scholarly journals MODELING OF MIXED LIQUOR VOLATILE SUSPENDED SOLIDS AND PERFORMANCE EVALUATION FOR A SEQUENCING BATCH REACTOR

2015 ◽  
Vol 9 (1) ◽  
pp. 54-65
Author(s):  
Sayed Ahmad Mirbagheri ◽  
Majid Bagheri ◽  
Majid Ehteshami ◽  
Zahra Bagheri ◽  
Masoud Pourasghar

This study examined carbon, nitrogen and phosphorous removal from municipal wastewater in a sequencing batch reactor and biokinetic coefficients were evaluated according to results of BOD and COD. Furthermore, the MLVSS in the aeration reactor was modeled by using multilayer perceptron and radial basis function artificial neural networks (MLPANN and RBFANN). The experiments were performed so that the cell retention time, filling time and intensity of aeration were (5, 10 and 15 d), (1, 2 and 3 h) and (weak, medium and strong) respectively. The result indicated that with cell retention time of 15 d, filling time of 1 h, aeration time of 6 h and settling time of 3 h the HRT is optimized at 10 h. The BOD5, COD, TP, TN and removal efficiencies were 97.13%, 94.58%, 94.27%, 89.7% and 92.75% respectively. The yield coefficient (Y), decay coefficient (Kd), maximum specific growth rate (K) and saturation constant (Ks) were 6.22 mgVSS/mgCOD, 0.002 1/d, 0.029 1/d and 20 mg COD/L according to COD experimental data. The values of the biokinetic coefficients were found to be as follows: Y = 10.45 mgVSS/mgBOD, Kd = 0.01 1/d, 0.014 1/d and 3.38 mgBOD/L according to BOD5 experimental data. The training procedures for simulation of MLVSS were highly collaborated for both RBFANN and MLPANN. The train and test models for both MLPANN and RBFANN demonstrated perfectly matched results between the experimental and the simulated values of MLVSS. The values of RMSE for train and test (verification) models obtained by MLPANN were 31.82 and 40.25 mg/L respectively, and the value of R2 was 0.99 for both models. The values of RMSE for train and test models obtained by MLPANN were 69.04 and 43.87 mg/L respectively, and the value of R2 was 0.99 for both models. It was observed that the MLPANN has stronger approximation and generalization ability than the RBFANN with regard to our experimental data for MLVSS.

2015 ◽  
Vol 9 (1) ◽  
pp. 54-65 ◽  
Author(s):  
Sayed Ahmad Mirbagheri ◽  
Majid Bagheri ◽  
Majid Ehteshami ◽  
Zahra Bagheri ◽  
Masoud Pourasghar

This study examined carbon, nitrogen and phosphorous removal from municipal wastewater in a sequencing batch reactor and biokinetic coefficients were evaluated according to results of BOD and COD. Furthermore, the MLVSS in the aeration reactor was modeled by using multilayer perceptron and radial basis function artificial neural networks (MLPANN and RBFANN). The experiments were performed so that the cell retention time, filling time and intensity of aeration were (5, 10 and 15 d), (1, 2 and 3 h) and (weak, medium and strong) respectively. The result indicated that with cell retention time of 15 d, filling time of 1 h, aeration time of 6 h and settling time of 3 h the HRT is optimized at 10 h. The BOD5, COD, TP, TN and removal efficiencies were 97.13%, 94.58%, 94.27%, 89.7% and 92.75% respectively. The yield coefficient (Y), decay coefficient (Kd), maximum specific growth rate (K) and saturation constant (Ks) were 6.22 mgVSS/mgCOD, 0.002 1/d, 0.029 1/d and 20 mg COD/L according to COD experimental data. The values of the biokinetic coefficients were found to be as follows: Y = 10.45 mgVSS/mgBOD, Kd = 0.01 1/d, 0.014 1/d and 3.38 mgBOD/L according to BOD5 experimental data. The training procedures for simulation of MLVSS were highly collaborated for both RBFANN and MLPANN. The train and test models for both MLPANN and RBFANN demonstrated perfectly matched results between the experimental and the simulated values of MLVSS. The values of RMSE for train and test (verification) models obtained by MLPANN were 31.82 and 40.25 mg/L respectively, and the value of R2 was 0.99 for both models. The values of RMSE for train and test models obtained by MLPANN were 69.04 and 43.87 mg/L respectively, and the value of R2 was 0.99 for both models. It was observed that the MLPANN has stronger approximation and generalization ability than the RBFANN with regard to our experimental data for MLVSS.


