Abstract
Jurassic's kerogen shale-carbonate reservoir in North Kuwait is categorized as a source rock exhibiting micro- to Nano Darcy permeability and is Kuwait Oil Company's focus in recent years. Although the challenges are significant (formation creep, fracturing initiation, etc.), the efforts toward producing from unconventional reservoirs and applying experience from both USA and Canada in this field are ongoing. As a step toward development, the gas field development group selected a vertical pilot well to measure the inflow of hydrocarbon from a single fracture while minimizing formation creep (flowing of particulate material and formation into the wellbore that blocks the production). This step was required prior to drilling a long horizontal lateral wells and completing it with multiple hydraulic fractures to confirm commercial production.
A comprehensive design process was executed with the full integration of operator and service company competencies to achieve the three main objectives: First, characterize the kerogen rock mechanics which allows selection of the most competent kerogen beds to prevent collapse of the hole during fracturing (creep effect) by conducting scratch, unconfined stress, proppant embedment, and fluid compatibility tests. Then, prepare a suit of strength measurements on full core samples to help in fracturing design and minimize creep effect. The second objective was to design and implement a robust proppant fracturing program that avoids the kerogen concerns after selecting the most competent reservoir unit and suitable proppant type. Third, perform controlled flowback to unload the well and attempt to establish clean inflow unlike previous attempts that failed to either suitably stimulate or prevent solids production (deliver clean inflow).
After analyzing the lab test results, choosing the optimal fracturing design, and preparing the vertical well for proppant hydraulic fracturing, the treatment was performed. In December 2019, the hydraulic fracturing treatment with resin-coated bauxite proppant was successfully pumped through 6 ft of perforation interval and followed by a controlled flowback. Resin-coated bauxite proppant was specifically selected to overcome the creep and embedment effects during the fracture closure and flowback. Moreover, a properly designed choke schedule was implemented to balance unloading with a delicate enough drawdown to avoid formation failure. This paper discusses in detail the lab testing, evolution of fracturing design, treatment analysis, and the robust workflow that led to successfully achieving all main objectives, paving the way for long horizontal lateral wells. This unconventional undertaking in Kuwait presents a real challenge. It is a departure from traditional methods, yet it points toward a high upside potential should the appraisal campaign be completed effectively.