the surrounding rock mass will increase accordingly after setting the water curtains, but the change does not have a substantive impact on the stability of surrounding rock mass.


2015 ◽  
Vol 777 ◽  
pp. 8-12 ◽  
Author(s):  
Lin Zhen Cai ◽  
Cheng Liang Zhang

HuJiaDi tunnel construction of Dai Gong highway is troublesome, the surrounding-rock mass give priority to full to strong weathering basalt, surrounding rock integrity is poor, weak self-stability of surrounding rock, and tunnel is prone to collapse. In order to reduce disturbance, taking advantage of the ability of rock mass, excavation adopt the method of "more steps, short footage and strong support". The excavation method using three steps excavation, The excavation footage is about 1.2 ~ 1.5 m; The surrounding rock bolting system still produce a large deformation after completion of the first support construction, it shows that the adopted support intensity cannot guarantee the stability of the tunnel engineering. Using ABAQUS to simulate tunnel excavation support, optimizing the support parameters of the tunnel, conducting comparative analysis with Monitoring and Measuring and numerical simulation results, it shows that the displacement - time curves have a certain consistency in numerical simulation of ABAQUS and Monitoring and Measuring.


2018 ◽  
Vol 175 ◽  
pp. 03025
Author(s):  
Feng Zhou ◽  
Hongjian Jiang ◽  
Xiaorui Wang

The problem about the stability of tunnel surrounding rock is always an important research object of geotechnical engineering, and the right or wrong of the result from stability analysis on surrounding rock is related to success or failure of an underground project. In order to study the deformation rules of weak surrounding rock along with lateral pressure coefficient and burying depth varying under high geostress and discuss the dynamic variation trend of surrounding rock, the paper based on the application of finite difference software of FLAC3D, which can describe large deformation character of rock mass, analog simulation analysis of surrounding rock typical section of the class II was proceeded. Some conclusions were drawn as follows: (1) when burying depth is invariable, the displacements of tunnel surrounding rock have a trend of increasing first and then decreasing along with increasing of lateral pressure coefficient. The floor heave is the most sensitive to change of lateral pressure coefficient. The horizontal convergence takes second place. The vault subsidence is feeblish to change of lateral pressure coefficient. (2) The displacements of tunnel surrounding rock have some extend increase along with increasing of burying depth. The research conclusions are very effective in analyzing the stability of surrounding rock of Yunling tunnel. These are going to be a reference to tunnel supporting design and construction.