Combined effects of blasting and geological structure on rock mass stability—a case study from the Marrakech–Agadir highway, Morocco

2016 ◽  
Vol 76 (2) ◽  
pp. 815-828
Author(s):  
Taoufik Benchelha ◽  
Toufik Remmal ◽  
Rachid El Hamdouni ◽  
Hussein Ejjaouani ◽  
Hammou Mansouri ◽  
...  
2020 ◽  
Vol 12 (23) ◽  
pp. 3923
Author(s):  
Paweł Sopata ◽  
Tomasz Stoch ◽  
Artur Wójcik ◽  
Dawid Mrocheń

Seismic phenomena threaten land-based buildings, structures, and infrastructure and can transform land topography. There are two basic types of seismic phenomena, namely, tectonic and anthropogenic, which differ mainly in epicenter depth, surface impact range, and magnitude (energy). This article shows how a land surface was changed by a series of seven rock mass tremors of magnitude ML = 2.3–2.6 in March–May 2017. Their immediate cause was the “momentary” acceleration of void clamping, which was activated by local and short-term seismic phenomena caused by human activity. The induced seismic events resulted from the geological structure of the rock mass, which in the specific region of examination was classified as being highly prone to mining tremors. The authors focused on describing vertical surface displacements in the Upper Silesian Coal Basin in the south of Poland. The surface deformations were identified using DInSAR technology, which allows quasi-continuous monitoring of large areas of land surface. The present research used freely available data from the Copernicus Program and seismic data from the European Plate Observing System.


2020 ◽  
Vol 12 (1) ◽  
pp. 1094-1104
Author(s):  
Nima Dastanboo ◽  
Xiao-Qing Li ◽  
Hamed Gharibdoost

AbstractIn deep tunnels with hydro-geological conditions, it is paramount to investigate the geological structure of the region before excavating a tunnel; otherwise, unanticipated accidents may cause serious damage and delay the project. The purpose of this study is to investigate the geological properties ahead of a tunnel face using electrical resistivity tomography (ERT) and tunnel seismic prediction (TSP) methods. During construction of the Nosoud Tunnel located in western Iran, ERT and TSP 303 methods were employed to predict geological conditions ahead of the tunnel face. In this article, the results of applying these methods are discussed. In this case, we have compared the results of the ERT method with those of the TSP 303 method. This work utilizes seismic methods and electrical tomography as two geophysical techniques are able to detect rock properties ahead of a tunnel face. This study shows that although the results of these two methods are in good agreement with each other, the results of TSP 303 are more accurate and higher quality. Also, we believe that using another geophysical method, in addition to TSP 303, could be helpful in making decisions in support of excavation, especially in complicated geological conditions.


2021 ◽  
Author(s):  
Lidia Loiotine ◽  
Marco La Salandra ◽  
Gioacchino Francesco Andriani ◽  
Eliana Apicella ◽  
Michel Jaboyedoff ◽  
...  

<p><em>InfraRed Thermography</em> (IRT) spread quickly during the second half of the 20<sup>th</sup> century in the military, industrial and medical fields. This technique is at present widely used in the building sector to detect structural defects and energy losses. Being a non-destructive diagnostic technique, IRT was also introduced in the Earth Sciences, especially in the volcanology and environmental fields, yet its application for geostructural surveys is of recent development. Indeed, the acquisition of thermal images on rock masses could be an efficient tool for identifying fractures and voids, thus detecting signs of potential failures.<br>Further tests of thermal cameras on rock masses could help to evaluate the applicability, advantages and limits of the IRT technology for characterizing rock masses in different geological settings.<br>We present some results of IRT surveys carried out in the coastal area of Polignano a Mare (southern Italy), and their correlation with other remote sensing techniques (i.e. <em>Terrestrial Laser Scanning</em> and <em>Structure from Motion</em>). The case study (<em>Lama Monachile</em>) is represented by a 20 m-high cliff made up of Plio-Pleistocene calcarenites overlying Cretaceous limestones. Conjugate fracture systems, karst features, folds and faults, were detected in the rock mass during field surveys. In addition, dense vegetation and anthropogenic elements, which at places modified the natural setting of the rock mass, represent relevant disturbances for the characterization of the rock mass. In this context, IRT surveys were added to the other techniques, aimed at detecting the major discontinuities and fractured zones, based on potential thermal anomalies. <br>IRT surveys were carried out in December 2020 on the east side of the rock mass at <em>Lama Monachile</em> site. Thermal images were acquired every 20 minutes for 24 hours by means of a FLIR T-660 thermal imager mounted on a fixed tripod. Ambient air temperature and relative humidity were measured during the acquisition with a pocketsize thermo-hydrometer. A reflective paper was placed at the base of the cliff to measure the reflected apparent temperature. In addition, three thermocouple sensors were fixed to the different lithologic units of the rock face. These parameters, together with the distance between the FLIR T-660 and the rock face, were used in order to calibrate the thermal imager and correct the apparent temperatures recorded by the device, during the post-processing phase. Successively, vertical profiles showing the temperature of the rock face over time were extracted from the thermograms. Thermal anomalies were correlated with stratigraphic and Geological Strength Index profiles, obtained by means of field surveys and Structure from Motion techniques. The presence of fracture and voids in the rock mass was also investigated.</p>


2021 ◽  
pp. 26-31
Author(s):  
M. P. Sergunin ◽  
T. P. Darbinyan ◽  
T. S. Mushtekenov ◽  
V. V. Balandin

Mineral mining in rockburst-hazardous conditions should involve various precautions in compliance with federal regulations and standards. One of the main methods to prevent rock bursts is destressing drilling. In this method, a yielding zone is artificially created. The strength and deformation characteristics in this zone differ from the same characteristics of enclosing rock mass, and redistribution of stresses takes place as a result. Efficiency of destressing drilling is estimated in terms of ore body S-2 in Komsomolsky Mine. The efficiency criterion is selected to be the safety factor of rock mass with and without destressing drilling. Low efficiency of destressing drilling means that this method is readily replaceable by the other techniques of lesser labor input, for example, by reduction in the rate of mining, or by seasoning of underground excavations for some time required for redistribution of stresses to take place. Based on the theoretical research and the conclusions drawn at NorNickel’s Polar Division, the full-scale tests are scheduled for the implementation in order to gradually abandon destessing drilling in rockburst-hazardous Talnakh and Oktyabrsky ore fields. The authors appreciate participation of V. P. Marysyuk from NorNickel’s Polar Division in this study.


Sign in / Sign up

Export Citation Format

Share Document