Wastewater disinfection: long-term laboratory and full-scale studies on performic acid in comparison with peracetic acid and chlorine

2020 ◽  
Vol 184 ◽  
pp. 116169 ◽  
Author(s):  
Patrizia Ragazzo ◽  
Nicoletta Chiucchini ◽  
Valentina Piccolo ◽  
Monica Spadolini ◽  
Stefano Carrer ◽  
...  
Energies ◽  
2019 ◽  
Vol 12 (6) ◽  
pp. 1035 ◽  
Author(s):  
Magnus Harrold ◽  
Pablo Ouro

Tidal turbines are subject to highly dynamic mechanical loading through operation in some of the most energetic waters. If these loads cannot be accurately quantified at the design stage, turbine developers run the risk of a major failure, or must choose to conservatively over-engineer the device at additional cost. Both of these scenarios have consequences on the expected return from the project. Despite an extensive amount of research on the mechanical loading of model scale tidal turbines, very little is known from full-scale devices operating in real sea conditions. This paper addresses this by reporting on the rotor loads measured on a 400 kW tidal turbine. The results obtained during ebb tidal conditions were found to agree well with theoretical predictions of rotor loading, but the measurements during flood were lower than expected. This is believed to be due to a disturbance in the approaching flood flow created by the turbine frame geometry, and, to a lesser extent, the non-typical vertical flow profile during this tidal phase. These findings outline the necessity to quantify the characteristics of the turbulent flows at sea sites during the entire tidal cycle to ensure the long-term integrity of the deployed tidal turbines.


2011 ◽  
Vol 63 (8) ◽  
pp. 1629-1637 ◽  
Author(s):  
N. Harouiya ◽  
S. Martin Rue ◽  
S. Prost-Boucle ◽  
A. Liénar ◽  
D. Esser ◽  
...  

Phosphorus (P) removals in constructed wetlands (CWs) have received particular attention in recent decades by using specific materials which promote adsorption/precipitation mechanisms. Recent studies have shown interest in using apatite materials to promote P precipitation onto the particle surface. As previous trials were mainly done by lab experiments, this present study aims to evaluate the real potential of apatites to remove P from wastewater in pilot units and a full-scale plant over a 2 year period. P retention kinetics of two qualities of apatites are presented and discussed. In this work apatite appears to have high retention capacity (>80% of P removal) and is still an interesting way for P removal in CWs for limiting the risk of eutrophication downstream of small communities. Nevertheless, the apatite quality appears to be of great importance for a reliable and long term P removal. The use of materials with low content of apatite mineral (40–50%) seems to be not economically relevant.


2022 ◽  
Vol 8 (1) ◽  
pp. 04021019
Author(s):  
Robert Pitt ◽  
Megan Otto ◽  
Adam Questad ◽  
Stacey Isaac ◽  
Maia Colyar ◽  
...  

2009 ◽  
Vol 27 (11) ◽  
pp. 1879-1883 ◽  
Author(s):  
Christian Carrie ◽  
Jacques Grill ◽  
Dominique Figarella-Branger ◽  
Valerie Bernier ◽  
Laetitia Padovani ◽  
...  

Purpose To determine event free and overall survival, and long-term cognitive sequelae of children with standard-risk medulloblastoma (SRM) treated with hyperfractionated radiotherapy, conformal reduced boost volume without chemotherapy, and online quality assurance. Patients and Methods Forty-eight patients (age 5 to 18 years) were included in the Medulloblastoma-Société Française d'Oncologie Pédiatrique (MSFOP 98) protocol (December 1998 to October 2001). Patients received hyperfractionated radiotherapy (HFRT; 36 Gy, 1 Gy/fraction twice per day) to the craniospinal axis followed by a boost to the tumor bed (1.5-cm margin) to a dose of 68 Gy. Records of craniospinal irradiation were reviewed before treatment started. Neuropsychologic evaluations were done according to the protocol (1, 3, 5, and 7 years after irradiation). Cognitive outcomes were followed longitudinally with full-scale intelligence quotient (FSIQ) obtained with age-adapted Wechsler scales. Results After a median follow-up of 77.7 months, 6-year overall survival (OS) and event-free survival (EFS) rates for the cohort were 78% (95% CI, 66% to 90%) and 75%, respectively (95% CI, 62% to 87%). Thanks to quality control, 14 major deviations were detected. Annual full scale IQ decline was 2 points over a 6-year period. Predicted change in FSIQ points per year was 2.15 (95% CI, −1.24 to 3.51) with an intercept (ie, predicted FSIQ) of 93.57 at baseline. Conclusion HFRT protocol with conformal reduced boost and online quality control allows excellent long-term OS and EFS in the absence of chemotherapy. In addition, FSIQ drops seem to be less pronounced than previously reported with standard irradiation regimens.


Sign in / Sign up

Export Citation Format

Share Document