2020 ◽  
Vol 17 (2) ◽  
pp. 946-949
Author(s):  
Samaneh Alijantabar Aghouzi ◽  
Thomas S. Y. Choong ◽  
M. I. Aida Isma

This study elucidates the performance of sequencing batch reactor for nutrient removal from municipal wastewater. The removal of COD, ammonia nitrogen and phosphorus were investigated. The SBR with a working volume of 5 L was operated for 6 hours, with 5 min fill, 30 min settle and 5 min effluent withdrawal. The remaining time in each cycle was 90 min anaerobic phase, 130 min anoxic phase and 110 min aerobic phase. The experiment was repeated with a longer aeration time of 180 min resulting to prolong the duration cycle. In the aerobic phase, dissolved oxygen was kept in the range of more than 2 mg/L. During batch operation, the system attained stability and had a removal efficiency for ammonia nitrogen, COD and phosphorus of 51.36%, 83.33% and 99.53%, respectively. Extending the aeration period improved ammonia nitrogen removal to 54.27%. It should be noted that the stability of the granular biomass agglomerates highly depending on the bacterial consortia. The particle size of sludge reduced from 60.26 μm to 39.00 μm in 60 days. It was observed that degranulation process and biomass loss was unavoidable.


2013 ◽  
Vol 39 (2) ◽  
pp. 69-80 ◽  
Author(s):  
Chandrakant Thakur ◽  
Indra Deo Mall ◽  
Vimal Chandra Srivastava

Abstract In the present study, treatment of synthetic wastewater containing phenol, resorcinol and catechol was studied in a sequencing batch reactor (SBR). Parameters such as hydraulic retention time (HRT) and filling time have been optimized to increase the phenol, resorcinol, catechol and chemical oxygen demand (COD) removal efficiencies. More than 99% phenol, 95% resorcinol and 96% catechol and 89% COD removal efficiency was obtained at optimum conditions of HRT = 1.25 d and fill time = 1.5 h. The heating value of the sludge was found to be 12 MJ/kg. The sludge can be combusted to recover its energy value.


1994 ◽  
Vol 30 (6) ◽  
pp. 237-246 ◽  
Author(s):  
A. Carucci ◽  
M. Majone ◽  
R. Ramadori ◽  
S. Rossetti

This paper describes a lab-scale experimentation carried out to study enhanced biological phosphate removal (EBPR) in a sequencing batch reactor (SBR). The synthetic feed used was based on peptone and glucose as organic substrate to simulate the readily biodegradable fraction of a municipal wastewater (Wentzel et al., 1991). The experimental work was divided into two runs, each characterized by different operating conditions. The phosphorus removal efficiency was considerably higher in the absence of competition for organic substrate between P-accumulating and denitrifying bacteria. The activated sludge consisted mainly of peculiar microorganisms recently described by Cech and Hartman (1990) and called “G bacteria”. The results obtained seem to be inconsistent with the general assumption that the G bacteria are characterized by anaerobic substrate uptake not connected with any polyphosphate metabolism. Supplementary anaerobic batch tests utilizing glucose, peptone and acetate as organic substrates show that the role of acetate in the biochemical mechanisms promoting EBPR may not be so essential as it has been assumed till now.


2000 ◽  
Vol 42 (5-6) ◽  
pp. 171-178 ◽  
Author(s):  
S.-R. Ha ◽  
L. Qishan ◽  
S. Vinitnantharat

Treatment performance of COD in the presence of 2,4-dichlorophenol (2,4-DCP) was explored by using a biological activated carbon-sequencing batch reactor (BAC-SBR) system. Two COD levels of basic substrate were synthesized with a mixture of phenol and 2,4-dichlorophenol. Although effluent concentration was increased with reduction of sludge retention time (SRT) from 8-days to 3-days, treatment efficiency was indicated more than 90% of COD in all SRTs applied. Reactors operated with acclimated sludge could be expected to cope with quite high loading of inhibitory substances.


2002 ◽  
Vol 46 (4-5) ◽  
pp. 131-137 ◽  
Author(s):  
Y.Z. Peng ◽  
J.F. Gao ◽  
S.Y. Wang ◽  
M.H. Sui

In order to achieve fuzzy control of denitrification in a Sequencing Batch Reactor (SBR) brewery wastewater was used as the substrate. The effects of brewery wastewater, sodium acetate, methanol and endogenous carbon source on the relationships between pH, ORP and denitrification were investigated. Also different quantities of brewery wastewater were examined. All the results indicated that the nitrate apex and nitrate knee occurred in the pH and ORP profiles at the end of denitrification. And when carbon was the limiting factor, through comparing the different increasing rate of pH whether the carbon was enough or not could be known, and when the carbon should be added again could be decided. On the basis of this, the fuzzy controller for denitrification in SBR was constructed, and the on-line fuzzy control experiments comparing three methods of carbon addition were carried out. The results showed that continuous carbon addition at a low rate might be the best method, it could not only give higher denitrification rate but also reduce the re-aeration time as much as possible. It appears promising to use pH and ORP as fuzzy control parameters to control the denitrification time and the addition of carbon.


