Accelerating the Cultivation of EPC Project Procurement Whole Process Management Ability

2021 ◽  
2013 ◽  
Vol 394 ◽  
pp. 222-227
Author(s):  
Zhou Yang Li ◽  
Yan Ni Lei

nformation exchange and sharing are difficult in manufacturing process for manufacturing enterprises, especially for aircraft manufacturing enterprises, which have complex product to fabricate and mass information to handle. To solve this problem, a Single Enterprise BOM (SEBOM) based Aircraft Manufacturing Process Management System (AMPMS) is promoted to support the whole process of aircraft manufacturing, based on the analysis of aircraft manufacturing process and the process of data flowing. In AMPMS, in order to satisfy the information requirement, a SEBOM is established by unifying various BOM data. A unified SEBOM management platform is established to managing distributed and heterogeneous SEBOM data. Furthermore, the key technologies including BOM data mapping and BOM data agent management are discussed in detail. The validity and feasibility of AMPMS system are verified by developing a prototype system.


2020 ◽  
Vol 2020 ◽  
pp. 1-13
Author(s):  
Miroslav Drljača ◽  
Igor Štimac ◽  
Andrija Vidović ◽  
Saša Petar

In addition to passenger traffic, air cargo business is an important business for a global air transport industry. This means that Air Cargo Handling Process (ACHP) is important for any airport or cargo handling agent who provides cargo handling services. To qualitatively manage the ACHP, certain prerequisites must be met, such as competent cargo staff, procedures, cargo information system, infrastructure with enough capacity, and process management. The objective of research presented in this paper is ACHP and its complex structure but in the context of safety and sustainability. Using of several scientific methods of cognition, the authors research the structure of ACHP and safety, and ecological aspects of the process, too. The result of this research is the safety and environmental aspects of the process which are of significant importance for process functionality as well as for the quality level of service that meets customer requirements and to the sustainability of process. Results show that there is a significant impact of the environmental and safety aspects specific to particular activities in ACHP and that they affect the reliability and functionality of the whole process, its profitability, and competitiveness. This points to the need for ACHP to be viewed in context and to understand ACHP sustainability matters and sustainability components.


2015 ◽  
Vol 713-715 ◽  
pp. 1285-1288
Author(s):  
Jin Li ◽  
Ruo Chen Zhao ◽  
Jian Hua Wang

With the implementation of State Grid’s management system, ‘Three Intensive Management And Five Large-scale Movements,’ it is inevitable for municipal power supply enterprises to promote and build value management. Based on value management, with management features of municipal power supply enterprises’ other expenses, whole process management will be combined with enterprises’ realities to build management system for other expenses, strengthen control of other management expenses in the event, track key projects and form a closed-loop dynamic cost management, which will make up for lack of the feedback of traditional cost management mode on other management expenses.


TEM Journal ◽  
2021 ◽  
pp. 215-220
Author(s):  
Stepan Chalupa ◽  
Martin Petricek ◽  
Zdenek Ulrych

This article deals with Business Process Modelling and Reengineering use in the hospitality industry, focusing on the improvement of direct telephone sales by application of the CRM system. After modelling the current state of the selected process using ARIS methodology, the same process was remodelled for the application of the CRM system. This application shortened the whole process (mainly the number of activities needed to prosecute) and allowed the front-office employee to be more clients oriented. The automation of labour-intensive processes can reduce the number of human-caused errors and improve the convertibility and reservation request and their overall value.


Author(s):  
Yanlun Shi ◽  
Jian Wang ◽  
Yongbo Qu ◽  
Zhihong Lang ◽  
Hongjiao Liu

 Since the reform and opening up, the national economy of our country has been developing steadily and steadily, and the overall level of urbanization and industrialization has been upgrading rapidly.Behind its growth is increasingly serious environmental problems, and environmental protection engineering as a key project of ecological environment governance, its process management level and quality are related to the balance of the entire ecological environment.If we want to further improve the overall efficiency and quality of the project and fundamentally realize the standardization and standardization of the environmental protection project, we should strengthen the whole process control and management of the environmental protection project, and promote the full coverage of the whole process control management.In view of this, this article on the importance of the whole process control management focuses on environmental protection projects, according to the actual management of risks in the process to carry on the understanding and control, and make proper treatment, to strengthen risk management and process control of environmental engineering[1].


2021 ◽  
Vol 245 ◽  
pp. 01059
Author(s):  
Qian Gao ◽  
Yuchun Han ◽  
Junyi Yang ◽  
Guiqin Zhang ◽  
Yu Hong ◽  
...  

In order to strengthen the all-round and whole process management and control of the project, improve the quality of statistical data, support the high-quality development of the company and power grid, and identify the mismatch between the progress of fund payment and the progress of project site construction and cost accounting. Through the research on the dynamic monitoring and early warning model of power grid infrastructure project funds, the problems existing in the fund settlement and payment management of power grid project in the process of project implementation are accurately revealed, and the project fund payment risk is prevented.


Sign in / Sign up

Export Citation Format

Share Document