tbm penetration rate
Recently Published Documents


TOTAL DOCUMENTS

32
(FIVE YEARS 13)

H-INDEX

8
(FIVE YEARS 2)

Author(s):  
Qiuming Gong ◽  
Hongyi Xu ◽  
Jianwei Lu ◽  
Fan Wu ◽  
Xiaoxiong Zhou ◽  
...  

2021 ◽  
pp. 111-123
Author(s):  
Wengang Zhang ◽  
Yanmei Zhang ◽  
Xin Gu ◽  
Chongzhi Wu ◽  
Liang Han

2020 ◽  
Vol 2020 ◽  
pp. 1-15
Author(s):  
Yan Zhang ◽  
Mingdong Wei ◽  
Guoshao Su ◽  
Yao Li ◽  
Jianbin Zeng ◽  
...  

In the construction of rock tunnels, the penetration rate of the tunnel boring machine (TBM) is influenced by many factors (e.g., geomechanical parameters), some of which are highly uncertain. It is difficult to establish a precise model for predicting the penetration rate on the basis of the influencing factors. Thus, this work proposed a useful method, based on the relevance vector machine (RVM) and particle swarm optimization (PSO), for the prediction of the TBM penetration rate. In this method, the RVM played a vital role in establishing a nonlinear mapping relationship between the penetration rate and its influencing factors through training-related samples. Then, the penetration rate could be predicted using some collected data of the influencing factors. As for the PSO, it helped to find the optimum value of a key parameter (called the basis function width) that was needed in the RVM model. Subsequently, the validity of the proposed RVM-PSO method was checked with the data monitored from a rock tunnel. The results showed that the RVM-PSO method could estimate the penetration rate of the TBM, and it proved superior to the back-propagation artificial neural network, the least-squares support vector machine, and the conventional RVM methods, in terms of the prediction performance. Moreover, the proposed RVM-PSO method could be applied to identify the difference in the importance of the various factors affecting the TBM penetration rate prediction for a tunnel.


Geosaberes ◽  
2020 ◽  
Vol 11 ◽  
pp. 467
Author(s):  
Alireza Afradi ◽  
Arash Ebrahimabadi ◽  
Tahereh Hallajian

One of the most important issues in mechanized excavating is to predict the TBM penetration rate. Understanding the factors influencing the rate of penetration is important, which allows for a more accurate estimation of the stopping and excavating times and operating costs. In this study, Input and output parameters including Uniaxial Compressive Strength (UCS), Brazilian Tensile Strength (BTS), Peak Slope Index (PSI), Distance between Planes of Weakness (DPW), Alpha angle and Rate of Penetration (ROP) (m/hr) in the Queens Water Tunnel using support vector machine .Results showed that prediction of penetration rate for Support Vector Machine (SVM) method is R2 = 0.9678 and RMSE = 0.064778, According to the results, Support Vector Machine (SVM) is effective and has high accuracy.


Sign in / Sign up

Export Citation Format

Share Document