Vestnik MGSU ◽  
2019 ◽  
pp. 589-602 ◽  
Author(s):  
Tran Ha Quan ◽  
Elena S. Gogina

Introduction. Vietnamese urban municipal wastewater treatment plants are mainly of aeration-type facilities. Nowadays, an aeration-type plant, the Sequencing Batch Reactor (SBR), is widely applied and possesses a number of advantages over traditional systems with suspended activated sludge. Advantages of the SBR are mainly concluded in simplicity of operation, occupied area and cost. There is a number of problems at the wastewater treatment plants; they are connected with supplying only a half of wastewater design amount for the treatment as well as with quality of the purified water that must satisfy requirements of the Vietnamese discharge standard, the Standard A. Therefore, reconstruction and modification of the SBR is the major challenger to ensure the sustained development of large Vietnamese cities and maintenance of ecological balance. Materials and methods. To enhance the efficiency of wastewater purification in the SBR, the experiments were set on reactor reconstruction and modification by two directions: (1) Technological method, i.e. applying the Biochip 25 biocarrier, and (2) Operation method, i.e. adding the anoxic phase in reactor operation cycle. Laboratory tests were conducted for each of the directions, including comparison of a typical reactor with the modified one. Results. The study resulted in obtaining an optimal amount of the BioChip biocarrier material (10 to 20 %) that increased efficiency of wastewater purification by 10 to 20 %. In addition to this, when creating an anoxic phase of the operation cycle, efficiency of nitrogen removal increased by 20 %. When the denitrification occurs under the anoxic conditions, it contributes to stabilization of ammonium nitrogen removal for daily nitrogen loading in reactor of 0.3 to 0.8 TKN kg/sludge kg. Conclusions. The suggested technology provides the quality of treated water corresponding with the Vietnamese Standard A requirements. At the present, it is planned to proceed with the experiment on the base of Vietnamese semi-industrial plant for research and appraisal of the SBR reconstruction and modification method. Acknowledgements. The authors are grateful to AKVA Control company in Samara for granted biocarrier Mutag BioChip 25 and to Associate Professor Tran Van Quang and his students, Nguyen Ngoc Phuong and Truong Quoc Dai, of Environment Protect Research Center, Danang University for support of the experiment.


2016 ◽  
Vol 19 (4) ◽  
pp. 39-49
Author(s):  
Nhat The Phan ◽  
Van Thi Thanh Truong ◽  
Son Thanh Le ◽  
Biec Nhu Ha ◽  
Dan Phuoc Nguyen

In this study, a lab-scale Partial Nitritation Sequencing Batch Reactor (PNSBR) was implemented for treating high-ammonium old landfill leachate to yield an appropriate NO2—N/ NH4+-N ratio from 1/1 to 1.32/1 mixture as a pretreatment for subsequent Anammox. The objective of this study was to determine the optimal hydraulic retention time (HRT) at different influent ammonia concentrations for 210 days. The experimental results showed that with the influent ammonia concentrations of 500, 1000, 1500 and 2000 mg/L, HRT is 12 h, 21 h, 30 h and 48 h, respectively. The range of free ammonia (FA) concentration from 17 to 44 mg/L completely inhibited nitrite oxidizing bacteria (NOB) for long time operation. The COD removal efficiency was very low (6±2) %.


2019 ◽  
Vol 38 (3) ◽  
pp. 243
Author(s):  
Happy Mulyani ◽  
Gregorius Prima Indra Budianto ◽  
Margono Margono ◽  
Mujtahid Kaavessina

Industrial wastewater treatment using Sequencing Batch Reactor (SBR) can improve effluent quality at lower cost than that obtained by other biological treatment methods. Further optimization is still required to enhance effluent quality until it meets standard quality and to reduce the operating cost of treatment of high strength organic wastewater. The purpose of this research was to determine the effect of pretreatment (pH adjustment and prechlorination) and aeration time on effluent quality and COD removal rate in tapioca wastewater treatment using SBR. Pretreatment was done by (1) adjustment of tapioca wastewater pH to control (4.92), 7, and 8, and (2) tapioca wastewater prechlorination at pH 8 during hour using calcium hypochlorite in variation dosages 0, 2, 4, 6 mg/L Cl2, SBR operation was conducted according to following steps: (1) Filling of pre-treated wastewater into a bioreactor during 1 hour, and (2) aeration of the mixture of tapioca wastewater and activated sludge during 8 hours. Effluent sample was collected at every 2-hours aeration for COD analysis. COD removal rate mathematical formula was got by first deriving the best fit function between aeration time and COD. Optimum aeration time resulting in no COD removal rate. The value of COD effluent and its removal rate in optimum aeration time was used to determine the recommended of operation condition of pretreatment. Research result shows that chosen pH operation condition is pH 8. Prechorination can make effluent quality which meets standard quality and highest COD removal rate. The chosen Cl2 dosage is 6 mg/L.


Sign in / Sign up

Export Citation Format

Share Document